Extra solar install, how does export work ?

Options
2

Comments

  • ispookie666
    ispookie666 Posts: 1,194 Forumite
    Part of the Furniture 1,000 Posts Name Dropper Combo Breaker
    edited 31 July 2024 at 8:43AM
    I read this as 
    1. The old system has a 5 KW export
    2. New system - generation capacity of 5KW and zero export(permission to install 5KW generation capacity) 
    “Don't raise your voice, improve your argument." - Desmond Tutu

    System 1 - 14 x 250W SunModule SW + Enphase ME215 microinverters (July 2015)
    System 2 - 9.2 KWp + Enphase IQ7+ and IQ8AC (Feb 22 & Sep 24) + Givenergy AC Coupled inverter + 2 * 8.2KWh Battery (May 2022) + Mitsubishi 7.1 KW and 2* Daikin 2.5 KW A2A Heat Pump
  • Reed_Richards
    Reed_Richards Posts: 5,274 Forumite
    Part of the Furniture 1,000 Posts Photogenic Name Dropper
    I read this as 
    1. The old system has a 5 KW export
    2. New system - installed capacity of 5KW and zero export(permission to install 5KW generation capacity) 
    I don't think that is what the OP thinks they have applied to their DNO for, but they don't seem willing to offer clarification.
    Reed
  • nologo
    nologo Posts: 188 Forumite
    Tenth Anniversary 100 Posts Name Dropper
    hi back again, my understanding is the MCS installer applies to the DNO, prior to the installation (unless under 3.6ish kW) or am I mistaken, hope so it's going on Friday🙂
    Deepest Kent. 4.6kW Growatt inverter, solar i boost+ 5.9kW Solar Edge

    ok so far...
  • NedS
    NedS Posts: 4,488 Forumite
    Fifth Anniversary 1,000 Posts Photogenic Name Dropper
    nologo said:
    hi back again, my understanding is the MCS installer applies to the DNO, prior to the installation (unless under 3.6ish kW) or am I mistaken, hope so it's going on Friday🙂
    Yes, you must have permission from the DNO to connect any generating equipment with capacity over 3.6kW before the work begins. It does not matter who applies for permission, you or the installer, but you must have that permission before work begins.


  • Qyburn
    Qyburn Posts: 3,578 Forumite
    Fifth Anniversary 1,000 Posts Name Dropper
    I'm pretty sure the G.99 application asks for details of any existing generation.
  • Solarchaser
    Solarchaser Posts: 1,758 Forumite
    Sixth Anniversary 1,000 Posts Name Dropper
    I disagree.  You were accepted onto the Octopus tariff for your existing solar system and would have had to provide them with details of the MCS accreditation.  If you are adding more panels you ought to tell Octopus.

    Also, "a new 5kW dno permit" surely just allows you to export 5 kW?  You need a 10 kW DNO permit to cover your total export.
    I asked octopus about an export limit in terms of numbers of KW or KWH and their answer was there is no limit.

    My plan is to charge batteries on the 7p rate and export during the day for 15p.

    Green and ethically I'll be exporting between 7-9am and 3:30 and 7:30pm

    I also plan to export all my solar
    West central Scotland
    4kw sse since 2014 and 6.6kw wsw / ene split since 2019
    24kwh leaf, 75Kwh Tesla and Lux 3600 with 60Kwh storage
  • Reed_Richards
    Reed_Richards Posts: 5,274 Forumite
    Part of the Furniture 1,000 Posts Photogenic Name Dropper
    .....
    My plan is to charge batteries on the 7p rate and export during the day for 15p.

    Green and ethically I'll be exporting between 7-9am and 3:30 and 7:30pm

    I also plan to export all my solar
    Charging the batteries and exporting would get you 8p per kWh per day (ignoring any "round trip" losses).  And you have 60 kWh of usable storage?  If so that would get you £4.80 per day or £1753.2 per year.  But the batteries and the inverter controlling them must have cost a fair bit so I wonder how many years at £1753.2 would cover that cost?    
    Reed
  • nologo
    nologo Posts: 188 Forumite
    Tenth Anniversary 100 Posts Name Dropper
    edited 1 August 2024 at 5:06PM
    hi update reply from Octopus via email, 
     "Once the installation is complete,make sure to obtain the following documents from you MCS installer,

    Export MPAN, MCS Certificate, Letter from the DNO (also known as G99/G98)

    0nce you have these documents please email them to us to review the information and advise the outcome and next steps"
      
    This was sent from my account,so they are aware that I already export, I am sure they would have had a look at my details before replying?( or maybe not)

    ps
    Phone call from Installer today, roofer has fallen from ladder, may be a delay.....get well soon
    Deepest Kent. 4.6kW Growatt inverter, solar i boost+ 5.9kW Solar Edge

    ok so far...
  • nologo
    nologo Posts: 188 Forumite
    Tenth Anniversary 100 Posts Name Dropper
    All installed yesterday,as specified
    no visible cabling,
     agreed layout,
    5.95kW less than£6000. 

    (new installation on the right)
    all in I'm delighted and thanks to 
    screwdriver for his assistance in this 
    regards,nologo
    Deepest Kent. 4.6kW Growatt inverter, solar i boost+ 5.9kW Solar Edge

    ok so far...
  • Screwdriva
    Screwdriva Posts: 1,519 Forumite
    Fifth Anniversary 1,000 Posts Name Dropper Photogenic
    Looks very clean and matches the existing installation well!
    -  10 x 400w LG + 6 x 550W SHARP BiFacial Panels + SE 3680 HD Wave Inverter + SE Optimizers. SE London.
    -  Triple aspect. (22% ENE/ 33% SSE/ 45% WSW)
    -  Viessmann 200-W on Advanced Weather Comp. (the most efficient gas boiler sold)

    Feel free to DM me if I can help with any energy saving!
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 350.8K Banking & Borrowing
  • 253.1K Reduce Debt & Boost Income
  • 453.5K Spending & Discounts
  • 243.8K Work, Benefits & Business
  • 598.7K Mortgages, Homes & Bills
  • 176.8K Life & Family
  • 257.1K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.1K Discuss & Feedback
  • 37.6K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.