Bathroom Renovation
Options
Comments
-
Wired in for the pump and the underfloor heating, tiling should be finished this week, basin and unit fitted and floor laid.0
-
Lookin good! Before during and after pix are always a must when doing jobs like that, you can really see the huge difference you've made!0
-
Looks good andrew-b as I didn't have the time and this was a major refit I got someone in to it, I just do the electrics myself.
Next project to get the loft ladder sorted out and a light tunnel and that should be done in the next week or so as its another messy job.0 -
Getting closer to the completion........0
-
Updates if anyone is interested, lots of views but not many comments ;o))))))
Also have a loft ladder fitted.0 -
Steaming ahead there its looking fabulous! I was in a local bathroom shop today mooching around as Im going to rip out my main bathroom and WC and make it one room and refit it, so Im watching this thread with interest!0
-
Welsh_Totster wrote: »Steaming ahead there its looking fabulous! I was in a local bathroom shop today mooching around as Im going to rip out my main bathroom and WC and make it one room and refit it, so Im watching this thread with interest!
Floor tiles to be laid, sink fitted, under sink unit fitted and then the light tunnel cut in on the landing.
Hopefully another few days and its done..........0 -
Cant wait to see the finished product!0
-
I do recommend Duravit and Hansgrohe and my only regret is the wall the toilet is on wasn't deep enough to have it flush to the wall but the protrusion looks a lot better than I thought it would.
Floor tiles to be laid, sink fitted, under sink unit fitted and then the light tunnel cut in on the landing.
Hopefully another few days and its done..........
Looks a very neat installation, Would have used standard plasterboard on walls and tanked myself but every installer has there preferences
Did you use a Partition wall Geberit frame or a standard ? Need around 115mm of space for a partition wall frame, 160mm for standardHi, we’ve had to remove your signature. If you’re not sure why please read the forum rules or email the forum team if you’re still unsure0 -
What a fab job! Looks lovely. I love looking at befores and afters and watch all those type telly programs. My OH is a builder and you know how it goes they fix everyone elses except your own! We have loads of unfinished jobs. Will have to show him these pics. I bet you cant wait to lie in your bath and admire the finished room?0
This discussion has been closed.
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 350.9K Banking & Borrowing
- 253.1K Reduce Debt & Boost Income
- 453.5K Spending & Discounts
- 243.9K Work, Benefits & Business
- 598.8K Mortgages, Homes & Bills
- 176.9K Life & Family
- 257.2K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.6K Read-Only Boards