We’d like to remind Forumites to please avoid political debate on the Forum.

This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.

📨 <b>Have you signed up to the Forum's <a href="https://forums.moneysavingexpert.com/discussion/6612556/new-feature-get-sent-trending-forum-threads-by-email?utm_source=banner">new Email Digest</a> yet? </b>Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!

Anyone now powering their home / exporting via their EV (V2X)? Tariff query..

2

Comments

  • Reed_Richards
    Reed_Richards Posts: 5,946
    Part of the Furniture 1,000 Posts Photogenic Name Dropper
    Forumite

    This what Google AI has to say (which may or may not be correct)

    The Zaptec Go 2 does not feature a traditional software export cap or live, standalone energy export capability out of the box. While marketed heavily as a "V2G-ready" (Vehicle-to-Grid) bidirectional AC EV charger, its current limitations dictate how it handles grid interactions: [1]

    1. Hardware Ready, Software Pending

    The Zaptec Go 2 includes advanced ISO 15118-20 compliance and bidirectional AC hardware. However, as of late 2026, it does not support live export capability as a standalone unit in the UK. Zaptec specifies that full vehicle-to-grid or vehicle-to-home (V2H) export registration requires a broader, certified complete energy ecosystem. [1, 2]

    2. Grid Regulations & Export Limits (G100/G99)If you are planning to eventually use the Zaptec Go 2 for power export (once the vehicle and provider ecosystem fully matures), it operates between 7.4 kW and 22 kW. Because this exceeds the standard UK domestic G98 notification threshold of 3.68 kW, it falls under stricter regulations: [3]

    G99 Application Required: Your installer must submit a full G99 application to your local Distribution Network Operator (DNO) to get engineering approval for bidirectional use. [3]

    G100 Export Cap: If the DNO determines that your local grid infrastructure cannot safely handle full bidirectional power, they will enforce a G100 export limit. This hard cap physically limits how much power your entire household system (car charger, solar inverter, battery) can push back into the grid at any given moment. [3]

    [1] https://teslacharger.co.uk/chargers/zaptec-go-2/

    [2] https://shop.ukevinstallers.co.uk/product/zaptec-go2-7-4kw-ev-charge-point-black/

    [3] https://www.bestchargers.co.uk/g99-approval-v2h-v2g-uk/

    Reed
  • QrizB
    QrizB Posts: 25,126
    10,000 Posts Fifth Anniversary Photogenic Name Dropper
    Forumite

    Here's what Zaptec say about V2X:

    https://help.zaptec.com/installation/how-to-install-zaptec-go-2-as-v2g-ready-in-the-uk

    At the moment, ENA does not support a fast‑track V2G connection for AC chargers alone. The rules require the full system (vehicle + charger) to be certified for V2G. Because of this, Zaptec Go 2 does not appear under Generation > V2G Charging Device.

    ...

    When Zaptec Go 2 is certified for interoperable AC V2G and any required protection is fitted, the installer will be able to reapply via ENA Connect Direct for a V2G connection approval for the same site.

    So it looks like you can't currently install it for V2G (and I suspect you also can't install it for V2H either, unless you disconnect your house from the grid). And as and when it is certified for V2G, you might need extra hardware fitting.

    OP have your installers told you something different?

    N. Hampshire, he/him. Octopus Intelligent Go elec / Fuse gas / Vodafone BB / iD mobile. Kirk Hill Co-op member.
    2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 37 MWh generated, long-term average 2.6 Os.
    Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Ecoflow Stream, Best kettle :-)
  • Reed_Richards
    Reed_Richards Posts: 5,946
    Part of the Furniture 1,000 Posts Photogenic Name Dropper
    Forumite

    The thing that concerns me is that even if you only want V2H, can you stop little bit of V2G? My solar inverter, which admittedly is 8 years old now, can't cope with a high-power device like a kettle suddenly turning off (as kettles do). It ramps the power output down over several seconds and whilst that is happening the surplus power gets exported to the grid.

    Reed
  • QrizB
    QrizB Posts: 25,126
    10,000 Posts Fifth Anniversary Photogenic Name Dropper
    Forumite

    The thing that concerns me is that even if you only want V2H, can you stop little bit of V2G?

    You'd need to switch your house over into off-grid mode with the home gateway. Otherwise you're right; trying to V2H onto a circuit that's connected to the grid will mean spilling power onto the grid, which is V2G and needs G99 etc.

    N. Hampshire, he/him. Octopus Intelligent Go elec / Fuse gas / Vodafone BB / iD mobile. Kirk Hill Co-op member.
    2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 37 MWh generated, long-term average 2.6 Os.
    Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Ecoflow Stream, Best kettle :-)
  • Reed_Richards
    Reed_Richards Posts: 5,946
    Part of the Furniture 1,000 Posts Photogenic Name Dropper
    Forumite

    The OP has not mentioned a home gateway, in addition to their chosen EV and charger. Presumably this home gateway would need to know the state of charge of the car battery and communicate with the Zaptec charger so it would know when to switch between off-grid and on-grid modes?

    Reed
  • pensionpawn
    pensionpawn Posts: 1,085
    Eighth Anniversary 1,000 Posts Name Dropper
    Forumite

    Hi all, thanks for all the positive feedback, much appreciated. Having an electronics degree and working in the mobile telecommunications industry for many years I have a reasonable understanding of technology, however I am not an electrician and am certainly not an expert on the emerging processes and procedures related to the bi directional EV solution I wish to achieve, which does include a home gateway for island mode. This is my first EV, so all new to me.

    Much of what I have learnt, or misunderstood, in this area has come from my own research (occasionally assisted by Gemini) and conversations with long standing contacts from the solar industry and my current electricians (who I am still waiting to hear from after last week's site survey). Through this I have settled on the Zaptec Go 2 as it would appear to be the best fit (eg, ISO compliance, V2X ready etc) for my circumstances, and not from any fanboy perspective or company loyalty. If anyone wishes to point me in the direction of a better suited bidirectional charger that I should consider, I'm all ears!

    I also hear what you are all saying about the G99 process applying to any new additional export capable "product" installed at a domestic dwelling, even if an existing G99 exists, and a capped export at the existing G99 level is part of the solution proposal. However the feedback, informal at this stage, that I have received is that if the SLD (single line diagram) demonstrates how the cap on export is reliably achieved, then the DNO more likely than not just rubber stamp the installation. Once I've seen my electricians proposal I will know more. A thought did occur to me earlier that if the EV / bidirectional charger export can be capped at 3.6kWs, does this process follow the same path as for solar panels, and a G99 is not required. Anyone know for sure?

    As soon as I hear back from my electricians, I'll bring you all up to date.

  • pensionpawn
    pensionpawn Posts: 1,085
    Eighth Anniversary 1,000 Posts Name Dropper
    Forumite

    A home gateway is definitely part of my design as although I've only experienced 3 power cuts in 30 years of living in my house, I would be spitting feathers if in the near future they become more regular and my house with its significant green investment is as dead as my neighbours when the power goes off! From my discussion with my electricians during their site survey, that's exactly how they described the interaction between the Zaptec and Home Gateway, limiting the maximum export across solar panels and EV to my existing G99 limit of 6kWs.

  • Reed_Richards
    Reed_Richards Posts: 5,946
    Part of the Furniture 1,000 Posts Photogenic Name Dropper
    Forumite

    That's good. Which model of Home Gateway do you plan to use @pensionpawn ?

    Reed
  • pensionpawn
    pensionpawn Posts: 1,085
    Eighth Anniversary 1,000 Posts Name Dropper
    Forumite

    This is a total unknown to me, so I've left it to my electricians to recommend a particular model. If the forum members have any suggestions, I'm all ears.

  • pensionpawn
    pensionpawn Posts: 1,085
    Eighth Anniversary 1,000 Posts Name Dropper
    Forumite

    Hi there. The electricians suggestion is a Niglon MS100ATS to work with the Zaptec Go 2 and earth rod. Thoughts anyone?

★ ★ ★ Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 355.8K Banking & Borrowing
  • 254.9K Reduce Debt & Boost Income
  • 456.2K Spending & Discounts
  • 248.3K Work, Benefits & Business
  • 605.9K Mortgages, Homes & Bills
  • 179K Life & Family
  • 263.7K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.2K Discuss & Feedback
  • 37.7K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.