We’d like to remind Forumites to please avoid political debate on the Forum.

This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.

📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!

Heat geek design consultation worth paying £250 for?

2»

Comments

  • mhfmm
    mhfmm Posts: 2 Newbie
    First Post
    Not sure I'm buying the ZeroDisrupt premise from Heat Geek.
  • NedS
    NedS Posts: 4,854 Forumite
    Sixth Anniversary 1,000 Posts Photogenic Name Dropper
    edited 29 October at 10:35AM
    mhfmm said:
    Not sure I'm buying the ZeroDisrupt premise from Heat Geek.
    I get how some people may not want the disruption and may be willing to pay for that with lower efficiency and higher running costs (although do they really understand that is the choice they are making?), but we were happy to have a week of total disruption whilst the installers replaced all plumbing and radiators knowing we would achieve good flow rates and low flow temperatures from a properly optimised design.
    It's a choice, and I guess it's good to have options, but like you I'm a little sceptical.

    Our green credentials: 12kW Samsung ASHP for heating, 7.2kWp Solar (South facing), Tesla Powerwall 3 (13.5kWh), Net exporter
  • thevilla
    thevilla Posts: 390 Forumite
    Seventh Anniversary 100 Posts Name Dropper
    edited 29 October at 6:59PM
    Heat Geek still offer an efficiency guarantee for their installs so theoretically their zero disrupt approach isn't too risky.
    I found this video offering an interesting approach whereby the system is installed then 'tweaked' after a winter's experience. Radiator changes etc only as needed.


    Edit: good to see a recognition that waiting weeks for an installation isn't a realistic approach especially to boiler breakdown opportunities.
    4.7kwp PV split equally N and S 20° 2016.
    Givenergy AIO (2024)
    Seat Mii electric (2021).  MG4 Trophy (2024).
    1.2kw Ripple Kirk Hill. 0.6kw Derril Water.
    Vaillant aroTHERM plus 5kW ASHP (2025)
    Gas supply capped (2025)

Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 352.2K Banking & Borrowing
  • 253.6K Reduce Debt & Boost Income
  • 454.3K Spending & Discounts
  • 245.3K Work, Benefits & Business
  • 601K Mortgages, Homes & Bills
  • 177.5K Life & Family
  • 259.1K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16K Discuss & Feedback
  • 37.7K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.