So like this? Have set mine up using the app.
Just sorting the switch with Octopus now.4.3kwp JA panels, Huawei 3.68kw Hybrid inverter, Huawei 10kw Lunar 2000 battery, Myenergi eddi, South facing array with a 15 degree roof pitch, winter shade.1 -
EcoScruples said:
So like this? Have set mine up using the app.
Just sorting the switch with Octopus now.
0 -
powerful_Rogue said:EcoScruples said:
So like this? Have set mine up using the app.
Just sorting the switch with Octopus now.On Huawei, the Time Of Use options are:- Discharging, where the battery will be used to meet any load that exceeds solar generation.- Charging, where the battery is charged from the grid- No setting, where the battery level is maintained and any load that exceeds solar generation is supplied from the grid.6.4kWp (16 * 400Wp REC Alpha) facing ESE + 5kW Huawei inverter + 10kWh Huawei battery. Buckinghamshire.1 -
Magnitio said:powerful_Rogue said:EcoScruples said:
So like this? Have set mine up using the app.
Just sorting the switch with Octopus now.On Huawei, the Time Of Use options are:- Discharging, where the battery will be used to meet any load that exceeds solar generation.- Charging, where the battery is charged from the grid- No setting, where the battery level is maintained and any load that exceeds solar generation is supplied from the grid.
0 -
It is very frustrating seeing the weather start to pick up but I cant get paid for my export as Octopus are unable to install a smart meter at my place yet...YNWA
Target: Mortgage free by 58.0 -
Niv said:It is very frustrating seeing the weather start to pick up but I cant get paid for my export as Octopus are unable to install a smart meter at my place yet...0
-
I'm on Flux import but not export yet.. I guess I should have kept my "go" swapped my export to Octopus THEN switched to Flux. Oh well I'm sure it will get sorted eventually, its just over 2 weeks since I switched and only the last couple of days would have seen me exporting any significant amount.
EDIT Just had my account updated to say "export MPAN should start on 7 April", if that happens it will be about 2.5 weeks since my switch to FLUX.. not bad as this includes moving me from Eon
3.995kWP SSW facing. Commissioned 7 July 2011. 24 degree pitch (£3.36 /W).
17 Yingli 235 panels
Sunnyboy 4000TL inverter
Sunny Webox
Solar Immersion installed May 2013, after two Solar Immersion lasting just over the guarantee period replaced with Solic 200... no problems since.
13 Feb 2020 LUX AC 3600 and 3 X Pylon Tech 3.5 kW batteries added...
20 January 2024 Daikin ASHP installed1 -
Unclefoobar said:Niv said:It is very frustrating seeing the weather start to pick up but I cant get paid for my export as Octopus are unable to install a smart meter at my place yet...YNWA
Target: Mortgage free by 58.0 -
How long do Octopus normally take to set up new export customers, recently moved to them after getting solar & battery fitted, frustrating to be exporting electric on nice days without payment currently0
-
Loving this tariff and certainly looking forward to much longer sunnier days.2
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.2K Banking & Borrowing
- 253.2K Reduce Debt & Boost Income
- 453.7K Spending & Discounts
- 244.2K Work, Benefits & Business
- 599.3K Mortgages, Homes & Bills
- 177K Life & Family
- 257.6K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.6K Read-Only Boards