We'd like to remind Forumites to please avoid political debate on the Forum... Read More »
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Octopus Heat Pumps
Options
Comments
-
I would suggest Octopus installs are more likely to be taking advantage of TOU tariffs like Cosy/Go/Intelligent.
Yes, I think the Octopus proposition is based on cost per delivered kWh of heat, rather than ultimate efficiency. Most people understand £s far better than kWh.
0 -
The current top performer at about 5 but the room temp is being maintained below 14C:
0 -
Meatballs said:The current top performer at about 5 but the room temp is being maintained below 14C:
N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Vodafone BB / iD mobile. Ripple Kirk Hill member.
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 34 MWh generated, long-term average 2.6 Os.Not exactly back from my break, but dipping in and out of the forum.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!1 -
Did anyone have an initial quote from Octopus back at the end of October has at least made an appointment for the survey yet?
I paid my £500 deposit on 23rd October and at that point the indication was an 8 week wait period (I presume to just get the opportunity to make the appointment) due to high demand.
I have since seen adverts by Octopus for heat pump engineers, so they are hiring, probably due to the high demand.
Apart from a few standard emails, saying "You are still in the queue, thanks for being patient", the last one on the 20th November, I have heard nothing yet.
Is it worth giving them a call, or is everyone else waiting too?0 -
Meatballs said:And 3.6 basically brings the cost of heating to almost equivalent as gas anyway (on the standard rate tariffs)
- 10 x 400w LG + 6 x 550W SHARP BiFacial Panels + SE 3680 HD Wave Inverter + SE Optimizers. SE London.
- Triple aspect. (22% ENE/ 33% SSE/ 45% WSW)
- Viessmann 200-W on Advanced Weather Comp. (the most efficient gas boiler sold)Feel free to DM me if I can help with any energy saving!0 -
Screwdriva said:Meatballs said:And 3.6 basically brings the cost of heating to almost equivalent as gas anyway (on the standard rate tariffs)Reed4
-
rjmachin said:Did anyone have an initial quote from Octopus back at the end of October has at least made an appointment for the survey yet?
I paid my £500 deposit on 23rd October and at that point the indication was an 8 week wait period (I presume to just get the opportunity to make the appointment) due to high demand.
I have since seen adverts by Octopus for heat pump engineers, so they are hiring, probably due to the high demand.
Apart from a few standard emails, saying "You are still in the queue, thanks for being patient", the last one on the 20th November, I have heard nothing yet.
Is it worth giving them a call, or is everyone else waiting too?Install 28th Nov 15, 3.3kW, (11x300LG), SolarEdge, SW. W Yorks.
Install 2: Sept 19, 600W SSE
Solax 6.3kWh battery1 -
Exiled_Tyke said:Same for me. Although my last 'thanks for waiting' email was on the 25th Dec.
If anyone has got a survey done recently, would be interesting to know how long the wait was.0 -
Sounds like a good ruse. You get lots of people to give you a £500 "deposit" then sit on all the money for a few months whilst it earns interest for you.Reed0
-
I paid the £500 on 30th Sep. I was offered the monthly £9 service charge free for the 1st year if I signed up by the end of September. Happy to help someone get their monthly sales target if it saves me a few quid.
Survey was done on 14th Nov but several queries raised by the tech team over the following weeks, so "final" documents and contract not received until 29th Nov. Signed and returned next day.
Got phone call a couple of weeks later saying there was a slight possibility we might need planning permission due to noise and they wanted surveyor to call again to check outside distances to neighbours. Had heard nothing since mid Dec. so called Octopus last week to chase. Surveyor will be coming this Thursday.
Still haven't been given an install date, only told springtime.Barnsley, South Yorkshire
Solar PV 5.25kWp SW facing (14 x 375) Lux 3.6kw hybrid inverter installed Mar 22 and 9.6kw Pylontech battery
Daikin 8kW ASHP installed Jan 25
Octopus Cosy/Fixed Outgoing1
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.2K Banking & Borrowing
- 253.2K Reduce Debt & Boost Income
- 453.7K Spending & Discounts
- 244.2K Work, Benefits & Business
- 599.2K Mortgages, Homes & Bills
- 177K Life & Family
- 257.6K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.6K Read-Only Boards