We'd like to remind Forumites to please avoid political debate on the Forum... Read More »
Energy news in general
Comments
-
‘A mess’: energy suppliers face scramble to install smart meters in UK homes
The government is facing criticism over the rollout of the scheme, as spiralling costs and faulty meters slow progress
A small device in every home was supposed to be the key to solving Britain’s energy headaches: encouraging consumers not to waste power, preventing shockingly high bills and making the system greener. Instead, smart meters have become an emblem for the energy industry’s poor reputation as the costs of rolling them out approaches £20bn and the government project lags years behind its original schedule.
Consumers who have the devices still face surprise bills, too, as some faulty meters go into “dumb” mode, where they stop automatically sending regular meter readings to energy suppliers, leaving households to send readings.
1 -
From that article:“Honestly, it has been a mess from the beginning,” an executive at one major energy supplier says. “So many of the problems that we have encountered were predictable and preventable. But we were told to keep pushing ahead towards these deadlines.”And:None of this should come as a surprise to forum regulars; respected voices like @Dolor (now sadly absent) were banging this drum for years.
One of the key complaints made against the government’s plans was the decision to hand responsibility for the rollout to energy suppliers. In other countries, installing smart meters has been a task carried out by the network operators which run local power grids. But in the UK, suppliers lobbied to convince their customers to opt-in to a smart meter installation, in the belief that this might lock in customer loyalty.
“Can you imagine how much money has been spent in this country trying to ‘sell’ smart meters to households, while other countries have treated it like a necessary infrastructure upgrade?” one source said.
N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Vodafone BB / iD mobile. Ripple Kirk Hill member.
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 34 MWh generated, long-term average 2.6 Os.Not exactly back from my break, but dipping in and out of the forum.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!2 -
The American military have a word for it, not allowed on the forum though.The whole programme has been poorly specified, poorly planned and poorly implemented.1
-
Completely agree mandatory roll out, no ifs or buts your choice is a smart meter or no energy.0
-
Yet they still push out these mindless adverts with “Einstein” and Angela Rippon which no doubt end up in our service charges 😡4.8kWp 12x400W Longhi 9.6 kWh battery Giv-hy 5.0 Inverter, WSW facing Essex . Aint no sunshine ☀️ Octopus gas fixed dec 24 @ 5.74 tracker again+ Octopus Intelligent Flux leccy0
-
In other news, the Baltic states cut their connection to the Russian electricity grid this morning and are now part of the Western European grid.There's some video from a transmission station on social media but I haven't yet found a web-linkable version I can share.If you don't mind watching on BlueSky, you'll find it here:
https://bsky.app/profile/noelreports.com/post/3lhq7323s6s22N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Vodafone BB / iD mobile. Ripple Kirk Hill member.
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 34 MWh generated, long-term average 2.6 Os.Not exactly back from my break, but dipping in and out of the forum.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!0 -
https://www.bbc.co.uk/news/articles/cwyplj7dkw2oSubsidies halved for controversial Drax power station
The new agreement also states that 100% of the wood pellets Drax burns must be "sustainably sourced" and that "material sourced from primary and old growth forests" will not be able to receive support payments.In the game of chess you can never let your adversary see your pieces2 -
https://www.bbc.co.uk/news/articles/cwyplj7dkw2oSubsidies halved for controversial Drax power station
The new agreement also states that 100% of the wood pellets Drax burns must be "sustainably sourced" and that "material sourced from primary and old growth forests" will not be able to receive support payments.0 -
-
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.7K Banking & Borrowing
- 253.4K Reduce Debt & Boost Income
- 454K Spending & Discounts
- 244.6K Work, Benefits & Business
- 600K Mortgages, Homes & Bills
- 177.3K Life & Family
- 258.3K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.6K Read-Only Boards