Hello Forumites! In order to help keep the Forum a useful, safe and friendly place for our users, discussions around non-MoneySaving matters are not permitted per the Forum rules. While we understand that mentioning house prices may sometimes be relevant to a user's specific MoneySaving situation, we ask that you please avoid veering into broad, general debates about the market, the economy and politics, as these can unfortunately lead to abusive or hateful behaviour. Threads that are found to have derailed into wider discussions may be removed. Thank you for your understanding.Snagging issues in new build

1.8K Posts


I moved into my house just under two years ago.
I paid a surveyor last week to provide me with a snagging issues report. This included a lot of 'defects' (listed below). I sent this to the builder, and they responded saying that they wouldn't do any remedial work inside the home as it's 'wear and tear' - my shower screen doesn't open and close properly (this just started before the surveyor came out), but IMO, it's a manufacturing fault. I'd expect my shower screen to last more than 2 years for example.
I went back to the surveyor and asked them if they thought this was general wear and tear or defects. They said that 95% of the errors in my home were defects and fell below the building regs/standards, not wear and tear.
Master bedroom only
Findings
On inspection the following faults were found to have been completed below an Industry Standard
finish consistent with Building (Scotland) Regulations 2004 and Construction (Design and
Management) Regulations 2007/2015.
• Plaster uneven and waved to walls and ceiling,
• Wall/ceiling emulsion finish shaded and uneven and marked
• Entrance door opening uneven not in uniform
• Entrance door loose at keeper back plate missing
• Skirting has noted nail pop marks wall seal split below radiator
• Skirting butt jointed instead of mitre
• Architraves nail popped, mitre joints open
• Radiators secured to wall off level
• Wall sockets secured off line out of uniform
• Window sip slopes inwards to room
• Wardrobe door openings not uniform
• Doors on left side bind and do not close
• Glass panels marked
• Shelving center support screw caps missing
Bathroom:
Findings
On inspection the following faults were found to have been completed below an Industry Standard
finish consistent with Building (Scotland) Regulations 2004 and Construction (Design and
Management) Regulations 2007/2015.
• Plaster uneven and waved to ceiling with noted nail pops
• Ceiling emulsion finish shaded and uneven
• Entrance door opening uneven not in uniform hinges proud of plate
• Entrance keeper back plate missing
• Entrance door loose at keeper
• Architraves have noted nail pop
• Basin pedestal no mechanical fixings at floor fix
• Bath panel not secure fixed with no support timbers not sculpted to wall finish
• Radiator secured to wall off level
• Window frame seal incomplete, cracks noted to window reveals
• Window catches at bottom opening
• Mirror backing damaged at upper ceiling edge
• Over paint on ceiling down lights
• Shower plinth screw cap missing
• Window catches on bottom opening
Stairs:
Findings
On inspection the following faults were found to have been completed below an Industry Standard
finish consistent with Building (Scotland) Regulations 2004 and Construction (Design and
Management) Regulations 2007/2015.
• Plaster uneven and waved to walls and ceiling with noted cracks
• Wall/ceiling emulsion finish shaded and uneven
• Upper floor first floor skirting has noted nail pops
• Stairway balustrade and newel posts indented and marked
• Galleried handrail newel post secured in off square position
• Upper window sash catches at bottom opening
• Architraves have noted nail pops
• Skirting mitres open with noted nail pops
• Ceiling finish at loft access hatch open and insecure fixed
• Radiator secured to wall in off level position
• Bottom radiator ok
• Stair stringer bead cracked at wall finish
• Main entrance door opening not in uniform
• Skirting insecure fixed and away from wall
• Door reveals cracked at upper edge
The other rooms are similar.
I paid a surveyor last week to provide me with a snagging issues report. This included a lot of 'defects' (listed below). I sent this to the builder, and they responded saying that they wouldn't do any remedial work inside the home as it's 'wear and tear' - my shower screen doesn't open and close properly (this just started before the surveyor came out), but IMO, it's a manufacturing fault. I'd expect my shower screen to last more than 2 years for example.
I went back to the surveyor and asked them if they thought this was general wear and tear or defects. They said that 95% of the errors in my home were defects and fell below the building regs/standards, not wear and tear.
Master bedroom only
Findings
On inspection the following faults were found to have been completed below an Industry Standard
finish consistent with Building (Scotland) Regulations 2004 and Construction (Design and
Management) Regulations 2007/2015.
• Plaster uneven and waved to walls and ceiling,
• Wall/ceiling emulsion finish shaded and uneven and marked
• Entrance door opening uneven not in uniform
• Entrance door loose at keeper back plate missing
• Skirting has noted nail pop marks wall seal split below radiator
• Skirting butt jointed instead of mitre
• Architraves nail popped, mitre joints open
• Radiators secured to wall off level
• Wall sockets secured off line out of uniform
• Window sip slopes inwards to room
• Wardrobe door openings not uniform
• Doors on left side bind and do not close
• Glass panels marked
• Shelving center support screw caps missing
Bathroom:
Findings
On inspection the following faults were found to have been completed below an Industry Standard
finish consistent with Building (Scotland) Regulations 2004 and Construction (Design and
Management) Regulations 2007/2015.
• Plaster uneven and waved to ceiling with noted nail pops
• Ceiling emulsion finish shaded and uneven
• Entrance door opening uneven not in uniform hinges proud of plate
• Entrance keeper back plate missing
• Entrance door loose at keeper
• Architraves have noted nail pop
• Basin pedestal no mechanical fixings at floor fix
• Bath panel not secure fixed with no support timbers not sculpted to wall finish
• Radiator secured to wall off level
• Window frame seal incomplete, cracks noted to window reveals
• Window catches at bottom opening
• Mirror backing damaged at upper ceiling edge
• Over paint on ceiling down lights
• Shower plinth screw cap missing
• Window catches on bottom opening
Stairs:
Findings
On inspection the following faults were found to have been completed below an Industry Standard
finish consistent with Building (Scotland) Regulations 2004 and Construction (Design and
Management) Regulations 2007/2015.
• Plaster uneven and waved to walls and ceiling with noted cracks
• Wall/ceiling emulsion finish shaded and uneven
• Upper floor first floor skirting has noted nail pops
• Stairway balustrade and newel posts indented and marked
• Galleried handrail newel post secured in off square position
• Upper window sash catches at bottom opening
• Architraves have noted nail pops
• Skirting mitres open with noted nail pops
• Ceiling finish at loft access hatch open and insecure fixed
• Radiator secured to wall in off level position
• Bottom radiator ok
• Stair stringer bead cracked at wall finish
• Main entrance door opening not in uniform
• Skirting insecure fixed and away from wall
• Door reveals cracked at upper edge
The other rooms are similar.
0
This discussion has been closed.
Latest MSE News and Guides
Replies
I believe after 1 year, they are only responsible for major defects, and even then you will have a hard time getting things fixed.
Re decorate, fix the imperfections, move on with your life.
I would go back again to the builders, with your surveyor's confirmation that this is not wear and tear. Make sure you write, I'd be tempted to send an email copy of the letter to the CEO of the company and then also send emails to watchdog and the likes.
Thanks ProDave for your helpful response. FYI:
Thanks Aneary - I don't much care for the paintwork etc, but I expect my window sils not to be leaning inwards and my radiators to be level...IDK, maybe i am being picky about wanting uniform wardrobe doors, but I paid a lot for my house, so I expect it to be perfect, even after 23mths... xx
I think you will be on a hiding to nothing here, how do they know you haven't tried your own hand at a bit of DIY and cocked all these things up.
I have developed numerous properties and carried out snagging at my own expense within the stated snagging notice period, if you came to me 2 years later I would be asking why these things weren't brought to my attention earlier and tell you to take a running jump
Screw caps missing after 2 years?? Really?? If you want to be taken seriously by the builders you really need to take the ridiculous ones off the list and leave just the real issues. Otherwise you'll sound like a nightmare client, and they'll just ignore you.
There are some items on the list that are legitimately covered by the 2 year warranty (i.e. fixings for basin, shower door, issues with windows) - but you need to separate the real issues from the unrealistic demands.
Your surveyor should be advising you better - when I'm doing my site inspections I think it's important to inform the client about what is realistic to include. There hasn't been any adjustment to the list for the 23 months of occupation.
But they are not, the warranty covers the fabric of the building, walls, roof, structure, services etc. The two year period is the period that the developer is responsible for these issues after that period the insurer is responsible for warranty issues.
All of these issues should have been notified as they happened.
The OP has mentioned settlement, that is why there is a stated snagging period, usually 6 months at which point all theses things should have been notified, there may even have been a retention in the contract to cover this. I would go back and check your contract and see what it said about snagging, as all of your issues are snagging and not warranty work, maybe with the exception of the windows.
An extract from the buildmark policy
Who to contact
Contact the builder and tell them if you think they failed to meet the NHBC requirements when building your home or when preparing your land. You must do this as soon as you reasonably can. We recommend that you do this by email or letter and that you keep a detailed record of what you said, and who you wrote or spoke to and when.