We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
The Forum now has a brand new text editor, adding a bunch of handy features to use when creating posts. Read more in our how-to guide
Bathroom refurbishment - let down by plumber
heatherw_01
Posts: 6,851 Ambassador
I had a quote of £1880.00 (£1600 + £280 vat) for the following:
Remove and dispose of existing bathroom suite, tiles and shower. Remove boxing around the bath and replace boxing under toilet suitable for tiling. Make solid the floor (we had water damage) and fit new suite and shower. Patch plaster as necesarry and partial tile and grout around bath, sink and toilet.
This quote does not include the supplying of tiles, shower or suite.
Is this too expensive? It seems a little high in price to say he is not supplying.
The guy did say that if we took out this job with him, he would sort out our central heating for free which includes draining, flushing, adding inhibitor and balancing the system.
Can you haggle with builders to reduce the price?
Any advice would be great.
Remove and dispose of existing bathroom suite, tiles and shower. Remove boxing around the bath and replace boxing under toilet suitable for tiling. Make solid the floor (we had water damage) and fit new suite and shower. Patch plaster as necesarry and partial tile and grout around bath, sink and toilet.
This quote does not include the supplying of tiles, shower or suite.
Is this too expensive? It seems a little high in price to say he is not supplying.
The guy did say that if we took out this job with him, he would sort out our central heating for free which includes draining, flushing, adding inhibitor and balancing the system.
Can you haggle with builders to reduce the price?
Any advice would be great.
I’m a Forum Ambassador and I support the Forum Team on the Quick Grabbit, Freebies, Overseas Holidays & Travel Planning and the UK Holidays, Days Out & Entertainments boards.
If you need any help on these boards, do let me know. Please note that Ambassadors are not moderators. Any posts you spot in breach of the Forum Rules should be reported via the report button, or by emailing forumteam@moneysavingexpert.com.
All views are my own and not the official line of MoneySavingExpert.
If you need any help on these boards, do let me know. Please note that Ambassadors are not moderators. Any posts you spot in breach of the Forum Rules should be reported via the report button, or by emailing forumteam@moneysavingexpert.com.
All views are my own and not the official line of MoneySavingExpert.
0
Comments
-
I spoke to him again and he knocked off the VAT making the job £1600.
Is this any better?I’m a Forum Ambassador and I support the Forum Team on the Quick Grabbit, Freebies, Overseas Holidays & Travel Planning and the UK Holidays, Days Out & Entertainments boards.
If you need any help on these boards, do let me know. Please note that Ambassadors are not moderators. Any posts you spot in breach of the Forum Rules should be reported via the report button, or by emailing forumteam@moneysavingexpert.com.
All views are my own and not the official line of MoneySavingExpert.0 -
heatherw_01 wrote:I spoke to him again and he knocked off the VAT making the job £1600.
Is this any better?
Seems a little on the high side, how many mts of tiling? and is it a seperate shower cubical? or just over the bath(electric or off your H&C water)
And what area you live in South/North.A thankyou is payment enough .0 -
I think it is 5.5 sq meters of tiling. No cubicle. Electric shower.
I am in Yorkshire.
He is doing the radiators included in this price (his price would have been £178)I’m a Forum Ambassador and I support the Forum Team on the Quick Grabbit, Freebies, Overseas Holidays & Travel Planning and the UK Holidays, Days Out & Entertainments boards.
If you need any help on these boards, do let me know. Please note that Ambassadors are not moderators. Any posts you spot in breach of the Forum Rules should be reported via the report button, or by emailing forumteam@moneysavingexpert.com.
All views are my own and not the official line of MoneySavingExpert.0 -
I am so sick of plumbers.
i have been trying since Saturday to arrange for him to do this work for me and I hear by email that he can't do the work anymore!I’m a Forum Ambassador and I support the Forum Team on the Quick Grabbit, Freebies, Overseas Holidays & Travel Planning and the UK Holidays, Days Out & Entertainments boards.
If you need any help on these boards, do let me know. Please note that Ambassadors are not moderators. Any posts you spot in breach of the Forum Rules should be reported via the report button, or by emailing forumteam@moneysavingexpert.com.
All views are my own and not the official line of MoneySavingExpert.0 -
We were let down my plumbers and central heating people when coming to do quotes.
Don't they like work?? It was a full replacement as well in a stripped house.
Easiest job they would have had all year.
Some good guys have just finished today so we are a step closer to moving back in.
BenI beep for Robins - Beep Beep
& Choo Choo for trains!!0 -
BenL wrote:We were let down my plumbers and central heating people when coming to do quotes.
Ben
Thats because, we do have work to do/finnish and if it overruns, we (I ) stop and get the job finnished.
And maybe miss going to give a estimateA thankyou is payment enough .0 -
-
I used to be married to a plumber and he used to take all the work offered to him , and then he would just let people down when he couldn't fit all the work into his schedule............very unfair way of doing business........ and guess who got to answer all the phone calls from his irate customers!!!!
WE ARE NO LONGER MARRIED................
#6 of the SKI-ers Club :j
"All that is necessary for evil to triumph is for good men to do nothing" Edmund Burke0 -
A plumber used to live next door to us. He agreed to install a new bathroom suite, including removing the old one, plus install a new power shower and fully tile three of the four walls all for £400 cash. Did a great job too. His only request was that we allowed him to do it over two weeks so he could fit it in between other jobs. This was a couple of years ago and the grout's still clean, the tiles are still firm and the shower works a treat. Maybe gives you some idea of what value to put on it.am I missing something ??0
-
totally understand what your saying but last yr we rang around abt 20 plumbers for a quote some said it wasnt worth coming out for some said they might come out some said they would call back some made times to call and didnt.. all the time i waited in for calls or missed visits.. we dont call plumbers out for nothing its because we want a job done at a fair price.. ive got a bathroom that needs ripping out and replacing by the time i move in july getting quotes in march fingers crossed and hope will be able to get the job done.. but not holding my breath..plumb1 wrote:Thats because, we do have work to do/finnish and if it overruns, we (I ) stop and get the job finnished.
And maybe miss going to give a estimateThose we love don't go away,They walk beside us every day,Unseen, unheard, but always near,
Still loved, still missed and very dear
Our thoughts are ever with you,Though you have passed away.And those who loved you dearly,
Are thinking of you today.0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 353.5K Banking & Borrowing
- 254.2K Reduce Debt & Boost Income
- 455.1K Spending & Discounts
- 246.6K Work, Benefits & Business
- 603K Mortgages, Homes & Bills
- 178.1K Life & Family
- 260.6K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards