We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
The Forum now has a brand new text editor, adding a bunch of handy features to use when creating posts. Read more in our how-to guide
Broadband
Laurelii
Posts: 130 Forumite
Hi so we have a completion date of feb 18th, our current broadband is with ee and i think we are planning to stick with ee but a better deal, how do we inform them of this or what do we say, will they send anyone out ? we need internet connection starting from the day of completion.
0
Comments
-
Have you checked that they are able to supply the new address as this will not always be the case?Laurelii said:Hi so we have a completion date of feb 18th, our current broadband is with ee and i think we are planning to stick with ee but a better deal, how do we inform them of this or what do we say, will they send anyone out ?
I think even in the best case scenario that is probably unrealistic, especially if the property is not a new build, although one would hope a day or two should be possible.Laurelii said:we need internet connection starting from the day of completion.1 -
Laurelii said:we need internet connection starting from the day of completion.If this is a real need (eg. for working from home or similar) you might want to consider buying a 4G internet router in case things don't go as smoothly as you hope.Or tether to your phone if you have a generous data allowance!N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Vodafone BB / iD mobile. Ripple Kirk Hill Coop member.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 35 MWh generated, long-term average 2.6 Os.0 -
yes they can supply to the new address its the same area as where we are now , we have 3 pre teens and they will be moaning without internetMattMattMattUK said:
Have you checked that they are able to supply the new address as this will not always be the case?Laurelii said:Hi so we have a completion date of feb 18th, our current broadband is with ee and i think we are planning to stick with ee but a better deal, how do we inform them of this or what do we say, will they send anyone out ?
I think even in the best case scenario that is probably unrealistic, especially if the property is not a new build, although one would hope a day or two should be possible.Laurelii said:we need internet connection starting from the day of completion.0 -
Just to double check, have you checked the address on their address lookup, it is not always the case of being the same area, it depends on cabling, cabinet space, engineer availability, if the previous occupants cancel or transfer their broadband in time etc.Laurelii said:
yes they can supply to the new address its the same area as where we are now , we have 3 pre teens and they will be moaning without internetMattMattMattUK said:
Have you checked that they are able to supply the new address as this will not always be the case?Laurelii said:Hi so we have a completion date of feb 18th, our current broadband is with ee and i think we are planning to stick with ee but a better deal, how do we inform them of this or what do we say, will they send anyone out ?
I think even in the best case scenario that is probably unrealistic, especially if the property is not a new build, although one would hope a day or two should be possible.Laurelii said:we need internet connection starting from the day of completion.
On that basis I would plan on a few days of moaning, it is probably unlikely that the you will be able to get the switch on the same day, it relies on too many things going right, it will likely be a day or two.0 -
If the property has a current broadband connection you need to speak to the occupiers to see what their plans are for termination of their service.
If you order without their knowledge they will get a "sorry to hear you are leaving" letter/email and they will tell their current ISP to reject the order and that will further complicate things.0 -
If you can get FTTP, usually there is a 2 week period, but if you take that from today, then that means the 18th is possible if there are open slots for that day.0
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 353.5K Banking & Borrowing
- 254.1K Reduce Debt & Boost Income
- 455K Spending & Discounts
- 246.5K Work, Benefits & Business
- 602.9K Mortgages, Homes & Bills
- 178K Life & Family
- 260.5K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards
