We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
PLEASE READ BEFORE POSTING: Hello Forumites! In order to help keep the Forum a useful, safe and friendly place for our users, discussions around non-MoneySaving matters are not permitted per the Forum rules. While we understand that mentioning house prices may sometimes be relevant to a user's specific MoneySaving situation, we ask that you please avoid veering into broad, general debates about the market, the economy and politics, as these can unfortunately lead to abusive or hateful behaviour. Threads that are found to have derailed into wider discussions may be removed. Users who repeatedly disregard this may have their Forum account banned. Please also avoid posting personally identifiable information, including links to your own online property listing which may reveal your address. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
The Forum now has a brand new text editor, adding a bunch of handy features to use when creating posts. Read more in our how-to guide
New build buy - loss of enjoyment?
owllady
Posts: 29 Forumite
I've previously posted on this forum about our troubles since buying a new build.
Will try to keep this brief but after some advice/opinion
We bought a house after seeing an identical show home at a small site with 60 privately owned homes. We've used the help to buy scheme.
- Originally told the end of Nov but was pushed back till 19th Dec
- Moved in felt very rushed, workmen still here, paint tacky, work unfinished
-Heating system wired in back to front (now sorted)
Toilets have never flushed properly
Lots of minor errors needing putting right i.e garage door needing treating/painting, turf missing, sealant missing on bathroom etc
-Site manager aware but have said to leave keys at site office or leave garage door open is the only way we'll get this done - we feel this isn't right, who's liable if things go wrong/theft etc?
- Downstairs w.c. blocked for a month, site manager aware of this
Said drains were jetted tuesday
-Wednesday after a bath the blocked toilet overflowed and filled the downstairs with raw sewage.
- Initially site manager very aggressive saying drains jetted and they found cooking fat so our own fault. (this was the first I heard of this) .
Firstly if it was cooking fat it shouldn't have blocked the drains so quickly and secondly I don't use cooking fat I'm on slimming world
-It transpires that they jetted wrong drains
-Building company have agreed to do repairs and replace damaged items.
-Neighbour has said week before we moved in the drain was filled with building rubble he knew this because it overflowed and went into his garage. He looked under the drain cover and scooped handfuls out.
- Our downstairs is now just concrete flooring, has been sanitised but it absolutely stinks still.
-I've had to defer a a degree module as a result of this.
I am relieved that the company are replacing our stuff but feel this shouldn't be the end of it, this should be an exciting time and we can't even sit and enjoy a bit of rubbish tv for the smell. Couple this when the terrible after sales I just feel a form of compensation should be made.
Before when I posted alot of replies were that we should get it done ourselves and move on. But why should we, we (or our bank) have just handed over a huge sum of money for this and the company prides themselves on a five star rating after sales service but feels at the moment it's not even 1.
What would you do in this situation?
Will try to keep this brief but after some advice/opinion
We bought a house after seeing an identical show home at a small site with 60 privately owned homes. We've used the help to buy scheme.
- Originally told the end of Nov but was pushed back till 19th Dec
- Moved in felt very rushed, workmen still here, paint tacky, work unfinished
-Heating system wired in back to front (now sorted)
Toilets have never flushed properly
Lots of minor errors needing putting right i.e garage door needing treating/painting, turf missing, sealant missing on bathroom etc
-Site manager aware but have said to leave keys at site office or leave garage door open is the only way we'll get this done - we feel this isn't right, who's liable if things go wrong/theft etc?
- Downstairs w.c. blocked for a month, site manager aware of this
Said drains were jetted tuesday
-Wednesday after a bath the blocked toilet overflowed and filled the downstairs with raw sewage.
- Initially site manager very aggressive saying drains jetted and they found cooking fat so our own fault. (this was the first I heard of this) .
Firstly if it was cooking fat it shouldn't have blocked the drains so quickly and secondly I don't use cooking fat I'm on slimming world
-It transpires that they jetted wrong drains
-Building company have agreed to do repairs and replace damaged items.
-Neighbour has said week before we moved in the drain was filled with building rubble he knew this because it overflowed and went into his garage. He looked under the drain cover and scooped handfuls out.
- Our downstairs is now just concrete flooring, has been sanitised but it absolutely stinks still.
-I've had to defer a a degree module as a result of this.
I am relieved that the company are replacing our stuff but feel this shouldn't be the end of it, this should be an exciting time and we can't even sit and enjoy a bit of rubbish tv for the smell. Couple this when the terrible after sales I just feel a form of compensation should be made.
Before when I posted alot of replies were that we should get it done ourselves and move on. But why should we, we (or our bank) have just handed over a huge sum of money for this and the company prides themselves on a five star rating after sales service but feels at the moment it's not even 1.
What would you do in this situation?
0
Comments
-
Firstly, stop talking to the site manager and sales girl. Write (yes WRITE) to their MD at the head iffice listing your issues and giving him 21 days to rectify everything or you will take legal redress. Or suggest that the local papers maybe interested in your story.
You need to get the problems resolved before you think of any form of compensation.
Its bizarre that the minute something goes wrong, people always think of compensation first and getting the problem sorted second.Eat vegetables and fear no creditors, rather than eat duck and hide.0 -
My asking for advice was not just about compensation. Of course we want this problems rectified first I am just thinking in the long term too. This is supposed to be an exciting time for us, new chapter and all that and now we're just sat on a concrete floor that smells of excrement.0
-
Maybe get a "Snagging Survey" done by an RICS surveyor. (Google 'snagging survey' for more info.)
You will get a complete formal list of problems for passing to the developer. They should take this more seriously than your complaints.
And the surveyor will be on your side (rather than the developer's side), so they will give you friendly advice about how to take things forward etc.
If you're thinking about making a compensation claim at some stage, you will probably need a report from an RICS surveyor anyway.
But expect to pay a few hundred pounds for a snagging survey.0 -
Thank you for replying .
I was under the impression snagging was something we did as we moved in, but with it being December the 19th and so much other stuff going on we didn't get around to it and just thought lessoned learnt.0 -
I've previously posted on this forum about our troubles since buying a new build.
Will try to keep this brief but after some advice/opinion
We bought a house after seeing an identical show home at a small site with 60 privately owned homes. We've used the help to buy scheme.
- Originally told the end of Nov but was pushed back till 19th Dec
- Moved in felt very rushed, workmen still here, paint tacky, work unfinished
-Heating system wired in back to front (now sorted)
Toilets have never flushed properly
Lots of minor errors needing putting right i.e garage door needing treating/painting, turf missing, sealant missing on bathroom etc
-Site manager aware but have said to leave keys at site office or leave garage door open is the only way we'll get this done - we feel this isn't right, who's liable if things go wrong/theft etc?
- Downstairs w.c. blocked for a month, site manager aware of this
Said drains were jetted tuesday
-Wednesday after a bath the blocked toilet overflowed and filled the downstairs with raw sewage.
- Initially site manager very aggressive saying drains jetted and they found cooking fat so our own fault. (this was the first I heard of this) .
Firstly if it was cooking fat it shouldn't have blocked the drains so quickly and secondly I don't use cooking fat I'm on slimming world
-It transpires that they jetted wrong drains
-Building company have agreed to do repairs and replace damaged items.
-Neighbour has said week before we moved in the drain was filled with building rubble he knew this because it overflowed and went into his garage. He looked under the drain cover and scooped handfuls out.
- Our downstairs is now just concrete flooring, has been sanitised but it absolutely stinks still.
-I've had to defer a a degree module as a result of this.
I am relieved that the company are replacing our stuff but feel this shouldn't be the end of it, this should be an exciting time and we can't even sit and enjoy a bit of rubbish tv for the smell. Couple this when the terrible after sales I just feel a form of compensation should be made.
Before when I posted alot of replies were that we should get it done ourselves and move on. But why should we, we (or our bank) have just handed over a huge sum of money for this and the company prides themselves on a five star rating after sales service but feels at the moment it's not even 1.
What would you do in this situation?
This is utterly shocking OP.
The first thing you should do is name and shame the developer here, so people are aware of what they may get buying from them.
A LOT of bad press might get them to pay a bit more attention and stop bull5hitting people into swallowing whatever they tell them0 -
The big developers even barratts md's don't give a poo, you wont get compo only things put rightDon't put your trust into an Experian score - it is not a number any bank will ever use & it is generally a waste of money to purchase it. They are also selling you insurance you dont need.0
-
Can't offer any more advice than you have already had, but I do feel sorry for you. I would not go for a new build for all the sand in the Sahara!You didn't, did you? :rotfl::rotfl:0
-
The big developers even barratts md's don't give a poo, you wont get compo only things put right
Exactly, which is why they should be named openly for all to make their own judgements.
If people don't make it public, then we as buyers just go on and on, gobbling up the cr4p they produce and put up with being fobbed off with B.S excuses.
Let's face it, it's not as though the knowhow and technology isn't there to be implemented is it. It shouldn't be so difficult to get a quality product from these developers, but time and again we hear horror stories of how they sell junk and do nothing about the issues their products throw up.0 -
Thank you for replying .
I was under the impression snagging was something we did as we moved in, but with it being December the 19th and so much other stuff going on we didn't get around to it and just thought lessoned learnt.
Yes - it can be done when you move in, or it can be done later.
I guess the main risk of doing later could be that the developer accuses you of causing the damage after you moved in.0 -
David Wilson homes is the builder which is owned by Barratt. The thing that makes it more of a horrid situation is that before this we were renting a listed cottage with a good awful landlady and letting agency. Maybe I'm cursed with blocked toilets but we had a blocked toilet 6 times in 3 months before they actually sorted the problem. We honestly thought we were were through with problems like this and waiting on people to get things sorted.
The only way we can describe how we are feeling is deflated and let down. Naturally we can't fault the sales side but through to the other side we feel as though we are an inconvenience asking for things to be sorted.
I think this will be our first and only new build property.
Our neighbours on both sides also feel the same. It's a shame as they are lovely houses.
0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 354.5K Banking & Borrowing
- 254.4K Reduce Debt & Boost Income
- 455.5K Spending & Discounts
- 247.4K Work, Benefits & Business
- 604.3K Mortgages, Homes & Bills
- 178.5K Life & Family
- 261.8K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.7K Read-Only Boards