We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
The Forum now has a brand new text editor, adding a bunch of handy features to use when creating posts. Read more in our how-to guide
Air Europa Flight Delay Claim
mjaco
Posts: 1 Newbie
Hi,
has anyone posted a claim with Air Europa?
In March i was returning from Peru, had checked in and boarded the plane and then sat there for 2.5 hours to be told we had to get off due to a technical fault. We then re-boarded an hour or so later and set off approx 3.5 hours late. This resulted in me landing late and missing my connection flight (also with Air Europa and part of one single booking Lima - London). Air Europa then told me the earliest flight they could put me on was at 4pm that day (should have been 7am) resulting in me missing a full days work at great expense and having to take additional leave which I did not have. Total delay was approx 7-8 hours.
I have called (no answer/ no one available to help) sent emails and letters to Air Europa directly and heard nothing (this was in May). I have since sent a claim through the Spanish AESA however this has now been 7 weeks with nothing other then a receipt of my claim.
I am not sure what to do now? I have provided them with all documents required. Is there anyone else I can claim to? Has anyone managed to successfully claim from a Spanish airline?
Many Thanks
has anyone posted a claim with Air Europa?
In March i was returning from Peru, had checked in and boarded the plane and then sat there for 2.5 hours to be told we had to get off due to a technical fault. We then re-boarded an hour or so later and set off approx 3.5 hours late. This resulted in me landing late and missing my connection flight (also with Air Europa and part of one single booking Lima - London). Air Europa then told me the earliest flight they could put me on was at 4pm that day (should have been 7am) resulting in me missing a full days work at great expense and having to take additional leave which I did not have. Total delay was approx 7-8 hours.
I have called (no answer/ no one available to help) sent emails and letters to Air Europa directly and heard nothing (this was in May). I have since sent a claim through the Spanish AESA however this has now been 7 weeks with nothing other then a receipt of my claim.
I am not sure what to do now? I have provided them with all documents required. Is there anyone else I can claim to? Has anyone managed to successfully claim from a Spanish airline?
Many Thanks
0
Comments
-
Read blondmark's comments about using the european small claim's procedure in the ryanair thread.
Thalia22 had a claim with Iberia.Posts are not advice and must not be relied upon.0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 353.9K Banking & Borrowing
- 254.3K Reduce Debt & Boost Income
- 455.2K Spending & Discounts
- 247K Work, Benefits & Business
- 603.6K Mortgages, Homes & Bills
- 178.3K Life & Family
- 261.1K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.7K Read-Only Boards