We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
How long to fit a bathroom?
dragonsoup
Posts: 511 Forumite
How long should this take? Its a very small one maybe 7' by 7' and everything needs moving, including drilling through a thick rubblestone wall to move the soil stack and replastering. It also needs a new shower over the bath and maybe half the room tiling.
I am just wondering how long we will be without a bathroom.
I am just wondering how long we will be without a bathroom.
0
Comments
-
About a week, but you can make sure that the toilet can be used overnight by using a flexible coupling.
Thw whole bathroom will not be completely out of use, just certain bits. Get the bath fitted first then you can have a bath or wash in the bath.0 -
dragonsoup wrote: »How long should this take? Its a very small one maybe 7' by 7' and everything needs moving, including drilling through a thick rubblestone wall to move the soil stack and replastering. It also needs a new shower over the bath and maybe half the room tiling.
I am just wondering how long we will be without a bathroom.
Took 6 months in our house whilst my DH was 'sorting' it out!!! Good luck with it all.
Rebecca x0 -
Ours took about 2 weeks all in. That included new toilet and sink and replacing bath with double shower cubicle and full ceiling height tiling. Ideally, make sure that you don't use your bath or shower for at least 48 hours after the grout and sealant has been put in else you will forever be re-sealing and repairing grouting that didn't cure properly before getting wet.0
-
took us 2 days for a bathroom of similar size to be fitted. the plumber left the toilet and sink loose so the tiler could come along at his leaisure and tile behind and under both. the tiling took a day.DON'T WORRY BE HAPPY

norn iron club member no.10 -
just done one.
the suite took me 2 days to fit, and the wall tiling (full height) another few half days.Get some gorm.0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 352.5K Banking & Borrowing
- 253.7K Reduce Debt & Boost Income
- 454.5K Spending & Discounts
- 245.5K Work, Benefits & Business
- 601.5K Mortgages, Homes & Bills
- 177.6K Life & Family
- 259.5K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards