  • BertieUK
    BertieUK Posts: 1,701 Forumite
    fluffpot I am pleased that you took the time to compose this post, I do appretiate it.

    Let me say that I will NOT be fitting, or even removing, any cables from the shower unit or the double pole isolating switch that was fitted by a previous house-owner.

    Your comments about being concerned about the 'fuse' protection of the shower circuit is what my first question was all about. How was this circuit 'fused' . I for one, would not remove the covers from any box contained within the main fuse-box area to see what was behind it. I just wanted to know that the unit was safe.

    As was suggested before, the fuse-box was full so this looks as though this was why this extra circuit originated. Looking inside the front cover the identification of each of the 6 circuits that it provides are not very clear. The name on the box is as follows.

    Contactum Residual Current Device B6303/2 In 63A 2pot.

    My next move is to contact my local electrical services and get them to check my system fully.

    What I would like to do is to build a stud cubicle to contain the new shower unit. My intentions was to run the required cables to both the shower/fuse and get the sparky to make the connections, which I am not qualified to do. Also for him to disconnect the old shower unit as well.

    Fluff I take your concern 100% to heart and give you thanks for your post.

    regards

    Bob
  • macman
    macman Posts: 53,129 Forumite
    Part of the Furniture 10,000 Posts Name Dropper
    No responsible sparky will do that, because he can't see necessarily see all the cable run (surface, ducted, buried in plaster etc). It is also his responsibility to check that the cable rating is suitable for the load to be carried-how can he do that if you've already run the cable?
    He will not sign off work that he cannot verify 100%.
    The saving involved is anyway miniscule.
    No free lunch, and no free laptop ;)
  • BertieUK
    BertieUK Posts: 1,701 Forumite
    Fair comment macman I take your point and understand. I will just provide the access, lift floorboards etc and leave it up to him.

    regards
    Bob
  • BertieUK
    BertieUK Posts: 1,701 Forumite
    In conclusion...

    Yesterday our local Electrical Services carried out the following work. To relocate shower. Position test & certificate. Materials £20 Labour £75 VAT £19 Totalling £114

    I did a 'make ready' such as I stated previously, lift floorboards, cut hole in cavity wall etc.

    They did a test in accordance with BS 7671 2008 (IEE Wiring Regulations)

    kind regards

    Bob
This discussion has been closed.
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 352.1K Banking & Borrowing
  • 253.6K Reduce Debt & Boost Income
  • 454.3K Spending & Discounts
  • 245.2K Work, Benefits & Business
  • 600.8K Mortgages, Homes & Bills
  • 177.5K Life & Family
  • 259K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16K Discuss & Feedback
  • 37.7K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.