PLEASE READ BEFORE POSTING: Hello Forumites! In order to help keep the Forum a useful, safe and friendly place for our users, discussions around non-MoneySaving matters are not permitted per the Forum rules. While we understand that mentioning house prices may sometimes be relevant to a user's specific MoneySaving situation, we ask that you please avoid veering into broad, general debates about the market, the economy and politics, as these can unfortunately lead to abusive or hateful behaviour. Threads that are found to have derailed into wider discussions may be removed. Users who repeatedly disregard this may have their Forum account banned. Please also avoid posting personally identifiable information, including links to your own online property listing which may reveal your address. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!

Re: Getting vendors to do work/reduce price

13

Comments

  • ess0two
    ess0two Posts: 3,606 Forumite
    Part of the Furniture 1,000 Posts Name Dropper
    NickDurham wrote: »
    Good advice. Maybe it's better just to get it done post-completion and use our savings to do that rather than redecorate straight away.

    How did you find the redecorating by the way? I'm hoping that, whilst ther walls will look pretty rough, at least it is 'safe'/liveable and we can then go slowly room by room.


    The walls will be chased out upto 3" tops to fit new cable then plastered over.
    Official MR B fan club,dont go............................
  • NickDurham
    NickDurham Posts: 102 Forumite
    ess0two wrote: »
    The walls will be chased out upto 3" tops to fit new cable then plastered over.

    Sounds liveable with to me. :o Cheers.
  • LandyAndy
    LandyAndy Posts: 26,377 Forumite
    Part of the Furniture 10,000 Posts
    ess0two wrote: »
    The walls will be chased out upto 3" tops to fit new cable then plastered over.

    In 1980 I had a 1930's house rewired. It was the original wiring. Some of it had melted in the conduit. This meant that the plaster had to be chased out for a long way to remove the wire/conduit.
  • LandyAndy
    LandyAndy Posts: 26,377 Forumite
    Part of the Furniture 10,000 Posts
    NickDurham wrote: »
    I'm always bemused as how being a couple of thousand short in savings to do a bit of work means you can't afford a house when you've got the deposit, and the payments are comfortable.

    Because, on here, not everyone is entirely truthful about their finances and there are plenty of people who do stretch themselves to the last penny with no contingency. Glad to hear you aren't among them.:T
  • cattie
    cattie Posts: 8,841 Forumite
    Part of the Furniture 1,000 Posts Name Dropper
    niklam wrote: »
    As for how long it would take - we recently extended and remodelled our house (3 bed semi) and it took our electrician 2 days to do the actual rewire (whole house) and add in some additional sockets in selected rooms.
    Niki


    This is superfast! My 3 bed house was completely rewired last year & took over a week. This was with all floorboards lifted & properly relaid, walls properly chased & made good, ceilings made good etc. Lights provided front & back of house.

    Other electricians I had in for quotes all estimated at least a week, but up to 10 days.
    The bigger the bargain, the better I feel.

    I should mention that there's only one of me, don't confuse me with others of the same name.
  • niklam
    niklam Posts: 48 Forumite
    LOL Redecorating is a whole different ball game. I think there weas only 1 wall that wasnt mucked around with - so whole house to decorate. So far have done the kids bedrooms and the bathroom. about 80% of the rest of the house was new plaster all through so have miss coated that - just to keep down the dust. Will probably be finished just about when the youngest kid has moved out - and she is only 3 next month - PMSL.

    Hope everything goes well for you!

    Niki
  • NickDurham
    NickDurham Posts: 102 Forumite
    LandyAndy wrote: »
    Because, on here, not everyone is entirely truthful about their finances and there are plenty of people who do stretch themselves to the last penny with no contingency. Glad to hear you aren't among them.:T

    Cheers Andy - sorry if I came across as a bit short back there. I guess it's just that I've always considered myself quite a careful person with respect to money. We've overspent by about 1k on extra surveys, etc to be sure there were no surprises (plus pulling out of 1 house post-survey), otherwise we'd have 3k left. As I say, although the house needs a fair amount of cosmetic stuff, this doesn't require immediate doing, so not having 5k for that isn't a big problem. I've factored in things like a wage rise of 100 quid a month post-tax from September, 150 per month from June 2010, and in 30 months an end to student loan payments, so things should get easier still as time goes on, allowing us to do more of the cosmetic upgrading.

    The main thing apart from the wiring is getting a disabled loo/shower unit shifted and the pipes capped - but we've been quoted 500 quid, which could come out of a month's salary without too much of a problem.
  • NickDurham
    NickDurham Posts: 102 Forumite
    cattie wrote: »
    This is superfast! My 3 bed house was completely rewired last year & took over a week. This was with all floorboards lifted & properly relaid, walls properly chased & made good, ceilings made good etc. Lights provided front & back of house.

    Other electricians I had in for quotes all estimated at least a week, but up to 10 days.

    Talking about quotes, we had one horrendously high quote of 5k... this was laughed at by other electricians... you've got to be careful of people taking you for a ride!
  • niklam
    niklam Posts: 48 Forumite
    cattie wrote: »
    This is superfast! My 3 bed house was completely rewired last year & took over a week. This was with all floorboards lifted & properly relaid, walls properly chased & made good, ceilings made good etc. Lights provided front & back of house.

    Other electricians I had in for quotes all estimated at least a week, but up to 10 days.

    It could be - Have to say - house was half demolished during remodel so that probably allowed the electrician to work faster. Existing wiring didnt need any chasing - just pulling through. I spose it all depends in the age of the house and how old the wiring is. The existing stuff wasnt aincient - just with all the new work - (including moving of consumer unit) it worked out cheaper to do the rewire rather than extending existing wires to new consumer unit.

    Niki
  • LandyAndy
    LandyAndy Posts: 26,377 Forumite
    Part of the Furniture 10,000 Posts
    NickDurham wrote: »
    Cheers Andy - sorry if I came across as a bit short back there.

    :rotfl:No prob. It's hard enough buying a house without someone questioning your carefully thought through plan.:rolleyes:
This discussion has been closed.
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 351.3K Banking & Borrowing
  • 253.2K Reduce Debt & Boost Income
  • 453.8K Spending & Discounts
  • 244.3K Work, Benefits & Business
  • 599.5K Mortgages, Homes & Bills
  • 177.1K Life & Family
  • 257.8K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.2K Discuss & Feedback
  • 37.6K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.