PLEASE READ BEFORE POSTING: Hello Forumites! In order to help keep the Forum a useful, safe and friendly place for our users, discussions around non-MoneySaving matters are not permitted per the Forum rules. While we understand that mentioning house prices may sometimes be relevant to a user's specific MoneySaving situation, we ask that you please avoid veering into broad, general debates about the market, the economy and politics, as these can unfortunately lead to abusive or hateful behaviour. Threads that are found to have derailed into wider discussions may be removed. Users who repeatedly disregard this may have their Forum account banned. Please also avoid posting personally identifiable information, including links to your own online property listing which may reveal your address. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!

* Full structural survey results are in* Advice please

Hi all, here are a summary of a building survey I had carried out a week ago:
(I have a FTB thread, but would like some more opinions/advice please, thanks Doozergirl for all help so far! :j)

This is long, so please just read the summary if you don't have time, but can offer some help!

Here is a summary:

Obtain builders quotations in regards to providing lead counter flashings to flat roof, repairing the firewall in the roof space, external render repairs and making good, providing additional airbricks to the sub floor and repairs to the front boundary wall.

In the absence of proof that building regulations consent was obtained for removing the load bearing wall to the lounge/diner, obtain a report and a recommendations from a chartered building surveyor or structural engineer or chartered building surveyor in respect of the springy bedroom floor.

Obtain a report and recommendations from a specialist damp proofing contractor or chartered building surveyor in respect of the damp to the lounge/diner.

Obtain a report and recommendations from an accredited surveyor/laboratory or licensed asbestos removal contractor in respect of the textured coating to the ceilings.

Obtain a report and quotation from a builder or drainage contractor in respect of the access chamber and cover.

Consider an NICIEC Electricians report of the electrical system
Consider a CORGI Engineers report of the gas/heating system.

Conclusion:

We can only assume the property conformed to the relevant building town planning regulations at the time of construction.

The property under review is generally in fair condition but some matters are apparent where the full extent of which cannot be determined without further investigation. Providing those investigations are undertaken and reveal levels of disrepair that are acceptable to you, and the repairs as recorded are carried out and the property properly maintained in the future it should provide a suitable investment.


Much of the same, except more detailed:
There are two or three small fruit trees planted close enough to the property in the rear garden. These are potentially close enough to cause damage to the walls and we would advise that they are removed or replanted well away from the building.

Flashings:

You should obtain builders quotations for providing lead counter flashings to the flat roof prior to purchase.


Pitched roof/s:
The slopes to the valley and the valley gutter could not be seen from any vantage point.

There is no obvious evidence to indicate any weakness in the timbers making up the main roof structure.

The roof over the two storey rear two storey extension could not be seen from any vantage point therefore we cannot comment on it's condition. This is another reason you should consider having a further inspection with a builder attending.

We noted a timber canopy roof covered with corrugated plastic sheeting over the entrance door. This is poorly made and in poor condition. you should budget for having it removed or replaced.


Gutters:
There were no obvious defects but as the weather was dry at the time of inspection we cannot confirm that the other gutters do not leak


Downpipes:
As it was not raining at the time of our inspection we cannot state that the downpipes are watertight.


External walls:
The render to the single storey rear extension is missing around the rear corner, exposing the blockwork beneath and this will cause damp internally unless repaired promptly

The rendered drip to the left flank is missing/damaged in parts and requires repair

The hole where the bathroom waste passes through the wall is too large and requires making good.
ACTION:
We would advise you obtain a builders quotation for render repairs and making good prior to purchase. However, read in conjunction with our comments below in section 13.


Damp course:
There are two airbricks to the front elevation, but none elsewhere. It is important that timber ground floors are properly ventilated. It is likely that the house originally had airbricks to the rear allowing cross ventilation of the floor and that these have been blocked when the extensions were built. It will be necessary now to provide additional airbricks to the flank otherwise rot and damp may ensure.
ACTION: We would advise you obtain a builders quotation for providing additional airbricks to ventilate the sub floor prior to purchase.

Structural movement:
It appears the load bearing wall has been removed and we would expect an adequate beam to have been provided. It is not possible to examine any beam without laying the floor or ceiling open, but we noted that the rear bedroom floor was unusually springy which may indicate that the beam does not adequately support the floor joists.

ACTION:
Obtain a report in respect of support to the first floor prior to purchase unless the vendor can show that building regulations consent was obtained for removing the load bearing wall.


Rising dampness:
There were significant high readings obtained in the skirtings and walls to the lounge and diner. Without extensive investigations we cannot conclude whether this is rising damp or not, particularly since any damp proof course has been bridged by the external render.

ACTION: We advise you either obtain a report and quotation for remedial works from a specialist damp proofing contractor prior to purchase or that you have a surveyor undertake further investigations and provide a report prior to purchase, the latter will require the consent of the vendor and may involve some destructive testing. There are advantages and disadvantages to each which we would be pleased to discuss with you.

Asbestos:
ACTION:
Obtain a report and recommendations in regards to the textured coatings to the ceiling prior to purchase.

The foul drainage system:
There is an access chamber in the front garden. The chamber has a cast iron cover which has cracked into a number of parts and whose handles are missing. It could not be safely lifted so we cannot report on the drainage. The damaged cover should be replaced and the chamber inspected.


ACTION:
We would advise you have a builder/specialist lift the damaged cover and report on the condition of the chamber, then provide a quotation for replacing the cover and any other necessary work prior to purchase.

Fences, walls and hedges:
The front boundary wall has course missing leaving the top course with its frog (indentation) uppermost. This will encourage frost damage and another course or courses should be laid frog up to reduce this

ACTION:
We would advise you obtain a quote to repair the front boundary wall prior to purchase.

Sorry if there are loads of mistakes, but I'm rushing this before I leave for work!! Any experience/advice/ideas on how much these will cost and if I need to get the solicitor involved, if anything is extremely urgent etc.

There was also something about the firewall missing some bricks, so a fire could easily spread from home to home.


Our conclusion is that the urgent things are: Rendering, and the problem with the load bearing wall being removed, leading to upstairs bedroom floor being springy.

Everything else can wait? What we're going to do is get a builders quote on most things, then ask the vendor to pay for the rendering and springy floor problem. Does this sound reasonable? We will probably do the rest of the work ourselves once we've moved in!
"I did then, what I knew then. And when I knew better, I did better"
«1345

Comments

  • wecanhelpu
    wecanhelpu Posts: 630 Forumite
    What will you do if the vendors refuse to pay?
  • CharleneUK
    CharleneUK Posts: 3,206 Forumite
    Part of the Furniture 1,000 Posts Name Dropper Photogenic
    wecanhelpu wrote: »
    What will you do if the vendors refuse to pay?

    Hello there.

    Depending on the quotes we receive tomorrow, if the vendor isn't willing to pay or reduce the price, we'll most probably pull out. :(
    "I did then, what I knew then. And when I knew better, I did better"
  • Taadaa
    Taadaa Posts: 2,113 Forumite
    Umm, a springy bedroom floor?? We are talking thousands to repair, not to mention the time it will take. If I were you, I would seriously consider pulling out now. There are a few too many issues that need resolving.
    I have had many Light Bulb Moments. The trouble is someone keeps turning the bulb off :o

    1% over payments on cc 3.5/100 (March 2014)
  • Doozergirl
    Doozergirl Posts: 34,082 Forumite
    Part of the Furniture 10,000 Posts Name Dropper Photogenic
    I'd beg to differ! I think it reads pretty average for an older style property that has had the full building survey. The surveyors are very thorough and that report has been written for Charlene to know every issue in the house. If it were a mortgage valuation report it would probably say something like "the condition of the property is consistent with it's age" or some other useless phrase that means nothing. There are probably hundreds of people every day buying houses that are likely to have identical issues thinking the house is perfect.

    The chimney breast is the main issue there, yes.
    Everything that is supposed to be in heaven is already here on earth.
  • Jonbvn
    Jonbvn Posts: 5,562 Forumite
    Part of the Furniture 1,000 Posts
    As a civil engineer the flat roof and the asbestos worry me!

    In my experience flat roofs are always a problem. The lining materials are usually only guaranteed for 10-15 years. The property you are talking about is outside of this guarantee. Repairs necessary to obtain a suitable guarantee - several; £k's

    Asbestos: Depending on the extent could cost serious money.

    IMHO, the springy floor boards just need an additional steel joist, which will solve the problem relatively easily. Quite cheap and easy.
    In case you hadn't already worked it out - the entire global financial system is predicated on the assumption that you're an idiot:cool:
  • nelly_2
    nelly_2 Posts: 17,863 Forumite
    10,000 Posts Combo Breaker
    Sorry cant be arsed reading it all but the missing render wont necassarily cause damp if its a cavity wall it will however if its solid.
  • mr.broderick
    mr.broderick Posts: 3,778 Forumite
    1,000 Posts Combo Breaker
    nelly wrote: »
    Sorry cant be arsed reading it all but the missing render wont necassarily cause damp if its a cavity wall it will however if its solid.

    Absolute top quality..
  • mr.broderick
    mr.broderick Posts: 3,778 Forumite
    1,000 Posts Combo Breaker
    CharleneUK wrote: »
    Hi all, here are a summary of a building survey I had carried out a week ago:
    (I have a FTB thread, but would like some more opinions/advice please, thanks Doozergirl for all help so far! :j)

    This is long, so please just read the summary if you don't have time, but can offer some help!

    Here is a summary:

    Obtain builders quotations in regards to providing lead counter flashings to flat roof, repairing the firewall in the roof space, external render repairs and making good, providing additional airbricks to the sub floor and repairs to the front boundary wall.

    In the absence of proof that building regulations consent was obtained for removing the load bearing wall to the lounge/diner, obtain a report and a recommendations from a chartered building surveyor or structural engineer or chartered building surveyor in respect of the springy bedroom floor.

    Obtain a report and recommendations from a specialist damp proofing contractor or chartered building surveyor in respect of the damp to the lounge/diner.

    Obtain a report and recommendations from an accredited surveyor/laboratory or licensed asbestos removal contractor in respect of the textured coating to the ceilings.

    Obtain a report and quotation from a builder or drainage contractor in respect of the access chamber and cover.

    Consider an NICIEC Electricians report of the electrical system
    Consider a CORGI Engineers report of the gas/heating system.

    Conclusion:

    We can only assume the property conformed to the relevant building town planning regulations at the time of construction.

    The property under review is generally in fair condition but some matters are apparent where the full extent of which cannot be determined without further investigation. Providing those investigations are undertaken and reveal levels of disrepair that are acceptable to you, and the repairs as recorded are carried out and the property properly maintained in the future it should provide a suitable investment.


    Much of the same, except more detailed:
    There are two or three small fruit trees planted close enough to the property in the rear garden. These are potentially close enough to cause damage to the walls and we would advise that they are removed or replanted well away from the building.

    Flashings:

    You should obtain builders quotations for providing lead counter flashings to the flat roof prior to purchase.


    Pitched roof/s:
    The slopes to the valley and the valley gutter could not be seen from any vantage point.

    There is no obvious evidence to indicate any weakness in the timbers making up the main roof structure.

    The roof over the two storey rear two storey extension could not be seen from any vantage point therefore we cannot comment on it's condition. This is another reason you should consider having a further inspection with a builder attending.

    We noted a timber canopy roof covered with corrugated plastic sheeting over the entrance door. This is poorly made and in poor condition. you should budget for having it removed or replaced.


    Gutters:
    There were no obvious defects but as the weather was dry at the time of inspection we cannot confirm that the other gutters do not leak


    Downpipes:
    As it was not raining at the time of our inspection we cannot state that the downpipes are watertight.


    External walls:
    The render to the single storey rear extension is missing around the rear corner, exposing the blockwork beneath and this will cause damp internally unless repaired promptly

    The rendered drip to the left flank is missing/damaged in parts and requires repair

    The hole where the bathroom waste passes through the wall is too large and requires making good.
    ACTION:
    We would advise you obtain a builders quotation for render repairs and making good prior to purchase. However, read in conjunction with our comments below in section 13.


    Damp course:
    There are two airbricks to the front elevation, but none elsewhere. It is important that timber ground floors are properly ventilated. It is likely that the house originally had airbricks to the rear allowing cross ventilation of the floor and that these have been blocked when the extensions were built. It will be necessary now to provide additional airbricks to the flank otherwise rot and damp may ensure.
    ACTION: We would advise you obtain a builders quotation for providing additional airbricks to ventilate the sub floor prior to purchase.

    Structural movement:
    It appears the load bearing wall has been removed and we would expect an adequate beam to have been provided. It is not possible to examine any beam without laying the floor or ceiling open, but we noted that the rear bedroom floor was unusually springy which may indicate that the beam does not adequately support the floor joists.

    ACTION:
    Obtain a report in respect of support to the first floor prior to purchase unless the vendor can show that building regulations consent was obtained for removing the load bearing wall.


    Rising dampness:
    There were significant high readings obtained in the skirtings and walls to the lounge and diner. Without extensive investigations we cannot conclude whether this is rising damp or not, particularly since any damp proof course has been bridged by the external render.

    ACTION: We advise you either obtain a report and quotation for remedial works from a specialist damp proofing contractor prior to purchase or that you have a surveyor undertake further investigations and provide a report prior to purchase, the latter will require the consent of the vendor and may involve some destructive testing. There are advantages and disadvantages to each which we would be pleased to discuss with you.

    Asbestos:
    ACTION:
    Obtain a report and recommendations in regards to the textured coatings to the ceiling prior to purchase.

    The foul drainage system:
    There is an access chamber in the front garden. The chamber has a cast iron cover which has cracked into a number of parts and whose handles are missing. It could not be safely lifted so we cannot report on the drainage. The damaged cover should be replaced and the chamber inspected.


    ACTION:
    We would advise you have a builder/specialist lift the damaged cover and report on the condition of the chamber, then provide a quotation for replacing the cover and any other necessary work prior to purchase.

    Fences, walls and hedges:
    The front boundary wall has course missing leaving the top course with its frog (indentation) uppermost. This will encourage frost damage and another course or courses should be laid frog up to reduce this

    ACTION:
    We would advise you obtain a quote to repair the front boundary wall prior to purchase.

    Sorry if there are loads of mistakes, but I'm rushing this before I leave for work!! Any experience/advice/ideas on how much these will cost and if I need to get the solicitor involved, if anything is extremely urgent etc.

    There was also something about the firewall missing some bricks, so a fire could easily spread from home to home.


    Our conclusion is that the urgent things are: Rendering, and the problem with the load bearing wall being removed, leading to upstairs bedroom floor being springy.

    Everything else can wait? What we're going to do is get a builders quote on most things, then ask the vendor to pay for the rendering and springy floor problem. Does this sound reasonable? We will probably do the rest of the work ourselves once we've moved in!

    Christ if id forked out a small fortune for a structural survey id be very unhappy if the bloke didn't condemn the gaff..move on buy the house and stop posting threads as long as this, my eyes aren't what they were.
  • CharleneUK
    CharleneUK Posts: 3,206 Forumite
    Part of the Furniture 1,000 Posts Name Dropper Photogenic
    LOL, well sorry about that Mr.Broderick! :D

    Thanks for all the replies, although some are conflicting. Am having some builders call back today to arrange quotes, some say they can quote over the phone without actually seeing the property.

    Just need as much info as possible, not only from builders but from people here, who have experience. I appreciate all the posts, thanks!!

    Sorry the thread is so long, but I did say! :D:D
    "I did then, what I knew then. And when I knew better, I did better"
  • nobblyned
    nobblyned Posts: 705 Forumite
    Jonbvn wrote: »
    As a civil engineer the flat roof and the asbestos worry me!

    In my experience flat roofs are always a problem. The lining materials are usually only guaranteed for 10-15 years. The property you are talking about is outside of this guarantee. Repairs necessary to obtain a suitable guarantee - several; £k's

    Asbestos: Depending on the extent could cost serious money.

    IMHO, the springy floor boards just need an additional steel joist, which will solve the problem relatively easily. Quite cheap and easy.

    The surveyor advised to check for the presence of asbestos, not that there was asbestos present. They always say this whenever there is artexing on the ceilings.

    A very small amount of old artexing contains asbestos. A vast majority doesn't.

    Overall looks like a pretty normal full survey for an older property.
This discussion has been closed.
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 352K Banking & Borrowing
  • 253.5K Reduce Debt & Boost Income
  • 454.2K Spending & Discounts
  • 245K Work, Benefits & Business
  • 600.6K Mortgages, Homes & Bills
  • 177.4K Life & Family
  • 258.8K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.2K Discuss & Feedback
  • 37.6K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.