Enusuite refurbish

Options
Hi,
Getting ensuite refurbished.
Have got a quote ofr £3400 for labour and plumbing supplies(grout + tile adhesive + board +timber) (BUT NOT TILES , TOILET BASIN SHOWER ETC. which will be supplied by me).
The work is
1) strip off existing tiles + shower tray + toilet + floor tiles + vanity unit + basin.
2) Rebuild the walls (waterproof board) as necessary.
3) Retile the walls ( 12 sqm)
3) Retile the floor (3 sqm)
4) Install new vanity unit and basin
5) Install new toilet
6) Install new shower controls/shower.
7) New shower tray
8) New shower door.

I will be supplying all the major mateirals including tiles, toilet,basing ,vanity unit, shower,shower door & tray.
The plumber will supply other building materials including grout, tile adhesive, boards, timber , and pipe fittings etc.

It is approx 6 days worth of work.

I have been quoted £3400. Is this ok?

Many Thanks.
This discussion has been closed.
Meet your Ambassadors

Categories

  • All Categories
  • 343.5K Banking & Borrowing
  • 250.2K Reduce Debt & Boost Income
  • 449.9K Spending & Discounts
  • 235.6K Work, Benefits & Business
  • 608.5K Mortgages, Homes & Bills
  • 173.2K Life & Family
  • 248.2K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 15.9K Discuss & Feedback
  • 15.1K Coronavirus Support Boards