We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
The Forum now has a brand new text editor, adding a bunch of handy features to use when creating posts. Read more in our how-to guide
Enusuite refurbish
MarinaTrench
Posts: 16 Forumite
Hi,
Getting ensuite refurbished.
Have got a quote ofr £3400 for labour and plumbing supplies(grout + tile adhesive + board +timber) (BUT NOT TILES , TOILET BASIN SHOWER ETC. which will be supplied by me).
The work is
1) strip off existing tiles + shower tray + toilet + floor tiles + vanity unit + basin.
2) Rebuild the walls (waterproof board) as necessary.
3) Retile the walls ( 12 sqm)
3) Retile the floor (3 sqm)
4) Install new vanity unit and basin
5) Install new toilet
6) Install new shower controls/shower.
7) New shower tray
8) New shower door.
I will be supplying all the major mateirals including tiles, toilet,basing ,vanity unit, shower,shower door & tray.
The plumber will supply other building materials including grout, tile adhesive, boards, timber , and pipe fittings etc.
It is approx 6 days worth of work.
I have been quoted £3400. Is this ok?
Many Thanks.
Getting ensuite refurbished.
Have got a quote ofr £3400 for labour and plumbing supplies(grout + tile adhesive + board +timber) (BUT NOT TILES , TOILET BASIN SHOWER ETC. which will be supplied by me).
The work is
1) strip off existing tiles + shower tray + toilet + floor tiles + vanity unit + basin.
2) Rebuild the walls (waterproof board) as necessary.
3) Retile the walls ( 12 sqm)
3) Retile the floor (3 sqm)
4) Install new vanity unit and basin
5) Install new toilet
6) Install new shower controls/shower.
7) New shower tray
8) New shower door.
I will be supplying all the major mateirals including tiles, toilet,basing ,vanity unit, shower,shower door & tray.
The plumber will supply other building materials including grout, tile adhesive, boards, timber , and pipe fittings etc.
It is approx 6 days worth of work.
I have been quoted £3400. Is this ok?
Many Thanks.
0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 353.5K Banking & Borrowing
- 254.2K Reduce Debt & Boost Income
- 455.1K Spending & Discounts
- 246.6K Work, Benefits & Business
- 603K Mortgages, Homes & Bills
- 178.1K Life & Family
- 260.6K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards