Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
New House - 4 years old - Bathroom Issue
DE_612183
Posts: 4,203
Forumite
Ok, so I bought a house off Redrow about 4 years ago - everything has been ok, up until this week when the bath started leaking and creaking.
I took the bath panel off - had to remove screws etc to get access, and it transpires that the bath sits on 5 legs that in turn are attached to 4x2 which is then screwed into the floor boards.
however one set of legs have been installed and only sit half on the 4x2 - obviously the guy who fitted it measured incorrectly and instead of relocation the 4x2s just screwed have the leg in and left the other half literally hanging in free air.
Given the time lapse but the fact that this could not have been checked and handover ( although whoever signed off the work could have checked ) - what does anyone think my chances are of getting any restitution from Redrow are?
Thanks
I took the bath panel off - had to remove screws etc to get access, and it transpires that the bath sits on 5 legs that in turn are attached to 4x2 which is then screwed into the floor boards.
however one set of legs have been installed and only sit half on the 4x2 - obviously the guy who fitted it measured incorrectly and instead of relocation the 4x2s just screwed have the leg in and left the other half literally hanging in free air.
Given the time lapse but the fact that this could not have been checked and handover ( although whoever signed off the work could have checked ) - what does anyone think my chances are of getting any restitution from Redrow are?
Thanks
0
Comments
-
Somewhere approaching zero? Think you've only got a couple of years for this level of defect. What's causing the leak?0
-
Can you not just unscrew the wood and move it to under the feet yourself?
I second user1977's other question. Where's the leak coming from?0 -
Nil.
Do it yourself.
Screw the offending legs up slightly to take the pressure off. Insert another length of 4 by 2 next to the one in the wrong place so the leg now straddles the 2. If you can find a couple of bits of thin metal plate to straddle the 2 and spread the weight even better. then screw the legs back down.
It will cost peanuts, and take less time and be less stress that trying to get the builder to do it.
You won't have room to get in to screw the new bit of 4 by 2 to the floor boards, so stick it down with something like sticks like sh*t or similar adhesive.0 -
The 2x4 is screwed into the floor, I'd have to remove the bath and reseal - not something I'd want to try myself.Gavin83 said:Can you not just unscrew the wood and move it to under the feet yourself?
I second user1977's other question. Where's the leak coming from?
The leak is coming as the bath has moved down so part of the seal is letting water through - I can put a bit of sealant there to stop that, but my worry is the legs at some point will just break off the 2x4 and the whole bath will just drop.
I'll post a photo shortly.
1 -
It's come to something when you have to dismantle your brand new house to look for defects.2
-
yep - totally agree - that's why I think Redrow should sort it - although I'm not holding my breath.[Deleted User] said:It's come to something when you have to dismantle your brand new house to look for defects.1 -
Get some 2 x 4 and bash in underneath to support the foot, you should need to screw it down but you can do.That might take you half a day at worse, getting Redrow to fix it, even if they admitted they should would take weeks and weeks.2
-
thanks - thats a great idea!Chandler85 said:Get some 2 x 4 and bash in underneath to support the foot, you should need to screw it down but you can do.That might take you half a day at worse, getting Redrow to fix it, even if they admitted they should would take weeks and weeks.0 -
Just slide a piece in next to it then dob some adhesive
ETA sorry didn't see the above reply
2 -
Can you put another bit of 2x4 next to the existing bit, to give the leg further support on the 'bare' side? I appreciate you probably wont be able to screw the leg to it, but it will stop the leg from falling off the existing piece.1
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.3K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264.1K Travel & Transport
- 1.6M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards

