We’d like to remind Forumites to please avoid political debate on the Forum.

This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.

Un-certified electrical work

We had a complete house renovation last year which included rewiring. The work was signed off by building control officers but afterward we discovered that the RCD (Fuseboard) was not changed (I know it is silly but it was a massive job and there were other issues so we missed that the RCD was not changed). We only found out after we had an incident when fuses tripped and we had no power in the sockets.

I contacted the builder who agreed to send his subcontracted electrician to replace the RCD. The electrician was reluctant to do it as he claimed he was not paid for that but I told him he will need to sort that out with the builder as I have already paid him all what I owe.
He came and replaced the RCD with a new one but he was in a rush for another job so he said he will come the following week to do the testing and certify the work. It is 4 months now and he did not come back. I keep chasing him but he either do not respond to my messages or promise vague dates to complete the work.

Am I correct in thinking that he is breaking the law by not testing and certifying his work? Can I report him?
«1

Comments

  • AndyMc.....
    AndyMc..... Posts: 3,248
    1,000 Posts Combo Breaker
    Forumite
    I think you’ll find you’re breaking the law too with your uncertified work so hang fire with the mud slinging.
  • davidmcn
    davidmcn Posts: 23,596
    Part of the Furniture 10,000 Posts Name Dropper
    Forumite
    I think you’ll find you’re breaking the law too with your uncertified work so hang fire with the mud slinging.
    Indeed. Anyway, the OP's contract (as I thought they had already figured out) is with the builder, not the subcontractor - so they should (again) be chasing the builder to finish off what they've been paid for.
  • Ectophile
    Ectophile Posts: 8,686
    Part of the Furniture 1,000 Posts Photogenic Name Dropper
    Forumite
    Do you really mean just the RCD, or the whole board? the RCD is just one of the breakers in a board (or two of them in many modern installs).


    When it was all signed off by building control, did that include the electrics? If so, then there's no further certification required. Electricians being registered to self-certify is just a (legal) way to avoid building control getting involved.
    If it sticks, force it.
    If it breaks, well it wasn't working right anyway.
  • sam1970
    sam1970 Posts: 1,210
    Part of the Furniture 500 Posts Name Dropper Combo Breaker
    Forumite
    He changed the whole fuseboard. Building control were mainly interested in the building work. There is nothing in the certificate about electrical work
  • AndyMc.....
    AndyMc..... Posts: 3,248
    1,000 Posts Combo Breaker
    Forumite
    sam1970 wrote: »
    He changed the whole fuseboard. Building control were mainly interested in the building work. There is nothing in the certificate about electrical work

    Slack of building control so sign it off without seeing the electrical certificate.
  • Slack of building control so sign it off without seeing the electrical certificate.
    Why?
    Building control can sign off work without it having been certified by the electrician provided that they inspect the work themselves and are happy with it.
  • AndyMc.....
    AndyMc..... Posts: 3,248
    1,000 Posts Combo Breaker
    Forumite
    Why?
    Building control can sign off work without it having been certified by the electrician provided that they inspect the work themselves and are happy with it.

    Must have missed the bit where he said they’d tested the electrics.
  • Ectophile wrote: »
    Do you really mean just the RCD, or the whole board? the RCD is just one of the breakers in a board (or two of them in many modern installs).


    When it was all signed off by building control, did that include the electrics? If so, then there's no further certification required. Electricians being registered to self-certify is just a (legal) way to avoid building control getting involved.

    Im guessing he also means consumer unit, the RCD is just for additional protection but is required for all circuits for the 18th edition.

    As it was done last year if after July it could of been done to 17th or 18th edition in which the previous board may of already complied.

    It also depends on supply earthing arrangement.

    The electrician should of left an installation cert tho somewhere as he has to leave it near the consumer unit and should of been tested before energizing, regardless of who was signing off the work.
  • Must have missed the bit where he said they’d tested the electrics.

    Here we go again, changing what you originally posted which was that they couldn't sign off the electrics without having seen the certificate, something that is incorrect.
    They don't need to see a certificate from the original electrician.

    Just because they didn't test the electric installation doesn't mean that they couldn't issue the final building control certificate.
    All it means is that if it happened, they weren't doing their job correctly.
    They may simply have had a quick visual of the installation and from what they saw, decided to approve it.
  • AndyMc.....
    AndyMc..... Posts: 3,248
    1,000 Posts Combo Breaker
    Forumite
    Here we go again, changing what you originally posted which was that they couldn't sign off the electrics without having seen the certificate, something that is incorrect.
    They don't need to see a certificate from the original electrician.

    Just because they didn't test the electric installation doesn't mean that they couldn't issue the final building control certificate.
    All it means is that if it happened, they weren't doing their job correctly.
    They may simply have had a quick visual of the installation and from what they saw, decided to approve it.

    When did you last deal with a council building inspector?

    Last time I did he wanted to see the electrics certificates before final
    sign off.

    Just saying.
This discussion has been closed.
★ ★ ★ Meet your Ambassadors

Categories

  • All Categories
  • 356K Banking & Borrowing
  • 255K Reduce Debt & Boost Income
  • 456.3K Spending & Discounts
  • 248.5K Work, Benefits & Business
  • 606.3K Mortgages, Homes & Bills
  • 179.1K Life & Family
  • 264.1K Travel & Transport
  • 1.6M Hobbies & Leisure
  • 16.2K Discuss & Feedback
  • 37.7K Read-Only Boards
Quick Search

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.