Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
New Kitchen Units coming- need lots of advice
dontlikemondays
Posts: 110 Forumite
OK, I've ordered my new kitchen units online from Kitchen DIY (had to save money) and they are being delivered next week.
I've got to do this on my own, so I will be needing all the help I can get from you guys.
My order of things to do.
Sunday-
Take down old units,
Dismantle cooker, sink, & hob & washer and move outside for time being
Move fridge elsewhere in house
Monday-
Remove old floor tiles and wall tiles, add new socket, re-plaster any holes
Tuesday
Put up wall units and integrated fridge freezer
Wednesday
Install base units, cooker and hob, re-house washer and install worktops and sink
Thursday-
lighting for units, floor & wall tiling
What do you guys think?
Any tips appreciated.
I've never done a big job like this before but I can't afford the £2000 fitting fee so got to do it myself.
I've got to do this on my own, so I will be needing all the help I can get from you guys.
My order of things to do.
Sunday-
Take down old units,
Dismantle cooker, sink, & hob & washer and move outside for time being
Move fridge elsewhere in house
Monday-
Remove old floor tiles and wall tiles, add new socket, re-plaster any holes
Tuesday
Put up wall units and integrated fridge freezer
Wednesday
Install base units, cooker and hob, re-house washer and install worktops and sink
Thursday-
lighting for units, floor & wall tiling
What do you guys think?
Any tips appreciated.
I've never done a big job like this before but I can't afford the £2000 fitting fee so got to do it myself.
0
Comments
-
You'll have a great time!
I split my kitchen into two. Did one side first (cooker/electrics etc), then the other side (sink/plumbing). This way I was able to keep it functioning and allow myself more time to do a good job.... you don't want to be rushed!
have fun!0 -
IMHO you won't make wednesday go to plan - too much to do.
And if you plan to tile and finish a whole kitchen in one day it'll either be as rough as a badgers !!!!, or it'll take you longer.
HTH
RussPerfection takes time: don't expect miracles in a day
0 -
I think you'll struggle with that time frame and would probably double or triple the time you've allowed. But you may be far more efficient at doing these things than I am.
If you are missing any parts from the kitchen supply place it can take a week or two for them to turn up, which may slow things down.
There will always be surprises, things that don't fit, or you'll break something you weren't expecting.0 -
Just had my kitchen redone and recommend the following;
Check everything is in order, even open up all units and doors to check for any damage.
Check you have everything you need to do the job
Ensure you have extra spare for breakages or if it takes a bit more adhesive etc
Everything takes longer than you expect so work some additional time into the job0 -
Have you got help making the units?
An extra couple of pairs of hands will mean you might be able to stick with that timeframe!0 -
Thanks Guys,
Not too worried about the time frame.
I would like to get it finished ASAP with no kitchen and all that.
I'm more concerned if I have the right order of things to do?0 -
Looks okay, so long as you are tiling up to the units, rather than the whole floor. May be worth "dry fitting" the units before you get all the services in place so you know where everything needs to go. Also if you have something like a dishwasher going in, beware there is pretty much no service gap behind them.0
-
dontlikemondays wrote: »Thanks Guys,
Not too worried about the time frame.
I would like to get it finished ASAP with no kitchen and all that.
I'm more concerned if I have the right order of things to do?
don't rush it or it will spoil it?0 -
Contrary to normal procedure, I put my base units in first!.
My floors are pretty uneven, so levelling took some time. When I had the levelling correct, I could then figure out the right height to hand my units.
Do not underestimate the time taken to level, scribe and re level your units.
Luckily our gas fitter allowed us use of his laser level, which was invaluable. Might be worth a hire from a local hire shop.
What are your wall units being hung on? Mine was a stub wall, so I used a hanging rail from and affixed it at each stud for a stronger finish.
http://www.diy-kitchens.com/cabinet-hangers-and-wall-fixings/id104/
It was my first fit, I budgeted 1 week, it took me 3 (around a full time job)
However, really really satisfying. Do not underestimeate the power of google, youtube, this forum, screwfix forum and other forums.
As long as you are relatively handy, it should all go well!
I only got someone in for electric work, connect gas oven and to do 2 mitre joints on my oak worktops!
Good luck0
This discussion has been closed.
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.3K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264.1K Travel & Transport
- 1.6M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards