Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
Part L building regulations?
shopaholicjules
Posts: 332 Forumite
Hi
Can anybody advise me on these. I have been reading bits on the web but am confused, doesn't take much.
I have bought a house, it is not a new build that had central heating fitted in 2006.
My builder who is doing some work has said that my pipes under the floor are not lagged.
He said about regulations where he thinks that in the new regs under energy efficiency they should of been but is not certain.
Can someone answer this for me as if it is true I will be in touch with the company who did it.
It was done through one of those staywarm companies whop obviously did it the cheapest way and not very well, positions of radiators, not taking out old boiler, leaving lead piping in and just laying new copper to some of it.
Thanks
Jules
Can anybody advise me on these. I have been reading bits on the web but am confused, doesn't take much.
I have bought a house, it is not a new build that had central heating fitted in 2006.
My builder who is doing some work has said that my pipes under the floor are not lagged.
He said about regulations where he thinks that in the new regs under energy efficiency they should of been but is not certain.
Can someone answer this for me as if it is true I will be in touch with the company who did it.
It was done through one of those staywarm companies whop obviously did it the cheapest way and not very well, positions of radiators, not taking out old boiler, leaving lead piping in and just laying new copper to some of it.
Thanks
Jules
0
Comments
-
Good evening: Take at look at Section 2 in the Domestic Heating Compliance Guide... http://www.planningportal.gov.uk/uploads/br/BR_PDF_PTL_DOMHEAT.pdf My OH, Corgi Guy, says the lead pipe should have been removed as part of Best practice. We are noticing many instances where consumers are accepting the cheapest quotes and as a result end up with a CH system that does not meet Building Regs or Best Practice ie. not notified to Building control, Benchmark log (service/installation record) is incomplete, system has not been flushed (could void manufacturer's warranty), heating controls are non-existent (eg. TRVs, room thermostat/programmer) etc....but of course this is good for business as the OH gets the calls when these bodge-job installations fail!
HTH
CanuckleheadAsk to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)0 -
Thanks very much for that.
From what I have read, it seems the fitter should of insulated the pipes. Who would I get in touch with to clarify exactly what it means, building regs person?.
It was an old lady who had the house before me and it seems they have just shoved the system in, radiators not in the best places, on either sides of walls so less pipework for them, old boiler left in, lead piping attached to copper etc.
Once I am confident in what to say I will ring the company who installed it and quote the regulations.
Thanks again for the advice
Jules0 -
Good morning: Firstly...do you have a Building Regs compliance certificate...the previous owner should have been issued with one and passed it on to you. If you don't have one ,contact CORGI ( www.trustcorgi.com) to find out if one has been issued...if one hasn't , give CORGI the name of the heating company and they will investigate. Call the heating company, ask why the pipes weren't lagged as required and request remediation. I wonder who inspects these type of installations for Warmfront etc as this isn't the first time an MSEr has posted about poor standards ?:think: My OH, Corgi Guy, is constantly undercut on price by 'installers' who don't comply with Building Regs or follow best practice, cannot demonstrate technical competence, recommend CH systems not appropriate for the property or the consumer's needs and ,occasionally, don't hold CORGI registration:mad: Caveat emptor!
HTH
CanuckleheadAsk to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)0 -
I work in the building energy management systems industry and as you can imagine part l is very relevent to our work. However, Part L regs are so "woolly", they are full of recomendations and not stern rules. They only apply to new builds and reasonably sized retrofits. The biggest problem at the moment is that there are nowhere near enough people to enforce the 'rules'.
You will find most contractors do not fully understand the regs and what they should be doing, so they are carrying on as they always have.0
This discussion has been closed.
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.3K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264.1K Travel & Transport
- 1.6M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards