Urgent advise needed re home buyers survey

Ronoli14
Ronoli14 Posts: 36
Part of the Furniture Combo Breaker
Forumite
edited 6 January 2013 at 7:48PM in House buying, renting & selling
I am in a state of state of despair so apologies if this is slightly confusing. We are selling our house and buying a new one. Sale on our house is due to exchange within the next week or so with completion due ate the end of the month. We have applied and have a mortgage offer for the house we are buying. We initially asked for a home buyers report, however due to some error either with our broker or the building society, only a basic valuation was done. We then paid for a homebuyers report separately due to the age of the house. Searches have also commenced on the property.

The homebuyers report has been emailed to us today and it is disastrous. areas have been marked as 3, meaning urgent rpair is needed


1. SIDE EXTENSION ROOF

The side extension roof is flat and judged to be covered with felt.
The flat roof covering and roof flashings were not visible due to the height and configuration of the roof so no detailed comments can be made, however, some water staining was noted to the ceiling beneath part of the flat roof covering (see section F2 Ceilings) in the
third bedroom. As such it would be prudent to arrange for an inspection of this
flat roof covering by a roofing contractor, before
exchange of contracts, to ensure no current leakage is taking place
and to confirm the condition of the flat roof covering.

It should be noted that flat and felt covered roofs have a limited
lifespan of some 10 15 years and are particularly prone

The rear extension roof is also flat and covered with felt. The roof flashings comprise of felt.The flat roof covering is dated and largely weathered and covered with moss. The rear edging to the roof has also ripped and degraded away. As such the roof covering is at the end of its useful life and estimates should be obtained for its replacement, before exchange of contracts, by a roofing contractor.

2.The windows comprise of plastic fittings and are double glazed with the exception of the ground floor cloakroom/WC window which
is timber and single glazed.

The window fittings are of varying age with the majority being somewhat dated and although in generally fair order, allowing for age, some fittings do require adjustment to their operation in areas.

The first floor shower room/WC double glazed window unit has blown and misted over. Repair/replacement glazing will be required and
estimates for this should be obtained before exchange of contracts.

3. Ceiling
The kitchen and first floor bathroom/WC ceilings have been clad with
polystyrene tiles. These can give off noxious fumes in the event of
fire and ideally should be removed and the ceilings made good. This
is considered particularly beneficial in high risk fire areas such as the
kitchen and although not considered to be serious or urgent it
should be carried out soon after taking ownership

The rear reception room ceiling has been finished with a textured style coating and it should be noted that more dated textured coatings can possibly contain some asbestos based material,
although this cannot be positively established from a visual
inspection only. However, even if some asbestos based material is
present this should not necessarily be a cause for concern although
it should not be damaged, drilled or worked upon without taking
suitable precautions and if removed a licensed contractor will need
to be employed.

Some water staining was noted to the third bedroom ceiling beneath
the flat roof area to the side extension. Although no high damp
meter readings were noted to the ceiling at the time of the inspection it would,
nevertheless, be prudent to instruct a roofing
contractor to inspect the flat roof to check for leakage before
exchange of contracts. We would refer you to our earlier comments
in section E2 Roof Coverings.

4.Woodwork 3
The internal joinery, for example the doors, skirtings and stairs comprise of timber.
The internal joinery is in fair order allowing for age and the refixing of any creaking stair treads, and upgrade of decorations, is
considered to be part of normal ongoing routine maintenance for a
property of this age. There is also no kitchen door and one should
be refitted. The property must be maintained in a normal way.

The internal patio doors leading from the lounge to the rear reception room are in fair order although requiring some adjustment, however, the doors have large glazed panels and no visible safety glass kite mark was seen. As such the doors could present a health
and safety risk, especially to young children, and you should instruct a glazier to inspect the glass, before exchange of contracts, to
confirm its safety or remove/make the glazing safe. This is considered an urgent matter.


5.Electricity 3
The meter is located under the stairs.
Electrical installations should be inspected at least every 10 years or when a property changes hands. As there is no sign of a recent test, and having regard to the age of the installation and some fittings, upgrades are to be expected. The electrical installation should be
inspected by a NICEIC registered electrician, before exchange of contracts, and estimates for all required works also obtained.

6.
Heating 3

The property is centrally heated by a gas fired boiler located in a cupboard in the first floor shower room/WC with heating to the rooms provided by hot water radiators, including some skirting radiators. The roof space boiler feed tank comprises of plastic fittings and some additional heating is provided by a gas fire in the lounge.
The gas central heating system and gas fire were not running at the time of the
inspection so no detailed comments on performance or serviceability can be made although it was noted that some central heating fittings are dated and some upgrades are to be expected.
We are not aware of any service agreement relating to the gas central heating system and gas fire and the legal adviser should check whether they have been serviced in the past twelve months. In the absence of a service in the past twelve months the gas central heating system and gas fire should be inspected, before exchange of contracts, by a Gas Safe registered engineer. It should also be ensured that the position of the boiler flue conforms to current Gas Regulations and that fumes cannot enter the building via the adjoining window area.
Some of the lining to the boiler cupboard may comprise of asbestos material. It
should be noted that this should not necessarily be a cause for concern although it should not be damaged, drilled or disturbed without taking suitable precautions and if removed a licensed contractor will need to be employed.

7.Garage 3


The property has an integral garage/car port which is open to the rear elevation.
The garage/car port is in acceptable order for its purpose although some making good and decoration is required to areas of external joinery.Some dampness was
noted to the left hand side wall and water staining and damage to the ceiling and as such some repairs are required. An inspection by a damp treatment contractor who is a member of the Property Care Association (PCA) should be carried out before exchange of contracts and all necessary remedial works implemented.

8.Other 3

Boundary fences require some general maintenance and attention. There are some trees and shrubs close to the property. Trees and shrubs can cause damage to buildings and services and whilst none was seen this could occur in the future. All trees and shrubs should be regularly cut back to prevent them from increasing in size. The property must be maintained in a normal way.
The front parking area is in generally acceptable order although it does slope towards the property. As such this could lead to rainwater running into the garage area and although a soakaway has been incorporated in front of the garage this might not be sufficient during heavy rainfall. Improvements or additional drainage may be required and at present the existing soakaway appears to discharge, by way of a rainwater pipe in the garage, through to the rear elevation and onto the
rear area. This is not ideal and should be improved.
The rear paved area may be liable to ponding and loose slabs should be refixed. The loose edging slabs could present a hazard and should be refixed and a proper barrier should also be fitted to the side of the rear steps to prevent a falling hazard. As these items are considered a health and safety risk they should be treated as urgent and estimates obtained before exchange of contracts.
The side wall to the steps also requires some attention.

Please advise
Where do we go from here. Do these sound costly. What would happen to our mortgage offer if we were to look for some
somewhere else.
«1

Comments

  • G_M
    G_M Posts: 51,977
    Part of the Furniture 10,000 Posts Name Dropper Combo Breaker
    Forumite
    edited 6 January 2013 at 8:29PM
    Can't see anything very serious here at all....!

    FLAT ROOFES
    yes, they have shorter lives than standard roofs. So?
    Couldn't be inspected so he doesn't know!

    ELECTRICS, HEATING ETC
    He couldnt inspect so can't comment. You worried? Have them inspected, but he hasn't given any indication of a problem

    CEILINGS
    OK - covered with old-fashioned materials (poly tiles etc). You want a modern house, buy one! Damp? He says no high damp readings. The stains could be 20 years old!

    WOOD
    You want a kitchen door? Buy one! But presmably you noticed yourself there wasn't one!
    Same with the glass - 1000s of houses have original glass!
    Creaking stair treads... :rotfl:

    DAMP GARAGE?
    Oh your poor car! Diddums!

    OTHER
    So - you'll need to maintain the garden. Surprise!
  • Southend1
    Southend1 Posts: 3,362
    Ninth Anniversary 1,000 Posts Combo Breaker
    Forumite
    Re: polystyrene tiles:

    http://youtu.be/xT7chxB45Ms

    Just posting because this is one of my favourite public info films really, but just to add that although I am certainly no expert I can't see anything too major based on the info you posted. Would recommend asking a builder to quote for remedial works and go from there.
  • Ronoli14
    Ronoli14 Posts: 36
    Part of the Furniture Combo Breaker
    Forumite
    Thanks for the reply. Why would the points be highlighted as a 3 ( needing repair or investigation)What I was particularly concerned about was the roof covering of the back extension and the abestos.
    Anyone else have any thoughts or advise.
  • Southend1
    Southend1 Posts: 3,362
    Ninth Anniversary 1,000 Posts Combo Breaker
    Forumite
    Ronoli14 wrote: »
    Thanks for the reply. Why would the points be highlighted as a 3 ( needing repair or investigation)What I was particularly concerned about was the roof covering of the back extension and the abestos.
    Anyone else have any thoughts or advise.

    Possible asbestos in the artex? It's only a problem if you plan to remove/disturb it.

    Roof covering needs more investigation. Certainly sounds like you need to budget to replace it, but it's not the end of the world- ask a builder/roofer for a quote. If it leaks then it obviously needs doing now but if not then it might last a few months until the weather is better and you have saved enough to pay for replacement.
  • Surveyors cover their butts, so include lots of 'need for further investigation' and might-bes to do so. If you are concerned about the roof and possibility of asbestos, get relevant tradesmen in to give you quotes on the work, and do this before exchanging to give you piece of mind.

    I would definitely get the poly tiles sorted out as soon as you get in, and in an ideal world, the tiles and textured ceilings sorted out before you move furniture in - such a messy job!
  • ess0two
    ess0two Posts: 3,606
    Part of the Furniture 1,000 Posts Name Dropper
    Forumite
    Needs a new flat roof.
    Official MR B fan club,dont go............................
  • Ronoli14
    Ronoli14 Posts: 36
    Part of the Furniture Combo Breaker
    Forumite
    Thanks everyone. You have put my mind to rest
    Sound like the general consensus is that the report findings is not as bad as it initially sounded. When they say that flat roofs have a life span of 15 years, is that the roof or just the covering and is it expensive to change the covering. Are we looking at a hundreds or thousands of pounds.
  • daveyjp
    daveyjp Posts: 14,640
    Part of the Furniture 10,000 Posts Name Dropper
    Forumite
    None of that report contains anything I wouldn't have noticed during a viewing. It highlights nothing major, but flags up the fact that the property is of an age and has a number of maintenance issues.

    Just ensure the price reflects the condition and be prepared for plenty of DIY.
  • ess0two
    ess0two Posts: 3,606
    Part of the Furniture 1,000 Posts Name Dropper
    Forumite
    Deffo needs replacing re : staining on ceiling,dependant on size ??? probably 1 - 3k.
    Official MR B fan club,dont go............................
  • daveyjp
    daveyjp Posts: 14,640
    Part of the Furniture 10,000 Posts Name Dropper
    Forumite
    Even better to get rid and replace with a slated/tiled lean to roof. Costs more, but any future maintenance headaches are gone.
This discussion has been closed.
★ ★ ★ Meet your Ambassadors

Categories

  • All Categories
  • 356K Banking & Borrowing
  • 255K Reduce Debt & Boost Income
  • 456.3K Spending & Discounts
  • 248.5K Work, Benefits & Business
  • 606.3K Mortgages, Homes & Bills
  • 179.1K Life & Family
  • 264.1K Travel & Transport
  • 1.6M Hobbies & Leisure
  • 16.2K Discuss & Feedback
  • 37.7K Read-Only Boards
Quick Search

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.