Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
PP/Building regs for rear extension
sten_super
Posts: 21
Forumite
Hi all,
We are in the final stages of sorting out a contract for signing/exchange, and there are two issues around a rear extension (brick, ground floor but with pitched roof, built 2010).
1) No evidence that planning permission not required
- in terms of floorspace the extension should fall under Permitted Development, but given the pitched roof our solicitor is concerned that there's a possibility PP would have been required (and was seemingly never sought)
2) No buildings regulation completion certificate
- local authority search and vendor paperwork suggest that the required inspections took place during construction, but there was no final signoff
The other side (solicitor and estate agent) have started talking about indemnity insurance. We are against this, as we would not be able to invite the council to inspect (as would void the insurance) and we would, as far as we can see, be left with the exact same issue when we come to sell the house.
We were looking to move in approximately 10 days, but that's now looking unlikely. While we have to move out of our rental property in 13 days, we can stay (and store our stuff) with a friend if we have not yet completed, at fairly minimal cost to ourselves, so not too worried about pushing beyond this date. Vendors, on the other hand, have a bridging loan, so must be losing money hand over fist!
Anyway, to cut to the chase, my questions are;
- have we missed any further cons (or pros!) to indemnity insurance which may make it a less/more attractive option?
- does anyone know whether the pitched roof on the extension does/doesn't mean planning permission is required?
- can anyone suggest how long it might take the vendors to get council in to ascertain requirements for PP and/or building regs completion?
This is the house (if it lets me post the link...) and the extension can be seen internally on the first photo (and externally on picture 7).
http://www.rightmove.co.uk/property-for-sale/property-34581523.html
Thanks in advance for your advice!
We are in the final stages of sorting out a contract for signing/exchange, and there are two issues around a rear extension (brick, ground floor but with pitched roof, built 2010).
1) No evidence that planning permission not required
- in terms of floorspace the extension should fall under Permitted Development, but given the pitched roof our solicitor is concerned that there's a possibility PP would have been required (and was seemingly never sought)
2) No buildings regulation completion certificate
- local authority search and vendor paperwork suggest that the required inspections took place during construction, but there was no final signoff
The other side (solicitor and estate agent) have started talking about indemnity insurance. We are against this, as we would not be able to invite the council to inspect (as would void the insurance) and we would, as far as we can see, be left with the exact same issue when we come to sell the house.
We were looking to move in approximately 10 days, but that's now looking unlikely. While we have to move out of our rental property in 13 days, we can stay (and store our stuff) with a friend if we have not yet completed, at fairly minimal cost to ourselves, so not too worried about pushing beyond this date. Vendors, on the other hand, have a bridging loan, so must be losing money hand over fist!
Anyway, to cut to the chase, my questions are;
- have we missed any further cons (or pros!) to indemnity insurance which may make it a less/more attractive option?
- does anyone know whether the pitched roof on the extension does/doesn't mean planning permission is required?
- can anyone suggest how long it might take the vendors to get council in to ascertain requirements for PP and/or building regs completion?
This is the house (if it lets me post the link...) and the extension can be seen internally on the first photo (and externally on picture 7).
http://www.rightmove.co.uk/property-for-sale/property-34581523.html
Thanks in advance for your advice!
0
Comments
-
http://www.planningportal.gov.uk/permission/commonprojects/extensions/
as long as the total height is less than 4 meters and eves height is no more than 3 meters, it will be fine with a piched roof under permitted development.
the lack of a sign off would bother me though, Why didnt they get one? what are they hiding?
if you come to do more mork later on and you need building regs, it may be an issue for them when they check other work you've had done, and could end up costing you a fortune.0 -
Thanks Martin. Doesn't look like the planning permission is an issue then.
The estate agent is suggesting that the vendors weren't aware they were missing anything, and their solicitor said that they've gone back to the builder to query why there's no certificate. Given that the intermediate checks were apparently OK, and our structural survey was happy with the quality of the extension, I want to believe that this is true, and that the builder didn't get it done to save a bit of money. That would also, of course, mean that the problem is straightforward to rectify by getting someone from the council in to inspect it now. Fingers crossed!0 -
The extension would need to be no more than 4m deep too - and judging from the pic, it looks pretty close!0
-
We are in a short chain. Every single one of us has issues with this or that improvement made to our homes which now requires indemnity to nutralise them. The insurance companies who provide such insurance must be making an absolute packet.0
-
I would definitely not buy that thing without knowing that it passed building regs. It looks like its been extended front and rear pretty cheaply. A builders job rather than an architect/engineer.
Rafters to roofs with no ceiling-level tie have a habbit of pushing the walls out. This can be avoided if a ridge beam is used but from the external photo I can't see what would support the end of that beam...............unless there is a steel frame around that end gable window.......................
Too many unknowns and its the vendors job to sort it rather than yours.0 -
I wondered how it was supported too. This is an old thread though ... it may be the OP is living there now?0
This discussion has been closed.
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.3K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264.1K Travel & Transport
- 1.6M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards