Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
House extensions process and estimate costs
advice_please_2
Posts: 461 Forumite
I've been looking at particular house area and see quite a lot in the area have had extensions or planning permissions.
What's the general process, time scale etc.
Example house 1930' 1950's 3 bed house. Some have garage on the side some don't, so was wandering cost to build say a garage to the side, rear room behind garage and extension to the rear for say extended kitchen diner; then an ensuite bedroom above the ground floor extension?
What's the general process, time scale etc.
Example house 1930' 1950's 3 bed house. Some have garage on the side some don't, so was wandering cost to build say a garage to the side, rear room behind garage and extension to the rear for say extended kitchen diner; then an ensuite bedroom above the ground floor extension?
0
Comments
-
with the new building regsadvice_please wrote: »I've been looking at particular house area and see quite a lot in the area have had extensions or planning permissions.
What's the general process, time scale etc.
Example house 1930' 1950's 3 bed house. Some have garage on the side some don't, so was wandering cost to build say a garage to the side, rear room behind garage and extension to the rear for say extended kitchen diner; then an ensuite bedroom above the ground floor extension?
it might be cheaper to buy a old bigger house and convert the inside to your style and you could even add value to the house“Life isn't about finding yourself. Life is about creating yourself.”
― George Bernard Shaw0 -
You'll need Planning Permission unless it falls within 'Permitted Development'. Look at your council's website - it will have details on this.
You'll also need to conform to Building Regs and get a certificate on completion.
For costs, try 'is this quote fair'?
Or 'building costs.'
Or 'What price'?0 -
A lot of people use £1000 per square metre of floor area as a rule of thumb. That's likely if anything to be slightly higher depending on your level of finish and a difficult site.0
-
Thanks
Does £1000 per square metre as a general rule is that for finished rooms downstairs, upstairs with roof etc?0 -
advice_please wrote: »Thanks
Does £1000 per square metre as a general rule is that for finished rooms downstairs, upstairs with roof etc?
That would be a typical finished new build cost, and for floor area you're talking the area of all floors, not just the downstairs.
It's a very rough and ready rule but a starting point nevertheless.0
This discussion has been closed.
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.3K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264.1K Travel & Transport
- 1.6M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards