Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Bathroom and Heating Quote
Doyler_2
Posts: 1 Newbie
Hi
I just wanted to get an opinion on whether the following estimate is fair:
Bathroom (size is approx 6ft x 6ft)
· Shut down hot and cold water services feeding the existing bathroom
· Strip out the following obsolete bathroom equipment:
o Bath
o Basin
o Toilet
o All pipe work and cupboards not required for new installation
o Clear from site
· Supply and install following bathroom equipment:
o New bath complete with new mixer taps and pop up waste
o Connect existing hot and cold water supplies to new bath and connect new bath waste to existing services
o New pedestal basin, complete with new mixer taps and pop waste
o Install new low level toilet pan complete with back to wall cistern and push button flush
o Supply and install new bath panel
o Supply and install new window panel to take new bathroom mirror as agreed with customer
o Supply and install air extraction fan at high level in bathroom
Tiling
· Tile bathroom walls with tiles supplied by customer to the height agreed
· Walls above tiles to be painted
· Upon completion of tiling the exposed woodwork is to be painted white
· Estimated area is 16m²
Bathroom Floor
· Tile bathroom floor with tiles supplied by customer
· Estimated area is 2.25m²
Supply and Install new combination boiler / central heating
· Drain existing central heating and hot water system and remove the following heating an hot water services and equipment:
o Existing boiler with old pipe work appertaining to new installation
o Hot water storage vessel from airing cupboard and remove from site
o Existing bathroom radiator and install new chrome plated towel rail
Boiler
· Supply and install one new SABRE HE combination boiler complete with turbo fan assisted flue to discharge through outside wall in existing boiler position
· Install condense line and terminate outside drain
Gas Supply
· Gas supply will be tested and checked from the meter before installation
· Gas supply will picked up from nearest suitable point
· Upon completion the gas supply will be purged and tested as required by law
Cost
· Labour and Materials = £6277.00
I live in Morden, Surrey and the work is expected to take 2 weeks. I appreciate any feedback.
Thanks
Doyler
I just wanted to get an opinion on whether the following estimate is fair:
Bathroom (size is approx 6ft x 6ft)
· Shut down hot and cold water services feeding the existing bathroom
· Strip out the following obsolete bathroom equipment:
o Bath
o Basin
o Toilet
o All pipe work and cupboards not required for new installation
o Clear from site
· Supply and install following bathroom equipment:
o New bath complete with new mixer taps and pop up waste
o Connect existing hot and cold water supplies to new bath and connect new bath waste to existing services
o New pedestal basin, complete with new mixer taps and pop waste
o Install new low level toilet pan complete with back to wall cistern and push button flush
o Supply and install new bath panel
o Supply and install new window panel to take new bathroom mirror as agreed with customer
o Supply and install air extraction fan at high level in bathroom
Tiling
· Tile bathroom walls with tiles supplied by customer to the height agreed
· Walls above tiles to be painted
· Upon completion of tiling the exposed woodwork is to be painted white
· Estimated area is 16m²
Bathroom Floor
· Tile bathroom floor with tiles supplied by customer
· Estimated area is 2.25m²
Supply and Install new combination boiler / central heating
· Drain existing central heating and hot water system and remove the following heating an hot water services and equipment:
o Existing boiler with old pipe work appertaining to new installation
o Hot water storage vessel from airing cupboard and remove from site
o Existing bathroom radiator and install new chrome plated towel rail
Boiler
· Supply and install one new SABRE HE combination boiler complete with turbo fan assisted flue to discharge through outside wall in existing boiler position
· Install condense line and terminate outside drain
Gas Supply
· Gas supply will be tested and checked from the meter before installation
· Gas supply will picked up from nearest suitable point
· Upon completion the gas supply will be purged and tested as required by law
Cost
· Labour and Materials = £6277.00
I live in Morden, Surrey and the work is expected to take 2 weeks. I appreciate any feedback.
Thanks
Doyler
0
Comments
-
Good morning: Just a comment on a few points...
1. Do you know what sanitaryware/brassware is in spec. eg. brand?
2. The boiler in your spec. is not a product my OH would install(plumber/CORGI in Surrey/South London for 30+ years)
3. CH system should be flushed to remove sludge and other contaminants, CH inhibitor should be added after, scale inhibitor and Boiler Buddy/Magnaclean, installed as well as progammable roomstat and TRVs on all rads except one in the room where the stat is located.
4. Boiler installation should be notified to Building control via your CORGI
For that price I would expect a better boiler and quality bathroom fittings. Always have at least 3 quotes from plumbers/CORGIs recommended to you by a source you trust and compare like for like. You could save money by sourcing and supplying your own bathroom fittings, removing waste materials and stripping off the old tiiles if you are so inclined.
HTH
CanuckleheadAsk to see CIPHE (Chartered Institute of Plumbing & Heating Engineering)0 -
Here's a big long list of Central Heating quotes, hopefully it will help you put your prices in context?0
-
as above, depends on quality of bathroom fittings. boiler imho could be better. also condense waste should not go to drain as against regs.
cost does seem on the "generous side though.0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 355.9K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.2K Spending & Discounts
- 248.4K Work, Benefits & Business
- 606.1K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards