We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
Laying Engineered wood floor, rooms have different floor heights.
I am looking to lay engineered flooring in my hallway. My plan is to also have it in my front room and living room which run off the hallway. The only issue is the living room floor sits 7mm higher than the hallway floor.
I would really love to not have threshold bars if possible so I wondered if I could use a 7mm fibreboard underlay in the hallway and front room and a 1mm underlay in the living room by room to bridge the height gap?
please let me know if this is a terrible idea 😅
Also since I am asking anyway, and the knowledge is so good round here…
My floor is concrete and has the old asbestos tiles which are all in good condition. On top of those there are peel and stick vinyl tiles. Everything is solid and level.
Can I just lay my new floor straight over the top? And do I need a DPM?
Thanks 😊
Comments
-
Not sure on the initial question. But yes you can lay the new floor on top and yes a DPM should be used as you have concrete flooring.
1 -
Thanks! That is good to know.
Hopefully someone else might be able to advise on whether the underlay change is a terrible idea… maybe a threshold strip is just a better idea to avoid issues 😬0 -
Unless it is perfectly, perfectly level eventually you will notice. My kitchen floor looked level, though part was concrete, part boarded. After 3 years we can see a faint line where the join is. I wish now that we’d had the whole lot screeded first.
I'm a Forum Ambassador on the housing, mortgages & student money saving boards. I volunteer to help get your forum questions answered and keep the forum running smoothly. Forum Ambassadors are not moderators and don't read every post. If you spot an illegal or inappropriate post then please report it to forumteam@moneysavingexpert.com (it's not part of my role to deal with this). Any views are mine and not the official line of MoneySavingExpert.com.2 -
use a solid wood threshold - much simple and cheaper and looks nice
2006 LBM £28,000+ in debt.
2021 mortgage and debt free, working part time and living the dream1 -
Be aware if you raise the floor level of your hallway your front door may not open. When I put 24mm engineered wood + 3mm foil-backed underlay I had to remove the original type 10 front door from 1951 and modify it using a circular saw (I was aware I would need to, it didn't catch me by surprise).
When I got a replacement front door made in steel I was very careful to ensure there was clearance, which there is but not very much.
There is a step into my kitchen which has a 15mm higher floor level due to me installing retro-fit UFH. I don't notice it day-to-day.
Proud member of the wokerati, though I don't eat tofu.Home is where my books are.Solar PV 5.2kWp system, SE facing, >1% shading, installed March 2019.Mortgage free July 20230 -
Luckily the hallway floor sits quite low, it will actually be nicer to raise it up a bit I think. The door has about 40mm of clearance so plenty of space for a new floor 😀 24mm engineered wood must be lovely quality and warm underfoot?
I think that is a good call for using the solid wood threshold strip, I think trying to bridge the two rooms without one might be a bit ambitious.
1
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 355.8K Banking & Borrowing
- 254.9K Reduce Debt & Boost Income
- 456.1K Spending & Discounts
- 248.3K Work, Benefits & Business
- 605.9K Mortgages, Homes & Bills
- 179K Life & Family
- 263.7K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards
