New DFS TESTS
CEC Email energyclub@moneysavingexpert.com
Comments
-
404? and some more characters
0 -
A few clues to indicate what we are discussing would help. AFAIK, DFS is a furniture store.
Reed2 -
It is duplicated. Should be:
https://www.neso.energy/document/385526/download
1 -
iPad copy/paste does not always play nice, fixed the link 🙄
4.8kWp 12x400W Longhi 9.6 kWh battery Giv-hy 5.0 Inverter, WSW facing Essex . Aint no sunshine ☀️ Octopus gas fixed 5.07 + Octopus Intelligent Flux leccy
CEC Email energyclub@moneysavingexpert.com0 -
NESO Demand Flexibilty Service like Power Ups/Downs Octopus saving sessions and their ilk.
Demand Flexibility Service (DFS)
Market Information Report
Published: 11 August 2026
Key Points
• We are aiming to conduct three tests between the 29 Aug and 13 September
2026.
• Two of these tests will be for delivery on a weekend.
• The tests will include a Guaranteed Acceptance Price (GAP)
• If required, further updates will be communicated via an additional Market
Information Report.
Testing Summary
NESO is proposing to run three DFS test events with a Guaranteed Acceptance Price
(GAP) between the 29 August and 13 September 2026. These targeted tests are intended
to provide a robust evidence base to inform future service development, operational
planning and locational constraint management go live preparation. The tests will
support a clearer assessment of available consumer flexibility across different zones,
service directions and seasonal conditions, while also increasing confidence in the role
DFS can play in supporting both national and locational system requirements.
The proposed programme of tests has been designed to focus on areas where the
resulting insight is expected to be of greatest operational value. This includes assessing
full volume demand turn up ahead of future summer operability planning, testing
locational demand turn down in an area where import constraints are considered most
likely, and assessing locational demand turn up in a zone with potential export
constraint relevance outside the Local Constraint Market (LCM) area. Please see
Appendix 1, Figure 1 for the DFS Zone Model. In line with our announced change to use
DFS for constraint management, this will give process assurance and volume
4.8kWp 12x400W Longhi 9.6 kWh battery Giv-hy 5.0 Inverter, WSW facing Essex . Aint no sunshine ☀️ Octopus gas fixed 5.07 + Octopus Intelligent Flux leccy
CEC Email energyclub@moneysavingexpert.com1
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 355.5K Banking & Borrowing
- 254.8K Reduce Debt & Boost Income
- 456K Spending & Discounts
- 248.1K Work, Benefits & Business
- 605.6K Mortgages, Homes & Bills
- 179K Life & Family
- 263.4K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.7K Read-Only Boards