📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!

Is my New IHD Broken?

JohnSwift10
JohnSwift10 Posts: 581
Fifth Anniversary 100 Posts Photogenic Name Dropper
Forumite
edited 21 May at 9:07AM in Energy

On Monday I had new smart meters fitted by BG and they are sending data to BG, I can see my usage on the BG app.

However the IHD is displaying awaiting data please see system status.

I have it plugged in to a socket on the other side of the meters so the WIFI signal is shown as maximum so how long does it take to synchronise with the meters?

I was told 24 -72 hours by the fitter. and that has passed.

This is the IHD

TR2L-A-QGR-001_04.indd

«134

Comments

  • tim_p
    tim_p Posts: 961
    Ninth Anniversary 500 Posts Name Dropper
    Forumite

    maybe it can take a day or three but when mine was done it was all working by the time the fitter left (elec only)

  • QrizB
    QrizB Posts: 25,378
    10,000 Posts Fifth Anniversary Photogenic Name Dropper
    Forumite

    It's probably still waiting to sync.

    If it hasn't started giving data by Monday, complain to BG.

    N. Hampshire, he/him. Octopus Intelligent Go elec / Fuse gas / Vodafone BB / iD mobile. Kirk Hill Co-op member.
    2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 37 MWh generated, long-term average 2.6 Os.
    Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Ecoflow Stream, Best kettle :-)
  • sheenas
    sheenas Posts: 625
    500 Posts Second Anniversary Name Dropper
    Forumite

    Try unplugging and plugging in again (power cycling it). This happened to mine, on install it was working, then stopped, after a few days it was working again.

  • Rodders53
    Rodders53 Posts: 3,026
    Part of the Furniture 1,000 Posts Name Dropper Photogenic
    Forumite

    It took quite a long time for mine to think Octopus rather than EoN was my supplier. Then again it took a month for Octopus to see my meter properly properly (and well after the IHD said Octopus).

    Which reminds me. Time to disconnect and rebox it, until the next supplier switch time.

  • JohnSwift10
    JohnSwift10 Posts: 581
    Fifth Anniversary 100 Posts Photogenic Name Dropper
    Forumite

    I have not changed supplier I was told by BG my metiers were old (SMET 1 10 years aold) and needed replaved.

    The old meters and the IHD worked OK I always knew when my wife was making me a cup of coffee.

  • QrizB
    QrizB Posts: 25,378
    10,000 Posts Fifth Anniversary Photogenic Name Dropper
    Forumite
    edited 21 May at 5:11PM

    Try unplugging and plugging in again (power cycling it).

    If you want to power cycle it, remove the batteries first. Unless they've changed the design, the back (where the stand is) slides off and you'll find three AAAs underneath it.

    N. Hampshire, he/him. Octopus Intelligent Go elec / Fuse gas / Vodafone BB / iD mobile. Kirk Hill Co-op member.
    2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 37 MWh generated, long-term average 2.6 Os.
    Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Ecoflow Stream, Best kettle :-)
  • Marvel1
    Marvel1 Posts: 7,549
    Part of the Furniture 1,000 Posts Name Dropper
    Forumite
    edited 21 May at 8:22PM

    Had a smart meter a year ago, same issue, tried a few times and has never worked.

  • Chrysalis
    Chrysalis Posts: 4,950
    Part of the Furniture 1,000 Posts Photogenic Name Dropper
    Forumite

    I have never heard of one that isnt working the same day , to then just start working, unless it had no signal.

    When I first had smart meter fitted, the original IHD didnt work, after some time harasing my supplier who was Octopus, another appointment was made, and an engineer gave me a 2nd IHD and his phone number, told me he would come back later if wasnt working, but luckily did work not long after he left.

  • Bigphil1474
    Bigphil1474 Posts: 4,342
    Part of the Furniture 1,000 Posts Photogenic Name Dropper
    Forumite

    We are with British gas and had smart meters installed in 2024, I'm pretty sure it took about a week before the readings were displayed. Took about another week before the IHD went to sleep in the sideboard drawer. I just use the app.

★ ★ ★ Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 355.9K Banking & Borrowing
  • 255K Reduce Debt & Boost Income
  • 456.2K Spending & Discounts
  • 248.4K Work, Benefits & Business
  • 606.1K Mortgages, Homes & Bills
  • 179K Life & Family
  • 263.9K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.2K Discuss & Feedback
  • 37.7K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.