Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Plug in solar
Comments
-
External sockets aren't that expensive, you can get fittings that are IP66 with cable plugged in. For example £7.89 from Screwfix ..
That's a normal 13A.
1 -
But AFAIK you cannot fit them yourself as a new install - only a like for like replacement.
0 -
You may be correct, I tend to think in terms of Scotland where it wouldn't be notifiable. Is it the fact that it's outdoors that makes it an issue?
0 -
Part P of building regs in England Wales - and I though whilst inside work might not count - I thought outside did - but even that might depend on whether its RCD protected in a couple of forum posts - but those are pretty old posts.
0 -
As things currently stand, installation of a grid-tied solar PV system is itself "notifiable work".
If they're really going to make plug-in PV a DIY option, they're going to have to change what's notifiable. We'll have to wait and see exactly what the rules are (or choose to ignore them).
N. Hampshire, he/him. Octopus Intelligent Go elec / Fuse gas / Vodafone BB / iD mobile. Kirk Hill Co-op member.Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Ecoflow Stream, Best kettle :-)
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 37 MWh generated, long-term average 2.6 Os.1 -
It certainly will add at least 50% to the cost, putting pay back a few years.
0 -
Changing regulations is easy for a government. All it needs is an announcement by a minister and the approval of parliament.
If it sticks, force it.
If it breaks, well it wasn't working right anyway.0 -
As well the Wiring Regulations they could do with tweaking the DNO approval process. Otherwise everyone would be obliged to submit a G.98 notification.
2 -
The DNO process could be changed to say that a G.98 application is not required below some peak output level, say 1 kW. So if your panels aren't capable of producing as much as1 kW of output then a G.98 application is not required. Although if balcony solar became popular in a block of flats then the total power output from the block could get quite large.
Reed1 -
Otherwise everyone would be obliged to submit a G.98 notification.
I guess that, if this requirement isn't removed, it would be pretty simple for retailers to include a preprinted G98 notification in the box with the kit. The purchaser could add their address to it and then post to their DNO.
N. Hampshire, he/him. Octopus Intelligent Go elec / Fuse gas / Vodafone BB / iD mobile. Kirk Hill Co-op member.Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Ecoflow Stream, Best kettle :-)
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 37 MWh generated, long-term average 2.6 Os.0
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 355.9K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.2K Spending & Discounts
- 248.4K Work, Benefits & Business
- 606.1K Mortgages, Homes & Bills
- 179.1K Life & Family
- 263.9K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards