Electric Meter EoL

HillStreetBlues
Posts: 5,134 Forumite


Anyone have an idea when this type of meter reaches it's end of life? (photo is not my meter)


Let's Be Careful Out There
0
Comments
-
The longest life I recall seeing on the list was 40 years, and the sticker on that one seems to say it was certified in 1981 - which is more than 40 years ago.Edit to add:The list is here:
https://www.gov.uk/government/publications/schedule-4-uk-nationally-approved-electricity-metersSecond edit:L&G CL27.2 has a certified life of 35 years. See the middle of page 23 of the current list.
N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Shell (now TT) BB / Lebara mobi. Ripple Kirk Hill member.
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 33MWh generated, long-term average 2.6 Os.Not exactly back from my break, but dipping in and out of the forum.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!2 -
According to https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1126202/schedule-4-december-2022.pdf all the Landis & Gyr meters it mentions are certified for 10 years.0
-
GingerTim said:According to https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1126202/schedule-4-december-2022.pdf all the Landis & Gyr meters it mentions are certified for 10 years.
N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Shell (now TT) BB / Lebara mobi. Ripple Kirk Hill member.
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 33MWh generated, long-term average 2.6 Os.Not exactly back from my break, but dipping in and out of the forum.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!2 -
QrizB said:GingerTim said:According to https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1126202/schedule-4-december-2022.pdf all the Landis & Gyr meters it mentions are certified for 10 years.1
-
Thanks all, that's not my meter just the type CL27.2
Mine was installed in Jul 08, so I make it EoL is Jul 2043. ( I would never have found it in the list)
Let's Be Careful Out There0 -
HillStreetBlues said:Thanks all, that's not my meter just the type CL27.2
Mine was installed in Jul 08, so I make it EoL is Jul 2043. ( I would never have found it in the list)The date of installation isn't important, its the date it was last checked/certified/calibrated.The only marking on the meter that looks at all like that is "CERT 81" on the white sticker.
N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Shell (now TT) BB / Lebara mobi. Ripple Kirk Hill member.
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 33MWh generated, long-term average 2.6 Os.Not exactly back from my break, but dipping in and out of the forum.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!3 -
HillStreetBlues said:Thanks all, that's not my meter just the type CL27.2
Mine was installed in Jul 08, so I make it EoL is Jul 2043. ( I would never have found it in the list)1 -
Pity, I thought they would be recertified when installed.
No other sticker on my one
Let's Be Careful Out There0 -
Did I read somewhere on this forum that the first 2 numbers of the meter number indicate year of manufacture? If no sticker saying re-certified then the year it was made would be when it was last checked.Barnsley, South Yorkshire
Solar PV 5.25kWp SW facing (14 x 375) Lux 3.6kw hybrid inverter installed Mar 22 and 9.6kw Pylontech battery
Daikin 8kW ASHP installed Jan 25
Octopus Cosy/Fixed Outgoing1 -
Alnat1 said:Did I read somewhere on this forum that the first 2 numbers of the meter number indicate year of manufacture? If no sticker saying re-certified then the year it was made would be when it was last checked.
Mine starts with L95 so could will be that.
Let's Be Careful Out There0
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 348.6K Banking & Borrowing
- 252.3K Reduce Debt & Boost Income
- 452.5K Spending & Discounts
- 241.3K Work, Benefits & Business
- 617.8K Mortgages, Homes & Bills
- 175.8K Life & Family
- 254.5K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 15.1K Coronavirus Support Boards