We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
The Forum now has a brand new text editor, adding a bunch of handy features to use when creating posts. Read more in our how-to guide
Electric Meter EoL
HillStreetBlues
Posts: 6,434 Forumite
Anyone have an idea when this type of meter reaches it's end of life? (photo is not my meter)


Let's Be Careful Out There
0
Comments
-
The longest life I recall seeing on the list was 40 years, and the sticker on that one seems to say it was certified in 1981 - which is more than 40 years ago.Edit to add:The list is here:
https://www.gov.uk/government/publications/schedule-4-uk-nationally-approved-electricity-metersSecond edit:L&G CL27.2 has a certified life of 35 years. See the middle of page 23 of the current list.
N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Vodafone BB / iD mobile. Ripple Kirk Hill Coop member.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 35 MWh generated, long-term average 2.6 Os.2 -
According to https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1126202/schedule-4-december-2022.pdf all the Landis & Gyr meters it mentions are certified for 10 years.0
-
It's listed under Siemens.GingerTim said:According to https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1126202/schedule-4-december-2022.pdf all the Landis & Gyr meters it mentions are certified for 10 years.
N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Vodafone BB / iD mobile. Ripple Kirk Hill Coop member.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 35 MWh generated, long-term average 2.6 Os.2 -
I'm blaming having misplaced my glasses! New meter time for the OP, anyway.QrizB said:
It's listed under Siemens.GingerTim said:According to https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1126202/schedule-4-december-2022.pdf all the Landis & Gyr meters it mentions are certified for 10 years.1 -
Thanks all, that's not my meter just the type CL27.2
Mine was installed in Jul 08, so I make it EoL is Jul 2043. ( I would never have found it in the list)
Let's Be Careful Out There0 -
HillStreetBlues said:Thanks all, that's not my meter just the type CL27.2
Mine was installed in Jul 08, so I make it EoL is Jul 2043. ( I would never have found it in the list)The date of installation isn't important, its the date it was last checked/certified/calibrated.The only marking on the meter that looks at all like that is "CERT 81" on the white sticker.
N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Vodafone BB / iD mobile. Ripple Kirk Hill Coop member.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 35 MWh generated, long-term average 2.6 Os.3 -
That assumes it was manufactured in 2008 which it almost certainly wasn't.HillStreetBlues said:Thanks all, that's not my meter just the type CL27.2
Mine was installed in Jul 08, so I make it EoL is Jul 2043. ( I would never have found it in the list)1 -
Pity, I thought they would be recertified when installed.
No other sticker on my one
Let's Be Careful Out There0 -
Did I read somewhere on this forum that the first 2 numbers of the meter number indicate year of manufacture? If no sticker saying re-certified then the year it was made would be when it was last checked.Barnsley, South Yorkshire
Solar PV 5.25kWp SW facing (14 x 375) installed Mar 22
Lux 3.6kw hybrid inverter and 9.6kw Pylontech batteries
Daikin 8kW ASHP installed Jan 25
Octopus Cosy/Fixed Outgoing1 -
Never even thought of the meter number, I was just looking for a cert number.Alnat1 said:Did I read somewhere on this forum that the first 2 numbers of the meter number indicate year of manufacture? If no sticker saying re-certified then the year it was made would be when it was last checked.
Mine starts with L95 so could will be that.
Let's Be Careful Out There0
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 353.4K Banking & Borrowing
- 254.1K Reduce Debt & Boost Income
- 455K Spending & Discounts
- 246.5K Work, Benefits & Business
- 602.7K Mortgages, Homes & Bills
- 178K Life & Family
- 260.4K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards


