I'm getting a 3.2KwH system installed with a battery. I intend on upgrading this to 6.4 KwH in the future, and more batteries. The only thing stopping me from putting more panels on atm is that I need a structural survey and planning permission. Those two are required because I've got a flat roof. I can have 8 panels otherwise
Given this, I'm not sure what tariff is the best?
Thanks
I'm getting a 3.2KwH system installed with a battery. I intend on upgrading this to 6.4 KwH in the future, and more batteries. The only thing stopping me from putting more panels on atm is that I need a structural survey and planning permission. Those two are required because I've got a flat roof. I can have 8 panels otherwise
Given this, I'm not sure what tariff is the best?
Thanks
0
Comments
-
Can you describe your PV and battery in more detail? A 3.2 kW system is a bit on the small side these days, especially if you have an EV.
It's a lot more complex having two systems than one larger one, I'd wait on the planning permission.8kW (4kW WNW, 4kW SSE) 6kW inverter. 6.5kWh battery.1 -
ABrass said:Can you describe your PV and battery in more detail? A 3.2 kW system is a bit on the small side these days, especially if you have an EV.
It's a lot more complex having two systems than one larger one, I'd wait on the planning permission.
Also FWIW, the company in question said they can upsize the inverter now so it's ready to take an extra 8 panels and more batteries in the future. So, I wouldn't be running two separate systems. I'd just be adding to the first
The system is 3.2KwH of 8 x 400w Sharp Panels + a battery ready inverter + one 3.3Kw battery
The inverter can take six batteries, in series and it can handle enough battery power for a further eight panels + five additional batteries0 -
There's a lot of details about expanding the size of a solar system. I would require a lot of details on what inverter they're recommending and how it would be managed with MCS and DNO applications before I'd go for that. For example your 3.68kW inverter might be able to manage 6.4kW of panels but you'd have a lot of clipping.
With a dinky 3.3kWh battery you're probably better off with Agile export. If you wanted to use Go to fill up your battery you'd want/need enough battery to last a typical day of use.8kW (4kW WNW, 4kW SSE) 6kW inverter. 6.5kWh battery.2 -
ABrass said:There's a lot of details about expanding the size of a solar system. I would require a lot of details on what inverter they're recommending and how it would be managed with MCS and DNO applications before I'd go for that. For example your 3.68kW inverter might be able to manage 6.4kW of panels but you'd have a lot of clipping.
With a dinky 3.3kWh battery you're probably better off with Agile export. If you wanted to use Go to fill up your battery you'd want/need enough battery to last a typical day of use.
Growatt SPH6000w
In order to facilitate 16 panels and also a further 10kWh of battery storage (give it take)
Also, sorry, clipping?0 -
Clipping is when your panels are exporting more power than your inverter can use. For example I have 8kW of panels connected to a SPH6000.
Because of a split layout I rarely get all my panels fully exposed to the sun, but when they do sometimes I have more than 6kW of power coming in. When that happens I can't convert it and so the extra it is lost. That energy is 'clipped', the term comes from the shape you get on a graph where a smooth curve up has the top clipped off flat.
With up to 6.4kW of panels you would not experience clipping. It is not recommended to have a larger Inverter than your panels for efficiency reasons, but someone else can explain that.
8kW (4kW WNW, 4kW SSE) 6kW inverter. 6.5kWh battery.1 -
ABrass said:Clipping is when your panels are exporting more power than your inverter can use. For example I have 8kW of panels connected to a SPH6000.
Because of a split layout I rarely get all my panels fully exposed to the sun, but when they do sometimes I have more than 6kW of power coming in. When that happens I can't convert it and so the extra it is lost. That energy is 'clipped', the term comes from the shape you get on a graph where a smooth curve up has the top clipped off flat.
With up to 6.4kW of panels you would not experience clipping. It is not recommended to have a larger Inverter than your panels for efficiency reasons, but someone else can explain that.
FWIW, I've decided to get 8 panels "for now" and then the flat roof may or may not need to be reinforced following a structural survey
That's the only reason why I'm getting that inverter. Also, my 8 panels would be west facing or so. The 8 additional would be south facing given they'll be on my flat roof and they'll add beams on0 -
Why can't you angle them south being a flat roof?4.29kWp Solar system, 45/55 South/West split in cloudy rainy Cumbria.0
-
Makes more sense to me to get the flat roof sorted first and have the whole system installed at the same time. Surely it will work out much cheaper only having the scaffolders/installers/electricians once?Barnsley, South Yorkshire
Solar PV 5.25kWp SW facing (14 x 375) Lux 3.6kw hybrid inverter installed Mar 22 and 9.6kw Pylontech battery
Daikin 8kW ASHP installed Jan 25
Octopus Cosy/Fixed Outgoing0 -
Spies said:Why can't you angle them south being a flat roof?0
-
Worth noting that Octopus have revised their Go and Intelligent rates for new sign-ups in light of the EPG.
- The Go cheap rate is 12p/kWh and they've dropped all the "Go Faster" options.
- For my region, E7 is 14.83p/kWh (but for seven hours, not four).
- Intelligent Octopus hasd a 10p/kWh off-peak rate.
All three tariffs have the same peak rate, 43.37p/kWh in my region, and the same 42.86p/day standing charge.N. Hampshire, he/him. Octopus Intelligent Go elec & Tracker gas / Vodafone BB / iD mobile. Ripple Kirk Hill member.
2.72kWp PV facing SSW installed Jan 2012. 11 x 247w panels, 3.6kw inverter. 34 MWh generated, long-term average 2.6 Os.Not exactly back from my break, but dipping in and out of the forum.Ofgem cap table, Ofgem cap explainer. Economy 7 cap explainer. Gas vs E7 vs peak elec heating costs, Best kettle!2
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.1K Banking & Borrowing
- 253.2K Reduce Debt & Boost Income
- 453.7K Spending & Discounts
- 244.1K Work, Benefits & Business
- 599.2K Mortgages, Homes & Bills
- 177K Life & Family
- 257.5K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.6K Read-Only Boards