We’d like to remind Forumites to please avoid political debate on the Forum.

This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.

PLEASE READ BEFORE POSTING: Hello Forumites! In order to help keep the Forum a useful, safe and friendly place for our users, discussions around non-MoneySaving matters are not permitted per the Forum rules. While we understand that mentioning house prices may sometimes be relevant to a user's specific MoneySaving situation, we ask that you please avoid veering into broad, general debates about the market, the economy and politics, as these can unfortunately lead to abusive or hateful behaviour. Threads that are found to have derailed into wider discussions may be removed. Users who repeatedly disregard this may have their Forum account banned. Please also avoid posting personally identifiable information, including links to your own online property listing which may reveal your address. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!

The order of things when you first move in

paulj2021
paulj2021 Posts: 138 Forumite
10 Posts Name Dropper Photogenic
edited 9 January 2022 at 10:30AM in House buying, renting & selling
Hello, finally moving next week to my next house, 3 bedroom two floor semi,  it’s in good general order but needs some building work (new boiler and some radiators, some electrical fittings renewed or moved, a couple of windows and doors replaced ) and decorating etc, I also want to slightly reconfigure its internal layout by knocking two rooms together. In addition I  have to live in it at the same time, but there’s enough space for one or two rooms to be worked on at a time while I live in others. I’m just wondering, what order should I get tradespeople  in? For example I don’t want to get new carpets in and then have to access underneath. Can anyone offer any insight, or is there any online guide which can assist with the work planning?

Comments

  • YBR
    YBR Posts: 751 Forumite
    Seventh Anniversary 500 Posts Mortgage-free Glee! Name Dropper
    It's generally a process of thinking through the potential needs and consequences of each job
    e.g. pipes may need to go underfloor, so do plumbing prior to flooring; electrical wires may be put in then plastered over do decorate after electrics, but before flooring to avoid pain dripping on carpets.
    Decluttering awards 2025: 🏅🏅🏅🏅⭐️⭐️⭐️ ⭐️⭐️, DH: 🏅🏅⭐️, DD1: 🏅 and one for Mum: 🏅
  • canaldumidi
    canaldumidi Posts: 3,511 Forumite
    Tenth Anniversary 1,000 Posts Name Dropper Combo Breaker
    Make a list of all the jobs and then consider the impactof each. Obviously major construction comes first (wall demolition) and underfloor stuff (electrics, plumbing, wood preservation). painting, decorating and carpeting is at the end, though you could break some of down room by room.
  • pumas
    pumas Posts: 198 Forumite
    Fifth Anniversary 100 Posts
    And do you need any permissions e.g. removal of wall etc..
  • UnderOffer
    UnderOffer Posts: 815 Forumite
    Fifth Anniversary 500 Posts Name Dropper
    You definitely need to do the messy and disruptive work first, from your list I’d start with: 
    • Removal of wall to merge two rooms
    • New boiler, radiators and associated pipe work
    • Electrical works
    • Window and door replacements 
    • Decorating
    • Flooring 
    Sounds like quite a lot of disruption, but worth it to get your home how you’d like it. Good luck. 
  • getmore4less
    getmore4less Posts: 46,882 Forumite
    Part of the Furniture 10,000 Posts Name Dropper I've helped Parliament
     I  have to live in it at the same time, but there’s enough space for one or two rooms to be worked on at a time while I live in others.

    Might help is you can make that the other way round,  live in one/two rooms while the the major work is done on the rest.

    The wall coming out  what is that supporting?

    unpack as little as possible and store outside the property if possible,  going to be dust and mess everywhere.
  • Mutton_Geoff
    Mutton_Geoff Posts: 4,028 Forumite
    Part of the Furniture 1,000 Posts Name Dropper Photogenic
    And personally I would do nothing for 6 months. Move in, get a feel for your home, your ideas for changes will alter. Get to know the neighbours, local tradesmen etc. Then push the button to do the work. And work from top down.
    Signature on holiday for two weeks
  • canaldumidi
    canaldumidi Posts: 3,511 Forumite
    Tenth Anniversary 1,000 Posts Name Dropper Combo Breaker
    pumas said:
    And do you need any permissions e.g. removal of wall etc..

    That will of course require Building Regulations certification by Building Control.
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 352.1K Banking & Borrowing
  • 253.5K Reduce Debt & Boost Income
  • 454.2K Spending & Discounts
  • 245.1K Work, Benefits & Business
  • 600.7K Mortgages, Homes & Bills
  • 177.4K Life & Family
  • 258.9K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.2K Discuss & Feedback
  • 37.6K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.