Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Skimming and tiling quote fair?
We're looking to get our bathroom walls skimmed over the top of thick artex which is floor to ceiling (though not looking to get the ceiling itself done to save money, especially as the rest of the house has it anyway), but also have a small area retiled.
The work would include removing the old tiles which we're looking to get replaced with standard size white tiles (200mm X 200mm) - again to hopefully keep the cost down.
Room dimensions are:
1620mm width
2200mm length
2500mm height
Tiled area (to be replaced) dimensions are:
Back wall - 1620mm width
Left wall - 670mm width
Right wall - 700mm width
Height for all tiled areas - 1400mm
So far we've only received 1 quote (more on the way) which is coming out at £1,500 excluding the tiles but including the plaster, grout and mastic (so some materials). This is based on 4 days (5 days maximum we've been told) and 2 men working on it.
I've asked for a properly broken down quote as this is all the information we've been given so far.
Obviously we will wait for at least 2 more quotes and we have other contacts in mind but does this seem to be about the average?
Is this a service that places like Topps Tiles or other high street brands could offer?
Many thanks!
Comments
-
Assuming 4 days, that works out at ~£185 per man per day - Not outlandish, and about the going rate. Make sure it is a fixed price, and then you won't get charged extra if it does run to a 5 day job.Shoxt3r said: So far we've only received 1 quote (more on the way) which is coming out at £1,500 excluding the tiles but including the plaster, grout and mastic (so some materials). This is based on 4 days (5 days maximum we've been told) and 2 men working on it.
Any language construct that forces such insanity in this case should be abandoned without regrets. –
Erik Aronesty, 2014
Treasure the moments that you have. Savour them for as long as you can for they will never come back again.1 -
Ok thanks for the feedback and also for the tip about fixing prices. As I say it's early days (we have more quotes coming) and that isn't even the final quote including all materials yet.FreeBear said:
Assuming 4 days, that works out at ~£185 per man per day - Not outlandish, and about the going rate. Make sure it is a fixed price, and then you won't get charged extra if it does run to a 5 day job.Shoxt3r said: So far we've only received 1 quote (more on the way) which is coming out at £1,500 excluding the tiles but including the plaster, grout and mastic (so some materials). This is based on 4 days (5 days maximum we've been told) and 2 men working on it.0
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 355.9K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.2K Spending & Discounts
- 248.4K Work, Benefits & Business
- 606.1K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards