PLEASE READ BEFORE POSTING: Hello Forumites! In order to help keep the Forum a useful, safe and friendly place for our users, discussions around non-MoneySaving matters are not permitted per the Forum rules. While we understand that mentioning house prices may sometimes be relevant to a user's specific MoneySaving situation, we ask that you please avoid veering into broad, general debates about the market, the economy and politics, as these can unfortunately lead to abusive or hateful behaviour. Threads that are found to have derailed into wider discussions may be removed. Users who repeatedly disregard this may have their Forum account banned. Please also avoid posting personally identifiable information, including links to your own online property listing which may reveal your address. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
New Build Property - Building Regs Contravention?
 
            
                
                    RPF1992                
                
                    Posts: 47 Forumite
         
             
         
         
             
         
         
             
                         
            
                        
             
         
         
            
                    Hi All,
I have just moved into a new build flat. We are having issues with soundproofing / noise travelling from our neighbours properties. The developers have been less than forthcoming and have stopped all comms with us.
                I have just moved into a new build flat. We are having issues with soundproofing / noise travelling from our neighbours properties. The developers have been less than forthcoming and have stopped all comms with us.
We’ve started speaking with the Building Control Manager of our local council and have chatted with the architects who have given us the most up to date plans that we’re submitted for council sign off. 
We’ve noticed that the plans submitted are drastically different to the current layout of our property and concerned this is the reason for sound issues. 
To give you an example, the original plan had an en-suite which is no longer there and the utility cupboard has moved across the other side of the property (containing boiler, underfloor heating pumps, electric circuit board etc).
I’m wondering if this drastic change of plans are allowed or are they a contravention of the building regs?
I’m wondering if this drastic change of plans are allowed or are they a contravention of the building regs?
We’ve been told by a contractor of the developers that the property layout changed twice due to issues with space and that they have left pipe work in place where the en-suite used to be, meaning that there are just waste/water pipes left in position but with no facilities, which is concerning! 
Thanks in advance for your help!
                0        
            Comments
- 
            Is the unused pipework visible? If so is it capped? What are you looking for as an outcome?
 If you are querying your Council Tax band would you please state whether you are in England, Scotland or Wales0
- 
            Pipework isn’t visible, so have no idea if it’s been called. All we have been told by the contractors is that an en-suite has been installed then take out again but pipework a lot of has been left in.The outcome is to ultimately find the source of the sound issue and secondly, ensure that the flat we’ve paid for has been built within building regs.Can you drastically change a flat layout after approval on completely different plans?0
- 
            Building control don't just look at the plans, they will also have come out and inspected the site. So likely that any changes to the plans were inspected and agreed on site with the building control officer. If you have a building control completion certificate then that is against the completed scheme, not the original drawings - you shouldn't have been able to complete/move in without building regs sign-off.
 Noise is a separate issue, and a common problem. Doesn't mean that it hasn't been built in accordance with building regs, very difficult to eliminate all noise transfer - that's why detached properties can charge a premium.0
- 
            Yes you can change the layout. Building Control will concern themselves with the way that something is built. They won't concern themselves with the layout unless it affects accessibility or escape means and triggers a new or different requirement.Ensuites and cupboards would not. Moving studwork is not going to affect soundproofing measures above the ceilings of the flat.Everything that is supposed to be in heaven is already here on earth.
 0
Confirm your email address to Create Threads and Reply
 
Categories
- All Categories
- 352.2K Banking & Borrowing
- 253.6K Reduce Debt & Boost Income
- 454.3K Spending & Discounts
- 245.3K Work, Benefits & Business
- 601K Mortgages, Homes & Bills
- 177.5K Life & Family
- 259.1K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards

 
          
          
         