We’d like to remind Forumites to please avoid political debate on the Forum.

This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.

PLEASE READ BEFORE POSTING: Hello Forumites! In order to help keep the Forum a useful, safe and friendly place for our users, discussions around non-MoneySaving matters are not permitted per the Forum rules. While we understand that mentioning house prices may sometimes be relevant to a user's specific MoneySaving situation, we ask that you please avoid veering into broad, general debates about the market, the economy and politics, as these can unfortunately lead to abusive or hateful behaviour. Threads that are found to have derailed into wider discussions may be removed. Users who repeatedly disregard this may have their Forum account banned. Please also avoid posting personally identifiable information, including links to your own online property listing which may reveal your address. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!

New build: developer won't provide plumbing or wiring plans

2»

Comments

  • jmmo20
    jmmo20 Posts: 105 Forumite
    Part of the Furniture 10 Posts Combo Breaker
    Alan2020 said:
    Oh and a bit of advice to you, find the stop tap - usually in the kitchen cupboard under the sink and turn it off, if water doesn't come anymore in the kitchen cold and elsewhere connected to the mains - high pressure, that is your feed.  Your water softener goes there with a bypass and valves for kitchen and emergencies
    Alan2020 said:
    Hasn't it crossed your mind that such a plan does not exist.  Think about it for a moment, why would a small builder need such plans for a trivial job.  Building control doesn't need them either.  There is usually a note saying will be decided on site.  They are not building a Space ship, its a primitive house.  A few hours of spent using a bit of detective work and common sense will reveal all.  Don't worry too much, you will have to lift everything if something goes wrong.  Just relax and enjoy your home.  Even if a plan existed most wouldn't be followed anywhere remotely closely.
    Very good advice :) I tend to overthink stuff and because of my medical background I get a bit spooked if I don't understand 100% where everything is and how it works. I can't help it!

    As for the stop tap.. it's not in the kitchen because the kitchen is at the back of the property. There's a pipe coming into the garage and from there I think at some point the tube gets into a recessed corner in the downstairs cloakroom where it's connected to two copper pipes. one goes upstairs so I assume that's going into the heating system. The other pipe goes towards the kitchen so I think that's where the downstairs toilet and kitchen are fed from. This recess in the cloakroom is tiny and barely fits my hand behind the door, there's a flat stop valve (like the ones with a flat head that you need to use a flat screwdriver). I'm guessing that in order to install a water filter we'll probably have to install it in the garage somehow, right before the mains pipe forks out into two.
  • anselld
    anselld Posts: 8,753 Forumite
    Part of the Furniture 1,000 Posts Name Dropper
    You also need to decide what water you want softened.  It is not advisable to soften the drinking water so if you soften the whole house you would need to run a new drinking water feed to the kitchen which could be difficult.  It may be easier to leave the kitchen and downstairs loo unsoftened and just soften the upstairs branch if that is where the boiler and showers are.
  • Even if a schematic diagram was ever produced (which I doubt), there is no reason why the sparky and plumber might run a pipe or cable up then across or across then up to get from A to B. Even in identical adjacent houses it could be laid out differently.
    Signature on holiday for two weeks
  • A colleague at work bought a new build in 2019 and he requested the drawings from the developer of his plot.  They asked for a small fee (~£100, IIRC) and collected them from the site office not long afterwards.  Well worth having this information - it may not be classed as precise as-builts but should show the intent of the layouts.  Also consider finding out the make/model/source for bricks/tiles/mortar/etc. so you can match any future works...
    Good luck
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 355K Banking & Borrowing
  • 254.6K Reduce Debt & Boost Income
  • 455.7K Spending & Discounts
  • 247.8K Work, Benefits & Business
  • 604.8K Mortgages, Homes & Bills
  • 178.7K Life & Family
  • 262.5K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.1K Discuss & Feedback
  • 37.7K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.