Manhole over extension

Options
We’ve recently had an extension, and we needed to get a build over agreement from Thames water which covers the old manhole now under our kitchen!
TW gave us permission so we now have an access chamber on our patio.
My question relates to the old manhole now under our extension. What should you/need to do with this? Is it a case of sealing it? How?
To cut a long story short we think we’ve had rat issues recently, we had a drain survey done which showed a potential fault between the new and old drain. We asked our builders to come back and they took up the kitchen floor yesterday. No connection issue with that part of the drain but I’m not convinced they’ve covered the old manhole correctly!

Comments

  • cjmc24
    cjmc24 Posts: 15 Forumite
    Second Anniversary First Post
    That’s my thread, but thanks! My question now  relates more to the manhole cover
  • Doozergirl
    Doozergirl Posts: 34,076 Forumite
    Part of the Furniture 10,000 Posts Name Dropper Photogenic
    edited 12 December 2020 at 9:53AM
    You shouldn't have a manhole inside the house now at all, because they're not allowed under the build over agreement.  The builders should have taken it all out and replaced it with pipe when they put in the new one on the patio. 
     
    It's going to be a bit difficult now! 
    Everything that is supposed to be in heaven is already here on earth.
  • Davesnave
    Davesnave Posts: 34,741 Forumite
    Part of the Furniture 10,000 Posts Name Dropper Photogenic
    You shouldn't have a manhole inside the house now at all, because they're not allowed under the build over agreement.  The builders should have taken it all out and replaced it with pipe when they put in the new one on the patio.
    Glad to get your confirmation on that. I was puzzling over what the builders expected to see when they 'took up the kitchen floor.'
    There should be nothing to see or inspect now, even if it was one of the bolt-down inspection covers originally.
  • Your BOA agreement with TW covers the removal of the old and installation of the new manhole. TW are now not interested in the existing and the sealing of it would fall under BR’s so check the requirements with them.
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 351.1K Banking & Borrowing
  • 253.1K Reduce Debt & Boost Income
  • 453.6K Spending & Discounts
  • 244.1K Work, Benefits & Business
  • 599K Mortgages, Homes & Bills
  • 177K Life & Family
  • 257.4K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.1K Discuss & Feedback
  • 37.6K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.