We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
The MSE Forum Team would like to wish you all a Merry Christmas. However, we know this time of year can be difficult for some. If you're struggling during the festive period, here's a list of organisations that might be able to help
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Has MSE helped you to save or reclaim money this year? Share your 2025 MoneySaving success stories!
Block paving cost breakdown?
swajarbal
Posts: 45 Forumite
We've been quoted £7000 to lay a 120sqm block paved driveway. This includes:
1. digging existing garden up
2. digging existing block paved drive up
3. grabbing and removing 2 lorry loads of waste
4. supplying 18 tonne of stone (sub-base)
5. levelling & compacting stone
6. supplying materials i.e 5612 'premium quality' paving blocks in 3 different colours (brindle, charcoal, buff), sand, weed membrane, aco drains
7. laying weed membrane, cutting blocks and laying drains
8. Compacting and brushing sand over the area
We are in dispute with the landscaper who took a £5000 deposit and after completing steps 1 - 4, has abandoned the job and claims we owe him money!
Can anyone provide an approx. cost breakdown for each of the above stages, or confirm what steps 1-4 should actually cost?
Thanks
1. digging existing garden up
2. digging existing block paved drive up
3. grabbing and removing 2 lorry loads of waste
4. supplying 18 tonne of stone (sub-base)
5. levelling & compacting stone
6. supplying materials i.e 5612 'premium quality' paving blocks in 3 different colours (brindle, charcoal, buff), sand, weed membrane, aco drains
7. laying weed membrane, cutting blocks and laying drains
8. Compacting and brushing sand over the area
We are in dispute with the landscaper who took a £5000 deposit and after completing steps 1 - 4, has abandoned the job and claims we owe him money!
Can anyone provide an approx. cost breakdown for each of the above stages, or confirm what steps 1-4 should actually cost?
Thanks
0
Comments
-
For number 3, ring around your local waste carriers for a price;
same for number 4 both will give you an idea of costs to some extent.
for the initial dig, was a small digger used? If so, again ring around for a day rate to hire oneBe happy, it's the greatest wealth
0
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 352.9K Banking & Borrowing
- 253.9K Reduce Debt & Boost Income
- 454.7K Spending & Discounts
- 246K Work, Benefits & Business
- 602.1K Mortgages, Homes & Bills
- 177.8K Life & Family
- 259.9K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards