We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Architect fees
Comments
-
We did a single story extension at the back of our property plus a dormer added to the back of the house to create an additional bedroom. Total cost of the design, measurements, drawing and overseeing application to council (We paid the council costs direct) was around £1,100 from memory. That quotes seems very expensive. Plans were hand drawn and builder commented about the detail on the plans with all measurements. he said you don't always get that. This was south Essex area.2
-
How much? He should be wearing a mask and carry a bag with the word swag on it. For less than 1000 i had my architect draw up plans for a 3 phase renovation and extension. You should not need him to do the tendering and why site visits? If you need engineering drawings you do that as you go.1
-
I'd be interested in the architect and builder if you can PM me? ThanksRaiderHammer said:We did a single story extension at the back of our property plus a dormer added to the back of the house to create an additional bedroom. Total cost of the design, measurements, drawing and overseeing application to council (We paid the council costs direct) was around £1,100 from memory. That quotes seems very expensive. Plans were hand drawn and builder commented about the detail on the plans with all measurements. he said you don't always get that. This was south Essex area.No man is worth crawling on this earth.
So much to read, so little time.0 -
@RaiderHammer How many bedrooms did your property have and was all that via PD?0
-
PD - Permitted development? Yes it was but we got the council to confirm our understanding was correct first with a certificate of (Something) can't recall the name of it now. It was something like £80 I think but worth it for peace of mind knowing it was legal.DevilDamo said:@RaiderHammer How many bedrooms did your property have and was all that via PD?
We had two bedrooms originally and went to three because of second child.0 -
I believe retired now but can send if you wish. But he was only doing local work in south east Essex when I used.Rosa_Damascena said:
I'd be interested in the architect and builder if you can PM me? ThanksRaiderHammer said:We did a single story extension at the back of our property plus a dormer added to the back of the house to create an additional bedroom. Total cost of the design, measurements, drawing and overseeing application to council (We paid the council costs direct) was around £1,100 from memory. That quotes seems very expensive. Plans were hand drawn and builder commented about the detail on the plans with all measurements. he said you don't always get that. This was south Essex area.0 -
Please do, the geography fits perfectly.RaiderHammer said:
I believe retired now but can send if you wish. But he was only doing local work in south east Essex when I used.Rosa_Damascena said:
I'd be interested in the architect and builder if you can PM me? ThanksRaiderHammer said:We did a single story extension at the back of our property plus a dormer added to the back of the house to create an additional bedroom. Total cost of the design, measurements, drawing and overseeing application to council (We paid the council costs direct) was around £1,100 from memory. That quotes seems very expensive. Plans were hand drawn and builder commented about the detail on the plans with all measurements. he said you don't always get that. This was south Essex area.No man is worth crawling on this earth.
So much to read, so little time.0 -
RaiderHammer said:We did a single story extension at the back of our property plus a dormer added to the back of the house to create an additional bedroom. Total cost of the design, measurements, drawing and overseeing application to council (We paid the council costs direct) was around £1,100 from memory. That quotes seems very expensive. Plans were hand drawn and builder commented about the detail on the plans with all measurements. he said you don't always get that. This was south Essex area.What did your extension cost ?Ours was going to be about 10 metres (the full depth of the building) by 3 metres (and would have been a kitchen + downstairs toilet/wetroom) but would have meant a drain and soil pipe being relocated - cost estimated at £60k !We started at about £30k +/-then £40kand now £60khe's not getting the job !
0 -
Certificate of Lawfulness/Lawful Development Certificate application. How long ago did you do that as the fee suggests it was a good few years ago now?RaiderHammer said:
PD - Permitted development? Yes it was but we got the council to confirm our understanding was correct first with a certificate of (Something) can't recall the name of it now. It was something like £80 I think but worth it for peace of mind knowing it was legal.DevilDamo said:@RaiderHammer How many bedrooms did your property have and was all that via PD?
We had two bedrooms originally and went to three because of second child.0
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 352.3K Banking & Borrowing
- 253.6K Reduce Debt & Boost Income
- 454.3K Spending & Discounts
- 245.3K Work, Benefits & Business
- 601.1K Mortgages, Homes & Bills
- 177.5K Life & Family
- 259.2K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards

