Noticed some changes? You can read all about the improvements we've made on the Forum in our latest announcement. We also have a new set of Forum rules so please take the time to give them a read and familiarise yourself.

Smart Export G'tee - metered via smart meter or should I have a seperate export meter?

edited 25 June 2020 at 7:24PM in Green & Ethical MoneySaving
1 reply 41 views
diveleaderdiveleader Forumite
131 Posts
Part of the Furniture 10 Posts Combo Breaker Name Dropper
edited 25 June 2020 at 7:24PM in Green & Ethical MoneySaving
I have just had my Powerwall / solar install completed and a generation meter has been fitted just after the solar inverter.
I have asked my installer for clarification but should I have a meter fitted on the export side of the install to qualify for SEG? Or is this performed by the smart meter? (when Octopus get round to fitting one).

Replies

  • PetriixPetriix Forumite
    808 Posts
    Fifth Anniversary 500 Posts Name Dropper
    ✭✭✭
    To get the SEG you need some kind of validated export meter, of which a regular smart meter is one. I find it pretty strange to get a solar installation without having the export metering in place. Didn't your installer talk you through everything?
Sign In or Register to comment.