What to do first?
Options

moonpenny
Posts: 2,506 Forumite


I want to have a drive laid, not sure what material yet maybe concrete or tarmac. Probably of no concern but, just have a pebble path with side strip of gravel at the moment.
Anyway, I need a new wrought iron (double) gate and feel like I should have drive first but then would have to have that dug up for posts for gate.
Do I have gate first?
Anyway, I need a new wrought iron (double) gate and feel like I should have drive first but then would have to have that dug up for posts for gate.
Do I have gate first?
0
Comments
-
How about both done together?Mortgage started 2020, aiming to clear 31/12/2029.0
-
I would put in the gates first at a level based or the present gravel level, but I would check with the tarmac/concrete contractor first to ensure that the level of the new surface will not be any higher than the existing gravel.1
-
Mistral001 said:I would put in the gates first at a level based or the present gravel level, but I would check with the tarmac/concrete contractor first to ensure that the level of the new surface will not be any higher than the existing gravel.
Haven't contacted any contractors yet as still trying to decide what to go for.0
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 350.9K Banking & Borrowing
- 253.1K Reduce Debt & Boost Income
- 453.5K Spending & Discounts
- 243.9K Work, Benefits & Business
- 598.8K Mortgages, Homes & Bills
- 176.9K Life & Family
- 257.2K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.6K Read-Only Boards