Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Quote for partial gable end re-pointing and Dry Verge System
Lorna_Wallace
Posts: 8
Forumite
I've had a quote for the following work and would like some feedback on whether it seems reasonable or not.
Rake out and re-point brickwork, supply & fit dry verge system £2,490 incl VAT
Including:
• Scaffolding to be erected to gable end to allow access to area in question
• Loose perished mortar to be raked out and renewed from area of gable end roughly from line at horizontal level to bottom of first floor windows upward to verge
• Rake out mortar from verge as required, fit timber batten and supply and fit sectional dry verge system
• Replace any damp insulation to loft
• Brush down internal brickwork to inside of loft, and ensure rafter is not ‘bridging’ to brick work via blown or perished pointing
• Works estimated to be undertaken over three days
Any advice, thoughts etc welcome.
Rake out and re-point brickwork, supply & fit dry verge system £2,490 incl VAT
Including:
• Scaffolding to be erected to gable end to allow access to area in question
• Loose perished mortar to be raked out and renewed from area of gable end roughly from line at horizontal level to bottom of first floor windows upward to verge
• Rake out mortar from verge as required, fit timber batten and supply and fit sectional dry verge system
• Replace any damp insulation to loft
• Brush down internal brickwork to inside of loft, and ensure rafter is not ‘bridging’ to brick work via blown or perished pointing
• Works estimated to be undertaken over three days
Any advice, thoughts etc welcome.
0
This discussion has been closed.
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.3K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264.1K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards