Ready, steady… save!
You don’t need a chart to join in. Here are 2 ways to record your savings:
1. Cross it off
Pop a chart into your first post. Saved an amount? Cross it out! Read more »
£0.01 £0.02 £0.03
2. Write it down
Skip the chart and add updates to your first post. Read more »
“Another +£3 saved today. Go me!”
Use +£ before each new saving so it counts towards your total.
We’d like to remind Forumites to please avoid political debate on the Forum.
This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Structural Drawings and Buildings Regs Package
astreix
Posts: 238
Forumite
I have got planning approval for replacing a conservatory with a single storey extension and converting a garage to living space.
The former will require removal of external wall currently between kitchen and conservatory.
I have been quoted £2850 (including VAT) for
* One Structural Site Survey ( Pre-construction)
* Structural Designs and Calculations (according to the planning drawings submitted).
* Building Regulations Package
Location is in Surrey and close to London border.
Does this seem like a fair quote? I've got absolutely no clue
The former will require removal of external wall currently between kitchen and conservatory.
I have been quoted £2850 (including VAT) for
* One Structural Site Survey ( Pre-construction)
* Structural Designs and Calculations (according to the planning drawings submitted).
* Building Regulations Package
Location is in Surrey and close to London border.
Does this seem like a fair quote? I've got absolutely no clue
0
Comments
-
It's good value if you mean that it also includes the completion of work, if that is just for the preliminaries then no it's not good value!0
-
garrysibbald wrote: »It's good value if you mean that it also includes the completion of work, if that is just for the preliminaries then no it's not good value!
it includes a site survey, making the structural drawings and ensuring it complies with building regulations, submitting it to building control (fees extra for building control - £900+VAT) and liasing with them to get approval for plans.
is this counted as "preliminaries" or "completion of work"?0
This discussion has been closed.
Categories
- All Categories
- 356K Banking & Borrowing
- 255K Reduce Debt & Boost Income
- 456.3K Spending & Discounts
- 248.5K Work, Benefits & Business
- 606.2K Mortgages, Homes & Bills
- 179.1K Life & Family
- 264.1K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.7K Read-Only Boards