    Belfin, refuse any costs they send your way, dont pay a penny towards your smart meter install.

    The adaptor is around 3 quid and available to other suppliers.

    Just say no to any work mate, unless SSE cover the cost.
  • jefaz07
    jefaz07 Posts: 621 Forumite
    Part of the Furniture 500 Posts Name Dropper
    You need to read the ENA document. GER 1...reference 18 in this instance. Its written in conjunction with these, don’t let them lie to you or pass it back to other pole pole due to their lack of knowledge. In this it says a yellow handled ECV is probably fitted on an IGT site and it’s fine. They need an adaptor. Same with an old style ecv, they need a Liverpool fitting to go on top and it’s sorted. The only ecv they needs exchanging is a ‘thumb turn’ or butterfly ecv..the rest are fine.
    There is a lot of meter fitters out there who have no clue what they’re doing. I experience these every day. It’s a debacle. Below is the link to the document and tells you what they have to do! Even though they try to back heel them. Don’t let them get away with it


    http://www.energynetworks.org/assets/files/GER1%20Version%206%20v1.0.pdf
  • jefaz07 wrote: »
    You need to read the ENA document. GER 1...reference 18 in this instance. Its written in conjunction with these, don’t let them lie to you or pass it back to other pole pole due to their lack of knowledge. In this it says a yellow handled ECV is probably fitted on an IGT site and it’s fine. They need an adaptor. Same with an old style ecv, they need a Liverpool fitting to go on top and it’s sorted. The only ecv they needs exchanging is a ‘thumb turn’ or butterfly ecv..the rest are fine.
    There is a lot of meter fitters out there who have no clue what they’re doing. I experience these every day. It’s a debacle. Below is the link to the document and tells you what they have to do! Even though they try to back heel them. Don’t let them get away with it


    http://www.energynetworks.org/assets/files/GER1%20Version%206%20v1.0.pdf

    But then a Liverpool Fitting isn't the right one either :-/

    An adaptor is required, as I have previously stated, it also has nothing to do with the colour of the handle. The information is on page 52 of the document you linked.
  • jefaz07
    jefaz07 Posts: 621 Forumite
    Part of the Furniture 500 Posts Name Dropper
    edited 10 November 2019 at 2:20PM
    MeterMan wrote: »
    But then a Liverpool Fitting isn't the right one either :-/

    An adaptor is required, as I have previously stated, it also has nothing to do with the colour of the handle. The information is on page 52 of the document you linked.

    I’m aware of this. I didn’t say it was the fitting needed. I said issues also arise when a Liverpool fitting is needed.
    I said, like yourself, an adaptor is needed. Reference 18, the exact fitting is shown here.
    And it clearly has got something to do with the colour of the handle....reference 18 says ‘Yellow handle ECV Igt LP Sites’
    Exactly the same as what the OP has got, and is enquiring about.

    Page 52 talks about Medium Pressure ECV’s...the OP doesn’t have a medium pressure ECV so page 52 is not relevant.
  • MeterMan
    MeterMan Posts: 433 Forumite
    Seventh Anniversary 100 Posts
    ok sure, I guess im just talking out of my !!!! then
  • jefaz07
    jefaz07 Posts: 621 Forumite
    Part of the Furniture 500 Posts Name Dropper
    edited 10 November 2019 at 10:38PM
    MeterMan wrote: »
    ok sure, I guess im just talking out of my !!!! then

    It does seem that way.
    Give me some information to the contrary?

    You’re referencing a page with something that the op has not got!
    I’ve told you what part of the document it is, even shown you a picture which matches the OP’s picture.

    And I’ll say it again. The OP doesn’t have a medium pressure ECV
  • The original poster does have a medium pressure ecv, it just isn't a medium pressure supply.

    The type of connection from ecv to anaconda is a male ecv to a female anaconda, so the fitting in reference 18 doesn't fit as its a male to male fitting. The way the seal is created through the ecv and anaconda is that of a medium pressure type.

    I reference page 52, as it clearly states that:
    A number of Medium Pressure ECVs were installed for Low Pressure applications on a small
    number of iGT networks in the late 1990s and early 2000s. When installed they complied with
    the industry standards of the day. Should a MAM/meter installer require to exchange a LP meter
    and encounter an ECV rated for MP, suppliers and installers need to carry the appropriate
    adaptors to allow them to make connections to these ECVs

    Belfin hasn't offered any images or references to a yellow handled ecv, only that an IGT site needs an adaptor, which I am assuming is the same type as RozJCs
  • C_Mababejive
    C_Mababejive Posts: 11,668 Forumite
    Part of the Furniture 10,000 Posts Name Dropper Combo Breaker
    RozJC wrote: »
    Maybe it is...


    I can't be bothered with all the back and forth with their clueless phone operators, so I'll leave it for a bit and maybe call up again later down the line.
    I'm a bit late on this one. That mater installation belongs to an independent gas transporter ie the network does not belong to cadent. It could well be GTC as stated and as theyve fitted a standard ECV (how did they do that ?) then they must own it. That is not a MP supply. How do i know? Well its fitted with a low pressure regulator and not a Medium to low regulator. Fitting asmart meter in that on standard semi concealed meter box will require a special adaptor kit. Essentially this will be some metal brackets and connectors. You need to tell the gas supplier that you have a semi con box,its a low pressure supply and will need a semi con adaptor kit to fit the E6 smart meter..phew..
    Feudal Britain needs land reform. 70% of the land is "owned" by 1 % of the population and at least 50% is unregistered (inherited by landed gentry). Thats why your slave box costs so much..
This discussion has been closed.
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 351K Banking & Borrowing
  • 253.1K Reduce Debt & Boost Income
  • 453.6K Spending & Discounts
  • 244.1K Work, Benefits & Business
  • 599K Mortgages, Homes & Bills
  • 177K Life & Family
  • 257.4K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16.1K Discuss & Feedback
  • 37.6K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.