We'd like to remind Forumites to please avoid political debate on the Forum... Read More »
We're aware that some users are experiencing technical issues which the team are working to resolve. See the Community Noticeboard for more info. Thank you for your patience.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Boiler Install or WC Refurb (plus new radiator) - Which to do first ?
Options

NinaSwiss
Posts: 278 Forumite

I'm looking to upgrade my 18 year old regular boiler to a Combi if I can find a favorable quote. Also planning to re-furb the downstairs WC which will involve fitting new pipes and radiator. The jobs will be done by different companies.
Does it make sense to complete one job over the other ? If so, which and why ?
One boiler installer suggested I do the WC first - eg fit the radiator prior to new boiler install.
Another suggested it would be best to complete boiler install first before WC refurb/radiator install.
I'm happy to do them in any order that will be cost effective and less likely to void new boiler 10 year warranty.
Alternatively, I could just stick an electric hand towel drier in the small WC (2m L * 1M W * 2M h ). Just not sure of running costs though advantage is that I could use all year round to dry towels without firing up boiler.
Does it make sense to complete one job over the other ? If so, which and why ?
One boiler installer suggested I do the WC first - eg fit the radiator prior to new boiler install.
Another suggested it would be best to complete boiler install first before WC refurb/radiator install.
I'm happy to do them in any order that will be cost effective and less likely to void new boiler 10 year warranty.
Alternatively, I could just stick an electric hand towel drier in the small WC (2m L * 1M W * 2M h ). Just not sure of running costs though advantage is that I could use all year round to dry towels without firing up boiler.
Working towards:
[STRIKE]*House Purchase (2015)[/STRIKE] [STRIKE] *Top-up pension (2016)[/STRIKE] [STRIKE] *Clear CC (2016) [/STRIKE]
*Mortgage Overpayment (50% LTV by Jan 2020) *Clear student Loan(by Jan 2020)[STRIKE]*Save for a Car (2017)![/STRIKE]
*Making the most of life!!!
[STRIKE]*House Purchase (2015)[/STRIKE] [STRIKE] *Top-up pension (2016)[/STRIKE] [STRIKE] *Clear CC (2016) [/STRIKE]
*Mortgage Overpayment (50% LTV by Jan 2020) *Clear student Loan(by Jan 2020)[STRIKE]*Save for a Car (2017)![/STRIKE]
*Making the most of life!!!
0
Comments
-
Why have the 2 jobs completed by 2 companies?
If one company where able to do both at the same time, surely this makes sense.0 -
Why have the 2 jobs completed by 2 companies?
If one company where able to do both at the same time, surely this makes sense.
The boiler installation company quotes are very high so I'm abit scared to get them to quote for the WC as well.
Also, I'm not in a position to afford both jobs at the same time - perhaps I'll wait till I can do both at the same time (if cost effective) as current boiler still works and summer is nearly here.Working towards:
[STRIKE]*House Purchase (2015)[/STRIKE] [STRIKE] *Top-up pension (2016)[/STRIKE] [STRIKE] *Clear CC (2016) [/STRIKE]
*Mortgage Overpayment (50% LTV by Jan 2020) *Clear student Loan(by Jan 2020)[STRIKE]*Save for a Car (2017)![/STRIKE]
*Making the most of life!!!
0 -
Replacing a radiator should be a small job compared to installing a boiler, even if a few pipes need to be moved, so I would consider asking them to quote. You can always just decide to go with the boiler, if it's too much.
Did you get more than one quote for the boiler installation? If not, as the quote seems very high to you, why not ask another couple of companies to quote and compare the prices?0 -
The loo has never had radiator so new piping will need to be created from existing system which is in a different room.
I have received 3 quotes so far for a boiler upgrade (upgrade regular boiler in kitchen with tank in loft to Combination boiler) . Current system works but is slow and has sludge and pumping over - gives me problems every now and again and previous attempts to power flush turned out to be a waste of money.
Boiler is Worcester Greenstar 28CDi Compact Combi Boiler.
--- Quotes ---
AC Wilgar (Local Recommended Company) £3,800, 7 years warranty, Power Flush, no need to cut kitchen worktops as will use different route. 10 year warranty if filter included. The colleague that recommended them had same upgrade done 3 years ago for £1000 less!!!
British Gas - £4,100, 5 years warranty, Power Flush. I’ll need to arrange for Granite kitchen worktops to be cut to accommodate new pipes
EON- £3,500, 5 years warranty, Chemical Flush. I’ll need to arrange for kitchen worktops to be cut to accommodate new pipes
I've got two more Worcester approved installers coming to quote next week. Then I'll have a think on what to do next.
If all are more or less the same then I'll go with the first one as they are local and come highly recommended.
Property is a 3-bed mid terrace with 7 rads (soon 8).Working towards:
[STRIKE]*House Purchase (2015)[/STRIKE] [STRIKE] *Top-up pension (2016)[/STRIKE] [STRIKE] *Clear CC (2016) [/STRIKE]
*Mortgage Overpayment (50% LTV by Jan 2020) *Clear student Loan(by Jan 2020)[STRIKE]*Save for a Car (2017)![/STRIKE]
*Making the most of life!!!
0
This discussion has been closed.
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 350.9K Banking & Borrowing
- 253.1K Reduce Debt & Boost Income
- 453.5K Spending & Discounts
- 243.9K Work, Benefits & Business
- 598.7K Mortgages, Homes & Bills
- 176.9K Life & Family
- 257.2K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.6K Read-Only Boards