PLEASE READ BEFORE POSTING: Hello Forumites! In order to help keep the Forum a useful, safe and friendly place for our users, discussions around non-MoneySaving matters are not permitted per the Forum rules. While we understand that mentioning house prices may sometimes be relevant to a user's specific MoneySaving situation, we ask that you please avoid veering into broad, general debates about the market, the economy and politics, as these can unfortunately lead to abusive or hateful behaviour. Threads that are found to have derailed into wider discussions may be removed. Users who repeatedly disregard this may have their Forum account banned. Please also avoid posting personally identifiable information, including links to your own online property listing which may reveal your address. Thank you for your understanding.
📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
Building Survey has come back - can we negotiate?
Comments
-
Agree with the others. that is a great maintenance 'to do' list.
Start with getting the guttering and down pipes up to scratch and then work your way through the rest.
Sorting the rainwater goods and that blocked gully may well resolve the damp in the living room too.0 -
Hi Everyone,
I am a first time buyer, so please excuse any naive or confusing questions.
My new husband and I put an offer in on a house on 23 September. Searches have been done, mortgage approved etc. Getting close to exchange. In fact the sellers agent messages us today to encourage us to follow up with our solicitor about paying the deposit to them as soon as possible so that it's already with the solicitor when exchange happens so that completion can happen quickly thereafter. The is no chain so things are moving quickly.
As well as the mortgage lenders valuation report, we paid for a full independent building survey and we got the 24 page report back today.
I picked out the following concerns:
The report states:Summary of Repairs- Upgrade Insulation to roof frames-not sure what that is
- Clear gully to front area-easy no cost
- Investigate and eradicate dampness to front left corner of living room could be caused by issues below in list, how extensive is it. Cost unknown but sounds minor
- Overhaul and repair rainwater goods and waste pipes
- Overhaul and repair decked areas as below
Then, throughout the report amongst all the descriptions, and what have you, are a myriad of things...- Rear gutter is misaligned and more prone to overflowing. quick realignment maybe a bracket, is it actually overflowing. may not need anything doing The PVC rainwater pipe to the dormer appears to discharge on to the rear roof slope. normal practice, almost certainly no action needed
- Taped joint to the top entrance lobby rainwater pipe. Must be taken apart and reformed with proper joint. is it leaking if so then fix if not ideally fix but not emergency
- Some of the seals to some of the windows are deteriorating something to sort in time but not urgent
- External doors generally fair although seals are deteriorating as above
- Some internal doors requiring easing and adjusting couple of hours for a handy man
- Evidence of past water damage to the ceiling in the rear right corner of the kitchen, indicating there may have been leaks to the bathroom fitting at some point. is it still leaking if so fix if not, stainblock and repaint
- Main water external stop valve hatch cover is broken. nothing
- One bracket on upper section of bathroom waste pipe should be re-fixed. if it's not leaking don't worry
- Number of piping joints have been taped indicating leaking in the past. Pipes should be replaced in due course. maybe in due course, if they're not leaking then not anywhere near an immediate issue
- Risk of decay to timber decking which could not be inspected fully. what does that mean, is it rotten or not if not no problem
- Front lobby: cracked tile and loose grouting, not really an issue just cosmetic damage to door seal as above attend to in time
- Hall: Underside of stair possibly lined in asbestos board undisturbed not really a problem, maybe paint to seal it , Could actually be fibre cement
- Kitchen: Damage to seal of external door,as above attend to with windows and doors carcass of unit showing age that's age for you, it shows
- Downstairs WC: flushing mechanism to cistern not operating correctly simple hour for a handyman
- Bedroom 1: Air vent to rear painted shut
- Bedroom 3: One double glazed panel failed. really cheap fix Casements require easing, water staining to base of sill. maybe attend to in time if you replace windows and doors
Are these required repairs and issues things that we could negotiate on price about?
If so, how much would be realistic to ask the seller to deduct?
If we do negotiate a reduction is purchase price, do we have to apply for a new/different/lower mortgage?
Thanks,
Michelle
All of those issues are really sold as seen things, the vendor would reasonably say you saw general state of the windows etc
If you want my opinion the surveyor was struggling to find issues with the property, the windows aside I doubt there's a £1000 worth of work in the whole list. Don't bother holding up the process, get the deal done, get moved in and enjoy your new home, most of those jobs are totally within the realms of your first forays into DIY and home maintenance0 - Upgrade Insulation to roof frames-not sure what that is
-
as another poster said, that looks like a worthwhile survey!
also interested in who you used for the job? Could you PM me?0
This discussion has been closed.
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.6K Banking & Borrowing
- 253.4K Reduce Debt & Boost Income
- 453.9K Spending & Discounts
- 244.6K Work, Benefits & Business
- 600K Mortgages, Homes & Bills
- 177.2K Life & Family
- 258.2K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.6K Read-Only Boards