We’d like to remind Forumites to please avoid political debate on the Forum.

This is to keep it a safe and useful space for MoneySaving discussions. Threads that are – or become – political in nature may be removed in line with the Forum’s rules. Thank you for your understanding.

📨 Have you signed up to the Forum's new Email Digest yet? Get a selection of trending threads sent straight to your inbox daily, weekly or monthly!
The Forum now has a brand new text editor, adding a bunch of handy features to use when creating posts. Read more in our how-to guide

when to oil new untreated engineered floor

[FONT=&quot]Hi I am getting some Oak engineered untreated floor which I will oil with Osmo wax oil but when is the best time to oil it?[/FONT]

[FONT=&quot]I was thinking of oiling the planks loose and then gluing them once the oil is dry and then applying the second coat once its down and glued so that it gets an overall blanket of coating at the end which will catch any gaps etc. My reason for thinking to do it this way is because the planks will so easily mark with stains from handling and gluing and by treating them before they have had much handling I ensure a clean surface gets coated and protected.[/FONT]

[FONT=&quot]Obviously waiting until it is all down and then doing 2 coats will be quicker but it is a largish area (40m2) and will take me a few days to lay it all with all the cutting in and I am worried with all the walking about, clamping it together and gluing it will possibly get marked.[/FONT]

[FONT=&quot]What’s the most popular way or preferred way?[/FONT]
all the walking about, clamping it together and gluing it will possibly get marked.


Whats the most popular way or preferred way?

Comments

  • happyhero
    happyhero Posts: 1,277 Forumite
    Part of the Furniture 500 Posts
    [FONT=&quot]Also I've been trying to get the room done for Christmas, kids are hassling me to finish so they can put the decorations up, and I've been so messed about by the supplier that its getting difficult to achieve this now with the twice cancelled deliveries because they couldn't get the stock in time, so is there anything stopping me from oiling some individual planks straight away i.e. they are supposed to have 48 hours to acclimatise, will it prevent it acclimatising or anything like that?[/FONT]
    [FONT=&quot] [/FONT]
    [FONT=&quot]If I could oil some and get some drying I could be making some headway in that 48 hours by getting planks ready to glue with 1st coat already done.[/FONT]
This discussion has been closed.
Meet your Ambassadors

🚀 Getting Started

Hi new member!

Our Getting Started Guide will help you get the most out of the Forum

Categories

  • All Categories
  • 354.4K Banking & Borrowing
  • 254.4K Reduce Debt & Boost Income
  • 455.4K Spending & Discounts
  • 247.3K Work, Benefits & Business
  • 604K Mortgages, Homes & Bills
  • 178.4K Life & Family
  • 261.5K Travel & Transport
  • 1.5M Hobbies & Leisure
  • 16K Discuss & Feedback
  • 37.7K Read-Only Boards

Is this how you want to be seen?

We see you are using a default avatar. It takes only a few seconds to pick a picture.