new bathroom quote
becs
Posts: 2,101 Forumite
Help,
I'm at the end of my tether with plumbing quotes at the mo. We live near Peterborough and have rung over 25 plumbers for quotes to install new bathroom. Of which about 12 have bothered to come and 6 then bothered to send us written quotes. The problem is cheapest quote is £3500!
We want a new bath installing in same location but with wall mounted valve, sink and wc installing but places swapped over and a new recess shower installed with 4 bodyjets in an old airing cupboard. We need the old soil stack removing as it is internal and we are having a new external one put up to free up space. This is not part of the job. We have already moved the hot water tank out of the cupboard. We will remove the old suite,tiles and flooring. We will tile and lay the flooring ourselves in the new bathroom. There is at tops 2 weeks work. I had a very similar bathroom done just over a year ago near Huntingdon and paid £1000 labour charge and it took a week. Unfortunately the plumber there doesn't come up as far as us. I am just staggered at these quotes, am I being unreasonable here? Seems like we're doing alot of the work,dread to think what it would be if we weren't!
I'm at the end of my tether with plumbing quotes at the mo. We live near Peterborough and have rung over 25 plumbers for quotes to install new bathroom. Of which about 12 have bothered to come and 6 then bothered to send us written quotes. The problem is cheapest quote is £3500!
We want a new bath installing in same location but with wall mounted valve, sink and wc installing but places swapped over and a new recess shower installed with 4 bodyjets in an old airing cupboard. We need the old soil stack removing as it is internal and we are having a new external one put up to free up space. This is not part of the job. We have already moved the hot water tank out of the cupboard. We will remove the old suite,tiles and flooring. We will tile and lay the flooring ourselves in the new bathroom. There is at tops 2 weeks work. I had a very similar bathroom done just over a year ago near Huntingdon and paid £1000 labour charge and it took a week. Unfortunately the plumber there doesn't come up as far as us. I am just staggered at these quotes, am I being unreasonable here? Seems like we're doing alot of the work,dread to think what it would be if we weren't!
0
Comments
-
i would offer your old plumber an extra 500 quid for travel expenses!Get some gorm.0
-
Thanks,
Have tried but he's Cambridge based and it's a terrible journey from Cambridge to Peterborough and just too far so not interested unfortunately. I'm not against paying a plumber a reasonable rate but based on these quotes the plumbers round here are making at least £70k a year! Wonder if the taxman knows that this is such a wealthy area!0 -
One has to wonder whether they are all talking about you in a plumber's merchant somewhere in Peterborough. "Have you been asked to quote for that bathroom where....?"I'm at the end of my tether with plumbing quotes at the mo. We live near Peterborough and have rung over 25 plumbers for quotes to install new bathroom. Of which about 12 have bothered to come and 6 then bothered to send us written quotes. The problem is cheapest quote is £3500!
:eek: :eek: :eek: customer doing work alert! customer doing work alert! :eek::eek::eek:..... We will remove the old suite,tiles and flooring. We will tile and lay the flooring ourselves in the new bathroom......
You will be able to do all this to fit in with the plumber's schedule, I take it? You will be paying him even if you are late doing your work and he can't start when agreed? (please look closely at my avatar, the tongue is firmly in the cheek
)
You also realise that any guarantee you can expect to get will be very limited.
I've never been involved with a bathroom re-fit where the customer has done some of the work that hasn't taken more than 2 weeks elapsed time.There is at tops 2 weeks work.
OK it sounds a bit on the high side, but I don't know what the local market is like, nor what your bathroom looks like. If you've had 6 quotes, I can't see it getting much cheaper.I had a very similar bathroom done just over a year ago near Huntingdon and paid £1000 labour charge and it took a week. Unfortunately the plumber there doesn't come up as far as us. I am just staggered at these quotes, am I being unreasonable here? Seems like we're doing alot of the work,dread to think what it would be if we weren't!
Finally, please don't extrapolate one quote into an annual income, leave that to sloppy tabloid journalists. I have to pay for insurances, tools, a van, stock, accountant etc. before I even spend time quoting for jobs that 24 other people have been asked to quote for.A house isn't a home without a cat.
Those are my principles. If you don't like them, I have others.
I have writer's block - I can't begin to tell you about it.
You told me again you preferred handsome men but for me you would make an exception.
It's a recession when your neighbour loses his job; it's a depression when you lose yours.0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 352.5K Banking & Borrowing
- 253.7K Reduce Debt & Boost Income
- 454.5K Spending & Discounts
- 245.5K Work, Benefits & Business
- 601.4K Mortgages, Homes & Bills
- 177.6K Life & Family
- 259.4K Travel & Transport
- 1.5M Hobbies & Leisure
- 16K Discuss & Feedback
- 37.7K Read-Only Boards