Hi all,
I have got a construction engineer to do the calculations to support my chimney in loft while removing it from the first and second floor
Engineer charged me a decent sum and gave me a drawing which shows the model and type of still which should be used however not the legnth of the steel
Contractor is saying that is not my job and it should be on the drawing from engineers and vice versa
Do engineers need to specify the exact legnth of any beam etc?
I have got a construction engineer to do the calculations to support my chimney in loft while removing it from the first and second floor
Engineer charged me a decent sum and gave me a drawing which shows the model and type of still which should be used however not the legnth of the steel
Contractor is saying that is not my job and it should be on the drawing from engineers and vice versa
Do engineers need to specify the exact legnth of any beam etc?
0
Comments
-
Our structural engineer doesn't put the length. I presume because the opening isn't exactly set until it's made and they can't be responsible for the builder's size of opening.
Building regs require a certain depth of overhang to comply so it's easy to work out if you know what you're doing.Everything that is supposed to be in heaven is already here on earth.
0 -
where you are doing alterations beams are generally site sized - the engineer should have a minimum bearing distance (usually 150mm) for the beam but the length would measured by the contractor on siteThis is a system account and does not represent a real person. To contact the Forum Team email forumteam@moneysavingexpert.com0
-
So are are they just removing first/ second floor of chimney breast but leaving below and above that’s a strange way to do it ?0
-
The structural engineer should have specified the "span" of the beam to do his calculations. The builder then just has to add the span (width of opening) and the end bearings to get the overall length.
It sounds like the engineer has not provided a copy of the calculations which you will need to submit to Building Control.0 -
My daughter had this work done last year,the structural engineer did not advice the length of the rsj, he said this was for the builder to calculate, seems its normal practice.0
This discussion has been closed.
Confirm your email address to Create Threads and Reply
Categories
- All Categories
- 355.6K Banking & Borrowing
- 254.8K Reduce Debt & Boost Income
- 456.1K Spending & Discounts
- 248.2K Work, Benefits & Business
- 605.7K Mortgages, Homes & Bills
- 179K Life & Family
- 263.5K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.1K Discuss & Feedback
- 37.7K Read-Only Boards