Fitting only - half bathroom.
![[Deleted User]](https://us-noi.v-cdn.net/6031891/uploads/defaultavatar/nFA7H6UNOO0N5.jpg)
[Deleted User]
Posts: 0 Newbie


Small bathroom. We had someone in already to do the bath and do the walls (the plastic sheet stuff). Charged us something like £250 for day and halfs work.
Anyway, cut long story short but hes not available to do the rest.
So got a quote from someone else. Fit new toilet, fit wooden floor, fit new cupboards (already built), new worktop, two new sinks. Very small bathroom (3x3m max). They reckoned two days work max.
Quote = £1600 :mad::mad::mad:
£100 an hour then based on 8 hour day. Am I right in thinking this is a bit pricey to say the least?
Anyway, cut long story short but hes not available to do the rest.
So got a quote from someone else. Fit new toilet, fit wooden floor, fit new cupboards (already built), new worktop, two new sinks. Very small bathroom (3x3m max). They reckoned two days work max.
Quote = £1600 :mad::mad::mad:
£100 an hour then based on 8 hour day. Am I right in thinking this is a bit pricey to say the least?
0
Comments
-
Please see below a breakdown of work and costs to finish your bathroom.
- plastic clad to replace tiled areas £300 (labour only)
- fit PVC window sill £60 (materials inc)
- fit toilet with vanity unit £300 (labour only)
- fit 2x vanity units with plumbed sinks £400 (labour only)
- lay flooring and underlay £150 (labour only)
- specialised cut and fit stone worktop £300 (labour only)
- seal bathroom, furniture, floor etc, general finishing works £100 (materials inc).
Total £1610 inc VAT0 -
Get other quotes, up north would cost you about £120/£160 per day per man, plus materials0
-
-
In no way casting any aspersions. But if I am brought in to a job that has been started, work completed to a reasonable standard and the contractor has left. I would want to know why with a strong suspicion it boils down to lack of money. possibly resulting in a high estimate to get me out of it.0
This discussion has been closed.
Confirm your email address to Create Threads and Reply

Categories
- All Categories
- 351.4K Banking & Borrowing
- 253.3K Reduce Debt & Boost Income
- 453.8K Spending & Discounts
- 244.4K Work, Benefits & Business
- 599.7K Mortgages, Homes & Bills
- 177.2K Life & Family
- 258K Travel & Transport
- 1.5M Hobbies & Leisure
- 16.2K Discuss & Feedback
- 37.6K Read-Only Boards